Skip to the record
Search everything, all in one place.

Original source · versioned page text

1856-CMP-01 [Prelim] August 2020

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                                                                                                                                                                                www.invarion.com

                                                                       STOCKWELL ­ NOOSA CIVIC ­ SOUTHERN ENTRY ­ NOOSAVILLE
                      N                                                       ROUNDABOUT CONSTRUCTION ­ STAGE 2
      TGS #: SW­NOOS­TGS2
                                                                                              ER                             TGS SPECIFIC NOTES
                                                                                          UD
                                                                                        EC                                   1). THIS ARRANGEMENT IS DEVELOPED IN ACCORDANCE WITH CLAUSE 4.2 OF THE MUTCD ­ 2019.
                                                                                  EPS          EH
                                                                                                  A
                                                                               DE            DA OW                           2). SIGNS THAT ARE INAPPROPRIATE TO, OR CONFLICT WITH, THE WORKSITE SITUATION SHALL BE COVERED OR REMOVED. (REF. CLAUSE 2.4.4 ­ MUTCD ­ 2019)
                                                                                  03
                                                                                              KR OR
                                                                                               DA                            3). LONG TERM SIGNS SHOULD BE ERECTED ON POSTS 2.2m ABOVE LEVEL OF KERB OR FOOTPATH TO THE UNDERSIDE OF THE SIGN (REF. CLAUSE 2.5.2 – MUTCD – 2019).
                                                                                                                             4). ALL SIGNS TO BE MOUNTED IN PROMINENT POSITIONS WITH CLEAR LINE OF SIGHT TO ONCOMING TRAFFIC. (REF. CLAUSE 2.5.2 ­ MUTCD ­ 2019).
                                                                                                                             5). CONSTRUCTION VEHICLES MUST ENTER AND LEAVE SITE IN A FORWARDS DIRECTION. WORK VEHICLES ARE NOT PERMITTED TO STOP AND/OR REVERSE ON PUBLIC ROADS
                                                                                                                                 WITHOUT TRAFFIC CONTROL.
                                                                                                            ER               6). WORKMAN (SYMBOLIC) SIGNS TO BE COVERED WHEN WORKERS HAVE LEFT THE AREA OR ARE NO LONGER VISIBLE TO TRAFFIC.(REF. CLAUSE 3.4.4 ­ MUTCD).
                                                                               15m                    ECUD
                                                                                             DEEPS
                                                                                                                             7). 3m MIN LANE WIDTH REQUIRED FOR ALL OPEN TRAFFIC LANES AT ALL TIMES. (REF. CLAUSE 4.13.3 ­ MUTCD).
                                                                                                              NOC
                                                                                                       SNOITID T             8). SPOTTERS MAY BE REQUIRED TO ASSIST WORK VEHICLE INGRESS/ EGRESS
                                                                                               03        CIFFAR
                                                                                                         DEGNA
                                                                                                                HC           9). FOR ADDITIONAL NOTES RELATING TO THIS TGS PLEASE REFER TO THE GENERAL TRAFFIC GUIDANCE SCHEME NOTES SUPPLIED WITH THIS SET OF TGS DIAGRAMS

                                                                      END
                                                                      ROAD
                                                                      WORK

                                                                      SAFELY
                                                                                      15m
                                                              DRIVE                                DEEPS ECUDER




                                                                                                                                                                                                                                                    WALTER HAY DR
                                                                                                   03

                                                                                                                            15 m TAPER




                                                                                                                                                                                                           E
                                                                                                                                                                                             DR          R ND
                                                                                                                  TEMPORARY CROSSING                                                           IV       W OAD
                                                                                                                                                                                                 E       OR
                                                                                                                                                                                                     SA     K
                                                                                                                 THROUGH MEDIAN ISLAND                                                                 FE




                                                                                                                                                 PEDESTRIANS
                                                                                                                                                                                                         LY




                                                                                                                                                                                                                                                                    REDUCE SPEED
               ADDITIONAL LIGHTING                                                                                                                                 RY
                                                                                                                                          NOOSA CIVIC ­ S/EAST ENT




                                                                                                                                                                                                                                                   AHEAD
                                                                                                                                                                                                                                                   WORK
                                                                                                                                                                                                                                                   ROAD
                                                                                                                                                                                       20m
                                                                                                                                                                                                                                             30m
                                                                                                                                                                                                                                                                                               LEGEND




                                                                                                                                                                        REDUCE SPEED
                                                                                                                                                               30
                                                                                                                                                                                                                                                                                    = WORK AREA




                                                                                                                                                                                                            REDUCE SPEED
                                                                                                                                                                                                30
                                                                                                                                                               CONDITIONS
                                                                                                                                                                                                                                      30m                                           = SIGNAGE PLACEMENT
                                                                                                                                                               CHANGED
                                                                                                                                                                TRAFFIC
                                              SNAIRTS
                                                     EDEP

                                                                                                                                                                                                                                                                                    = BOLLARDS ­ CLOSE DELINEATION
                                                                                                   SNAIRT
                                                                                                                                                                                                                                                                                    = PEDESTRIAN MESH FENCING
                                                                                                          SEDEP

                                PEDESTRIAN RAMPS                                                                                                                                                                                                                                    = TEMP. HAZARD MARKER
                                                                                                                                                                                                                           ROAD
                                   IF REQUIRED                                                                                                                                                                             WORK
                                                                                                                                                                                                                           AHEA
                                                                                                                                                                                                                                D                                                   = NEW FOOTPATH
                                                                                                                                                                                                                                         D
                                                                                                                                                                                                                                 D  E ROA                                           = EXISTING FOOTPATH
                                                                                                                                                                                                                           ON SI

                                                                                                                                                                                                                                                                                     = SITE FENCE

            REV DATE     DESCRIPTION:                           CLIENT:             STOCKWELL                                            TGS IMPLEMENTATION DATE: TBA                                                                                                                                  DIAGRAM PREPARED BY:
             00 30/08/20 PRODUCED FOR SUBMISSION TO COUNCIL     LOCATION:           NOOSA CIVIC ­ SOUTH ENTRY                            HOURS OF OPERATION:      0000 ­ 2400                                                                                                                              GUY HALLIDAY
                                                                                                                                                                                                                                                                                          Dept. Transport & Main Roads
             01                                                 PLAN NUMBER:        SW­NOOS­TGS2                                         TRAFFIC MANAGEMENT:      REGULATORY
REVISIONS




                                                                                                                                                                                                                                                                                           Traffic Management Design
                                                                                                                                                                                                                                                                                                Certification # 259
             02                                                 SCALE / PRINT SIZE: NOT TO SCALE      PRINT TO A3                        CONTROL METHOD:          SHOULDER CLOSURE
             03                                                 SITE CONTACT:       TBA                                                  TERM OF WORKS:           LONG TERM
             04                                                 TRAFFIC CONTROL Co. TBA                                                  ORIGINAL POSTED SPEED:   30 Km/h
             05                                                 NTO CONTACT:        TBA                                                  WORKSITE SPEED LIMIT:    30 Km/h                                                                                           MINIMUM LANE WIDTH:    3.0m
            PROJECT                                             PROJECT DURATION: TBA                                                    ROAD TYPE:               TWO WAY ­ DIVIDED                                                                                 VALUE OF D:            TABLE 4.2 (MUTCD)
            MANAGER       TBA
                                                                                                                                         POSTED SPEED OF 30Km/H D = 5 ­ 10m                                                                                         TAPER LENGTH:          TABLE 4.6 (MUTCD)
Log in to download the original file

1856-CMP-01 [Prelim] August 2020.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.