Council archive · source document
SPCC04701712 · OPW12/0139
Attached to the e-mail DERM Concurrence agency response - OPW12/0139.
EHP Permit number: SPCC04701712 CONDITIONS Al. All works are to be constructed and maintained in accordance with the drawings and specifications indicated in Table 1. Plans & Documents or any subsequent endorsed amendments to those plans unless the plan conflicts with a condition of this approval in which case the conditions take precedence. A2. The chief executive administering the Coastal Protection and Management Act 1995 may order the works to be removed or modified within a reasonable time, if the works have or are likely to have a significant effect on coastal management because the works: (a) create a navigation hazard or other danger to the public; or (b) cause erosion or land degradation; or (c) are unstable; or (d) have not been constructed according to the plans (Table 1. Plans and Documents). A3. The chief executive administering the Coastal Protection and Management Act 1995 may suspend or cancel this permit, if the works have or are likely to have any significant impacts on coastal management. A4. A report from a Registered Professional Engineer of Queensland (RPEQ) must be submitted to the administering authority within three months from the date of completion of the works, certifying that: (a) The works (including any other associated works) has been constructed in accordance with the plans and documents (Table 1 — Plans and Documents); and (b) The works are structurally adequate for its intended location and anticipated usage; and (c) The bed or banks of the waterway for a distance of 15 metres around the site of the works are clear of all debris. Ad. All reasonable and practicable measures must be taken to prevent or minimise an increase in turbidity or the release of contaminants as a result of these works to surrounding waters. AG. Any material or debris associated with the works that is unlawfully deposited into waters must be removed. AT. All temporary works associated with the construction of the works are to be removed from the site at the completion of the works. A8. During and following the works, any areas disturbed by the works must to be effectively stabilised to prevent erosion and sediment runoff. AQ. There must be no damage or removal of vegetation on State coastal land above high-water mark without the written approval of the entity responsible for the management and control of the land; or other lawful authority, justification or excuse. END OF CONDITIONS Page 3 of 4 * 120607 « Version 1 Department of Environment and Heritage Protection (IER.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPCC04701712.pdfRelated documentApplication case desk ↗
About this file
- File size
- 337 KB (small file)
- File type
No other editions are linked here.