Town Planning Report
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
town planning
report
6. Key Planning Issues
An assessment of the development against the relevant provisions of the Noosa Planning Scheme (refer to
code response at Attachment K) has identified only few areas where the development does not comply
with the applicable Acceptable Outcome. Where compliance with the Acceptable Outcome is not
achieved, a performance-based approach is sought for these parameters. We believe the development
outcome provided on the site is consistent with the relevant Performance Criteria and the development
will be a positive addition to Cooroy Township.
6.1. Code Compliance
While the development is inconsistent with the Acceptable Outcomes – Building Height S7.1, Roof Pitch
S16.1 and Awning Design S58.1, it is considered to be consistent with the respective Overall Outcomes as
outlined within the Code response table at Attachment K.
6.2. Servicing
The Traffic Impact Assessment prepared by PTT (Attachment F) assess servicing requirements for the site,
provides an assessment of HRV access to the site via Wimmers Lane and includes sweep path analysis to both the
Maple Street and Wattle Street intersections. The assessment concludes that no upgrade to Wimmers Lane is required
by this development and that adequate manoeuvring provision exists at both the Wattle St and Maple St
intersections.
saunders havill group page 17 Job 7588