Original source · versioned page text
2017-04-11 P&E Agenda Attachment 1 to Item 1 Housing Needs Assessment
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Table 21. National benchmarks for aged care, 2016-2036
Service 2016 2021 2026 2031 2036
Residential care 80 80 80 80 80
Home care 34 (b) 45 45 45 45
Total 114 (a) 125 125 125 125
Notes: (a) Based on the average of the 2011 and 2021 targets. (b) Based on the calculated total target ratio and
residential care ratio.
Sources: Australian Government 2013; 2016a;
To enable development and financial investment in residential aged care facilities, places are
allocated to providers before they finalise their development plans and begin construction.
Provisionally allocated places remain current for two years and they can be extended, revoked or
surrendered (Australian Government 2016). The Australian Government has announced plans to
increase the time period that a provisionally allocated place remains current to four years, with
the option for two additional 12 month extensions (Australian Government 2015c).
A comparison between allocated and operational places was undertaken for the past few years to
understand the timeframes involved in converting allocated places to operational places and it
was found that it can take more than 5 years for the number of allocated places to become
operational. Therefore, it has been assumed that:
The number of operational places and temporarily offline places at 30 June 2015 will be
assumed to be the current level of provision and will be benchmarked against the
population of the region 70 years of age and older at 30 June 2016.
The number of provisionally allocated places and places which have recently been
allocated under the 2015 Aged Care Allocation Round (ACAR) will be assumed to be the
level of future provision at 30 June 2021 and will be benchmarked against the population
at that time. It is therefore assumed in the benchmarking that all of the provisionally
allocated places and recent allocations will be provided within this 5 year period.
The results of the benchmarking analysis are shown in Table 23 below. The number of allocated
residential aged care places at 30 June 2016 was around 198 places lower than the federal target,
while the number of home care places was around 146 places lower. With population growth and
an increase in the target ratio, and accounting for additional home care packages recently
allocated, the shortfall in provision of home care packages increases to 993 places, however, if all
of the residential aged care places that have been provisionally allocated are delivered (which is
unlikely), there could be a 751 surplus of residential aged care places in the region in 2021. By
2026 however, both residential and home care places are projected to be in deficit.
Briggs & Mortar Pty Ltd | Page 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.