Attachment 4 - Revised Architectural Plans_LR
Plans and drawings: the text below has words only, no drawings.
Rev Description Date
A Preliminary Issue 03/06/24
B Orientation rotated 180° 04/06/24
C Design Review 04 13/06/24
2a
Pitch 3° Colorbond trimdek roof installed
to manufactures specification
Colorbond eaves gutter
- refer hydraulic details
Bird proofing mesh installed
Roof 1 to U/S of portal frame
13000
Steel portal frame
to engineers detail
5500
150 dia PVC downpipe
Do not scale drawings. Use written dimensions only
Contractor to verify all dimensions & levels on site prior
to commencing any work or making any shop drawings
150 dia steel bollard
with concrete infill
call 0411 125 425
email [email protected]
Concrete pavement Stormwater drainge post box 5337 maroochydore qld
Gnd pit qbcc lic. 1070982
abn 33 080 662 473
7500
Project
Concrete pad footing
Noosa Bus Depot
to engineers details 5-13 Production Street
Noosavile, Qld.
Title
Charging Station
- Section C
Section C
C Scale 1 : 50 Client
Integral Construction
Issue
Preliminary
Dwn North Point
GT
App
Scale
1 : 50 (at A3)
Date
13/06/2024 1:33:24 PM
0 0.5 1 1.5 2 2.5 Dwg No Rev
1:50 1580 - WD204 C
© This drawing is Copyright and is owned by tyson design studio
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.