Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Town Planning Report

Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                              town planning
                                     report


4.1.3   Refuse Collection and Servicing

Servicing and refuse collection will be from Wimmers Lane. Refer to attached Traffic Engineering Report
for detail.

4.1.4   Infrastructure & Servicing

A Civil Engineering Services Report and Stormwater Management Plan, prepared by vt Consulting
Engineers are included at Attachment G. The report addresses required earthworks, roadworks,
stormwater drainage (including proposal for increasing the current stormwater pipe size and re-routing
within the site), sewer and water reticulation and electrical and telecommunication provision for the
development.


4.1.5   Acoustic

An Acoustic Report prepared by MRG Environmental is included at Attachment H. The report assesses the
impact of the proposed development onto surrounding sensitive receivers.




   saunders havill group                       page 14                                      Job 7588
Log in to download the original file

Town Planning Report.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.