Original source · versioned page text
Town Planning Report
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
town planning
report
4.1.3 Refuse Collection and Servicing
Servicing and refuse collection will be from Wimmers Lane. Refer to attached Traffic Engineering Report
for detail.
4.1.4 Infrastructure & Servicing
A Civil Engineering Services Report and Stormwater Management Plan, prepared by vt Consulting
Engineers are included at Attachment G. The report addresses required earthworks, roadworks,
stormwater drainage (including proposal for increasing the current stormwater pipe size and re-routing
within the site), sewer and water reticulation and electrical and telecommunication provision for the
development.
4.1.5 Acoustic
An Acoustic Report prepared by MRG Environmental is included at Attachment H. The report assesses the
impact of the proposed development onto surrounding sensitive receivers.
saunders havill group page 14 Job 7588
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.