Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

1856-CMP-01 [Prelim] August 2020

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

3.0     KEY PERSONNEL

3.1    Principal Details

Developer:      Stockwell Development Group Pty Ltd
                Joel Douglass & Harrison Hurst
                399 Montague Road
                West End QLD 4101

                Ph:     0439 202 990
                E:      [email protected]

                Ph:     0478 792 447
                E:      [email protected]


3.2    Consulting Engineer Details

Civil Works: Barlow Shelley Consulting Engineers (Aust) Pty Ltd
             PO Box 899
             Maroochydore Qld 4558

                Ph:     (07) 5443 8285
                E:      [email protected]


3.3    Contractor Details

Contractor:     TBC




3.4    Administering Authority Details

The project is located within the Noosa Shire Council. The nominated site representative
from Council shall be contacted prior to any Council identified hold point inspection for
works, especially those to be classed as “On Maintenance”. Alternatively, the nominated
site    representative       from      Unitywater   shall   be     contacted   for    all
“On Maintenance” inspections for water and sewer infrastructure.




Preliminary Construction Management Plan                                             7
August 2020
Log in to download the original file

1856-CMP-01 [Prelim] August 2020.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.