Council archive · source document
RFI - Attachment D - Amended Engineering Drawings · 132008.1128.04
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
SUBSOIL DRAIN CLEANOUT.
CIVIL CONTRACTOR TO COVER FILTER MEDIA WITH REFER DETAIL
25mm COARSE SAND AND TURF FOR TEMPORARY
COVER DURING CONSTRUCTION. LANDSCAPERS TO
REMOVE SILT AND TURF WHEN READY FOR PLANTING
RL 18.395
FILTER CLOTH OVER INSITU SOIL 300 MIN.
PIN FILTER CLOTH ABOVE PONDING LEVEL.
600mm FILTER MEDIA.
FILTER MEDIA <0.05-3.4mm PARTICLE SIZE.
BIO RETENTION INSTALLATION STANDARD NOTES:
100mm TRANSITION LAYER. 0.5-2.0mm
TRANSITION LAYER CONSTRUCTION OF THE BIO-RETENTION BASIN IS TO FOLLOW STANDARDS AND PROCEDURES OUTLINED IN
PARTICLE SIZE (TYP COARSE SAND)
BIO-RETENTION TECHNICAL DESIGN GUIDELINE (WATER BY DESIGN) AND WSUD CONSTRUCTION AND ESTABLISHMENT
GUIDELINES - SWALES, BIORETENTION SYSTEMS AND WETLANDS (WATER BY DESIGN). THE PLACEMENT OF DRAINAGE,
300mm DRAINAGE LAYER. 2.0-5.0mm TRANSITION AND FILTER MEDIA LAYERS MUST BE UNDERTAKEN CAREFULLY TO ENSURE CORRECT DEPTH, SLOPE AND
PARTICLE SIZE (TYP FINE AGGREGATE) COMPACTION:
DRAINAGE LAYER DEPTH: FILTER MEDIA SHOULD BE INSTALLED AND COMPACTED IN TWO LIFTS FOR DEPTHS OVER 500mm.
SLOPE: THE TOP SURFACE OF THE DRAINAGE LAYER, TRANSITION LAYER AND FILTER MEDIA LAYER SHOULD BE FLAT.
A SPREADER BAR SHOULD LEVEL THE SURFACE OF EACH LAYER.
SLOTTED PVC DRAINAGE (UN-SOCKED) GRADED AT 0.5% FILTER CLOTH TO BE INSTALLED TO SIDES COMPACTION: THE FILTER MEDIA MUST BE LIGHTLY COMPACTED DURING INSTALLATION TO PREVENT THE MIGRATION
TOWARDS FIELD INLET. PIPE TO HAVE MIN 50mm OF TYPICAL BIO-RETENTION BASIN DETAIL OF BASIN ONLY. DO NOT INSTALL UNDER OF FINE PARTICLES. THIS CAN BE ACHIEVED WITH A SINGLE PASS OF A LIGHT ROLLER SUCH AS A DRUM LAWN ROLLER.
SCREENINGS ABOVE. REFER DRG 4002-401 FOR SIZING BASIN OR BETWEEN LAYERS A VIBRATING PLATE CAN ALSO BE USED TO COMPACT SMALL BIO RETENTION SYSTEMS OR 'POZITRACK' BOBCATS CAN
1:10 @ A1 | 1:20 @ A3
BE USED FOR LARGE SYSTEMS. ENSURE ONLY ONE COMPACTING PASS IS MADE OVER THE MEDIA FOR LIGHT
COMPACTION.
N12 LONGITUDINAL
N12 TIE BARS @ 200 CTRS. 150 LENGTH VARIES STONE BIO-RETENTION/DETENTION BASINS CONSTRUCTION SEQUENCE AND NOTES:
PITCHING
150mm HIGH CONCRETE HOB 1. ESTABLISH SEDIMENT AND EROSION CONTROL MEASURES IN CATCHMENT, INCLUDING SILT FENCES, SEEDING OF
WITH SLOTS EVERY 1-2m. REFER ALLOTMENTS, & FULL WIDTH VERGE TURFING.
RCBC
200
TO TYPICAL SLOT DETAIL 150 THICK CONCRETE, SL82 2. SURVEY BASIN LOCATION.
REINFORCING, 50 TOP COVER. 3. EXCAVATE SURROUNDING LANDFORM TO DESIGN SUBSOIL LEVEL (ACHIEVING SURROUNDING LEVEL AT THIS
STAGE REDUCES THE NEED FOR EARTHWORKS ADJACENT TO THE BASIN AFTER THEY HAVE BEEN
1.0% FALL CONSTRUCTED).
C C C C C C C C 4. EXCAVATE BASIN TO DESIGN DEPTH ENSURING BASE OF POD HAS MINIMUM 0.5% GRADE TOWARDS PIT. ENSURE
BASE OF BASIN IS FREE FROM DEBRIS.
FILTER INSITU SOIL TO REMAIN UNDER COARSE SUPERINTENDENT INSPECTION AND SIGN OFF REQUIRED BEFORE PROCEEDING.
MEDIA SEDIMENT FOREBAY. GEOTECHNICAL ENGINEER TO 5. LINE SYSTEM WITH GEOFABRIC, AND EXTEND GEOFABRIC A MINIMUM OF 500 MM BEYOND TOP OF EXCAVATION.
CONFIRM COMPACTION REQUIREMENTS. STRUCTURAL THESE ARE THE FLAPS REFERRED TO IN ITEM 13 BELOW.
ENGINEER TO CONFIRM FOOTING REQUIREMENTS. 6. SUBSOIL DRAINAGE TO BE INSTALLED.
7. NOTE THAT CORRECT FUNCTIONING OF THE DRAINAGE PIPES IS CRITICAL TO THE PERFORMANCE OF THE
BIORETENTION SYSTEM. DIG TRENCHES IN DRAINAGE LAYER AND PLACE DRAINAGE PIPES. ENSURE PIPES ARE
LAID AT MIN 0.5% SLOPE WITH NO LOCALIZED DEPRESSIONS VERIFIED USING LEVEL OR STRING LINE. ALL JOINTS
LAY FILTER CLOTH OVER INSITU SOIL 300 MIN. PIN FILTER CLOTH AND JUNCTIONS IN PIPES TO BE SEALED. CONNECT CLEAN OUT POINTS ENSURING TOP OF CLEAN OUT POINTS
TO INSITU SOIL AND LAY CONCRETE ONTO FILTER CLOTH. ARE NOT LESS THAN 50mm BELOW OVERFLOW PIT CREST. CLEAN OUT POINTS ARE CONSTRUCTED STRICTLY IN
ACCORDANCE WITH IPWEA STD DRG DS-073.
TYPICAL FOREBAY SECTION SUPERINTENDENT INSPECTION AND SIGN OFF REQUIRED BEFORE PROCEEDING.
SCALE 1:20 @ A1 8. COVER DRAINAGE PIPES WITH DRAINAGE MATERIAL, ENSURING DESIGN COVER.
SUPERINTENDENT INSPECTION AND SIGN OFF REQUIRED BEFORE PROCEEDING.
9. PLACE FILTER MEDIA (USING ONLY PRESCRIBED MATERIAL) TO DESIGN LEVEL (REFER DRAWINGS). SPREAD
MATERIAL USING EXCAVATOR BUCKET OR HAND TOOLS TO OBTAIN LIGHT AND EVEN COMPACTION OF FILTER
MEDIA. DO NOT DRIVE OVER FILTER MEDIA WITH ANY VEHICLE AS EXCESSIVE COMPACTION CAN IMPEDE
0.5m2 GROUTED ROCK DRAINAGE THROUGH THE FILTER MEDIA. FILTER MEDIA SURFACE MUST BE LEVEL (HORIZONTAL) AND FREE FROM
PITCHING ADJACENT TO SLOTS BIORETENTION SLOTTED PVC CLEANOUT POINT - 100Ø DRAINAGE LOCAL DEPRESSIONS AND SET AT THE DESIGN LEVELS NOMINATED IN THE PROJECT DRAWINGS. AS SOON AS
(100-150 NOMINAL DIAMETER) FILTER MEDIA PIPE. CLEANOUTS AT HEAD OF SUBSOIL DRAIN AT FILTER MEDIA IS PLACED IT MUST BE IMMEDIATELY COVERED WITH GEOFABRIC AND 25mm SANDY TOPSOIL AND
MAX SPACING OF 30.0m TURF WHICH MUST REMAIN IN PLACE AT ALL TIMES.THIS PROTECTIVE COVER IS ONLY TO BE REMOVED BY
C.I CAP EXTEND TO APPROX 50mm LANDSCAPERS IMMEDIATELY PRIOR TO PLANTING.
ABOVE BASIN SURFACE WITH LOCKING PROVISION C C C C C C
10. FLUSH DRAINAGE PIPES TO REMOVE ANY INITIAL INGRESS OF MATERIAL AND TO ENSURE ADEQUATE DRAINAGE.
FINAL SUPERINTENDENT INSPECTION AND SIGN OFF
UN-SLOTTED PIPE NOTE THAT BETWEEN STEPS 3 – 10 ABOVE THE BASINS WILL BE SUSCEPTIBLE TO STORM DAMAGE. THEREFORE
350x350x150 CONCRETE SURROUND
ONCE COMMENCED PODS MUST BE COMPLETED AS SOON AS POSSIBLE TO MINIMISE THE RISK OF STORM DAMAGE.
ELBOW SLOTTED PVC PIPE INSPECTION IS REQUIRED IF RAINFALL EVENT OCCURS BETWEEN CONSTRUCTION STEPS 3 – 10 ABOVE.
50-100 WIDE [email protected]
SPACINGS ALL JOINTS TO BE SOLVENT WELDED &
SEALED WITH TAPE
TYPICAL SLOT DETAIL BIOPOD POD SUBSOIL DRAIN
SCALE 1:20 (A1)
CLEANOUT
SCALE 1:20
FILE: 5002-406.dwg DATE: 08-04-2020 USER: NICK VENESS
XREFS: X-18-001942-5002-TITLE
DESIGN DRAWN CHECK APPROVED DATE STATUS SCALE CLIENT PROJECT DRAWING TITLE
FIRST AMENDMENT DETAILS Calibre Professional Services (QLD) Pty Ltd
ISSUE CR CR SP SP 08.04.20
TENDER Level 3, 16 Innovation Parkway BLUE CARE SUNRISE BEACH BIO RETENTION
A CR CR SP SP 30.07.20 ISSUED FOR TENDER Birtinya QLD Australia 4575
A
M B NOT FOR CONSTRUCTION 0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6
Telephone 07 5314 2520
Facsimile 07 5314 2522
RESIDENTIAL AGED CARE (RAC) NOTES AND DETAILS
E
C
N
D
M D
APPROVED SCALE 1:20 (A1) SCALE 1:40 (A3) ROADWORKS & DRAINAGE
E BY: SHAUN PILCHER RPEQ 14593 DISCLAIMER
PROJECT No. DRAWING No. REVISION
E
N ALL DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR
F
T
S
G SIGN: DATE: 30.07.20
C calibregroup.com PRIOR TO CONSTRUCTION. USE WRITTEN DIMENSIONS ONLY,
DO NOT SCALE.
18-001942 5002-406 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment D - Amended Engineering Drawings.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.