Attachment K - HSTP Design
Very large file (11.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
5.0 DESIGN RECOMMENDATIONS We recommend the installation of a 10ep (min capacity) domestic wastewater treatment plant to treat the domestic wastewater to an advanced secondary quality. If the integrity and serviceability of the existing Taylex treatment plant is confirmed we recommend its ongoing use with appropriate monitoring, maintenance and servicing. The treated effluent is to be pump-dosed into and along the fixed low pressure heavy droplet spray irrigation system. The number of spray outlets and type of spray outlet will be confirmed onsite prior to or during commissioning of the facility and may require isolating or dosing valve mechanisms. This will help the Land Application Area receive treated effluent and residuals in a manner and at a rate that enables their further treatment by natural in-soil stabilisation processes so that the resulting clarified carriage water is environmentally and hygienically acceptable for groundwater infiltration or evaporation and plant transpiration into the atmosphere. The final location of a new treatment plant will be determined on-site by variable consequences (eg finished floor levels, distances, allotment configuration and topographical constraints) over which we have little control. We recommend further consultation to determine the adequacy of the final location of the treatment plant at the time of, or prior to construction of the proposed dwelling. Notwithstanding the final location of the treatment plant/tank and the Land Application Area particular attention should be paid to protecting any, or all pipework below driveways, access tracks, or such trafficable areas. Our recommendations do not preclude other or additional Land Application Facilities. Wastewater Treatment Systems and Land Application Facilities should be designed to remove as much nitrogen as possible by ammonification, settlement in sludge, denitrification, long residence times or plant uptake. Water conservation implementation will reduce the hydraulic load on the Land Application Facility and subsequently improve its performance and serviceable life. Effluent quality from the treatment plant must comply with the criteria presented in the Queensland Plumbing and Wastewater Code and AS/NZS 1547-2012 On-site Domestic Wastewater Management and be confirmed with the regulatory authority. Treated effluent shall be filtered before delivery to the Land Application Area. All filters shall be checked and cleaned regularly, or as required. Unearthed Geotechnical P/L. 6 Design Report 023-038
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.