Skip to the record
For the highest quality transcripts.

Original source · versioned page text

1856-CMP-01 [Prelim] August 2020

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

DOCUMENT INFORMATION

  Document Title:                          Construction Management Plan (Prelim)


  Document Reference No.                   1856_CMP_01


  Commissioned By:                         Stockwell Development Group Pty Ltd


  Prepared By:                             Barlow Shelley Consulting Engineers (Aust) Pty Ltd


  Author:                                  Cameron Landreth (BEng, NER, RPEQ)


DOCUMENT CONTROL

        Version                   Date                   Author                  Reviewer


            1.0             31 August 2020          Cameron Landreth       Cameron Landreth

“©2020 Barlow Shelley Consulting Engineers (Aust) Pty Ltd All Rights Reserved. Copyright in the
whole and every part of this document belongs to Barlow Shelley Consulting Engineers (Aust)
Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any
manner or form or in or on any media to any person without the prior written consent of Barlow
Shelley Consulting Engineers Pty Ltd”




Preliminary Construction Management Plan                                                        2
August 2020
Log in to download the original file

1856-CMP-01 [Prelim] August 2020.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.