Original source · versioned page text
1856-CMP-01 [Prelim] August 2020
3.0 KEY PERSONNEL
3.1 Principal Details
Developer: Stockwell Development Group Pty Ltd
Joel Douglass & Harrison Hurst
399 Montague Road
West End QLD 4101
Ph: 0439 202 990
E: [email protected]
Ph: 0478 792 447
E: [email protected]
3.2 Consulting Engineer Details
Civil Works: Barlow Shelley Consulting Engineers (Aust) Pty Ltd
PO Box 899
Maroochydore Qld 4558
Ph: (07) 5443 8285
E: [email protected]
3.3 Contractor Details
Contractor: TBC
3.4 Administering Authority Details
The project is located within the Noosa Shire Council. The nominated site representative
from Council shall be contacted prior to any Council identified hold point inspection for
works, especially those to be classed as “On Maintenance”. Alternatively, the nominated
site representative from Unitywater shall be contacted for all
“On Maintenance” inspections for water and sewer infrastructure.
Preliminary Construction Management Plan 7
August 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.