Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

20220198-CV-Set

of 9

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                       SEDIMENT RELEASE GUIDELINES                                                                  ENVIRONMENTAL OUTCOME BY PROVIDING STORAGE              2.       SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE                     SILT CONTROL APPLICATIONS.
                                                                                                                                                                                                                                    FOR THE CAPTURE AND TREATMENT OF RUN-OFF                         MINIMUM REQUIREMENTS. IT IS THE CONTRACTORS                  6.    THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT
                         SEDIMENT AND EROSION CONTROL:                                                                                                                                                                              FROM THE IMMINENT RAINFALL AND RUN-OFF.                          RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL                       PLAN SHALL BE READ IN CONJUNCTION WITH THE
                         CONTRACTOR TO ALLOW FOR PROVISION OF ALL                                                                      1.   ALL RELEASES OF STORMWATER CAPTURED ONSITE,
                                                                                                                                            UNLESS OTHERWISE NOTED IN THIS STANDARD, MUST NOT                                2.3.    ALL REASONABLE AND PRACTICABLE STEPS HAVE                       MEASURES AS DEEMED NECESSARY THROUGHOUT                            APPROVED DRAWINGS.
                         REQUIRED SEDIMENT AND EROSION CONTROL
                                                                                                                                            EXCEED THE FOLLOWING LIMITS:                                                            BEEN TAKEN TO TREAT THE WATER WITHIN                             CONSTRUCTION.                                                7.    PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL
                         DEVICES IN ACCORDANCE WITH IECA AND COUNCIL
                                                                                                                                         1.1.   50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A                                         BEST-PRACTICE TIME FRAMES;                              3.       THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL                      IS TO BE OBTAINED FROM THE SUPERINTENDENT FOR THE
                         POLICIES AND GUIDELINES
                                                                                                                                                MAXIMUM CONCENTRATION;                                                       2.4.   FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND                    SEDIMENT CONTROL DEVICES IN A FUNCTIONAL ORDER                     LOCATION OF THE SITE ACCESS POINT AND WASH DOWN
                                                                                                                                         1.2.    TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE                                           THE CONCENTRATION OF TSS IN THE CAPTURED                        AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS                        AREA WHICH ARE TO BE MAINTAINED THROUGHOUT THE
                         LEGEND                                                                                                                 BACKGROUND;                                                                          WATER HAS ALREADY SIGNIFICANTLY DECREASED.                      REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF                       CONSTRUCTION PERIOD.
                                                                                                                                         1.3.   pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT                            3. FOR ALL OTHER STORMWATER RELEASES, FLOWS AND                           WORKS.                                                       8.    IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN
                                                  TURF STRIP                                                                                                                                                                    DISCHARGES FROM THE SITE, THE RELEASE LIMIT                 4.       CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES                    FOUND TO BE DIFFERENT OR FAILED IN SERVICE,
                                                                                                                                                 WHERE, AND TO THE EXTENT THAT, THE NATURAL
                                                  SEDIMENT FENCE                                                                                RECEIVING WATERS LIE OUTSIDE THIS RANGE.                                        PRESCRIBED IN (1a) ABOVE MUST NOT BE EXCEEDED                        TO THE SATISFACTION OF THE SUPERINTENDENT. SHALL BE                CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY



                                   W
                                                                                                                                       2. THE CONCENTRATION OF TSS RELEASED BY DEWATERING                                       UNLESS THE DEVELOPMENT IS IN FULL COMPLIANCE WITH                    COMPLETED AND EFFECTIVE PRIOR TO:                                  WHICH MAY INCLUDE AMENDMENTS' ADDITIONS TO THE
                                                KERB INLET FILTER                                                                           MAY ONLY EXCEED 50mg/L WHERE IT CAN BE                                              THIS STANDARD.                                                       a. STRIPPING OF TOPSOIL AND GRASS.                                 ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH
                                                                                                                                            DEMONSTRATED AND SUPPORTED THROUGH                                                                                                                       b. BULK EARTHWORKS TO THE SITE.                                    AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT,
                                    W
                                                                                                                                            DOCUMENTATION THAT:                                                             SEDIMENT CONTROL                                                         c. SERVICES INSTALLATION.                                          IF DEEMED NECESSARY AND RELEVANT.
                                                CONSTRUCTION ENTRY                                                                       2.1.   FURTHER SIGNIFICANT RAINFALL IS FORECAST TO                                                                                                          d. PAVEMENT CONSTRUCTION                                     9.    OVERALL
                                                                                                                                                                                                                           1.    ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN         5.       ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN                  a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE
                                                                                                                                                OCCUR BEFORE THE TSS CONCENTRATION IS LIKELY
                                                                                                                                                                                                                                 ACCORDANCE WITH INTERNATIONAL EROSION CONTROL                       PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING FROM                     DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.
                                                  CATCH DRAIN                                                                                    TO BE REDUCED TO 50mg/L;
                                                                                                                                                                                                                                 ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE                     THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE                    b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO
                                    W




                                                                                                                                         2.2.   RELEASING A HIGHER CONCENTRATION OF TOTAL
                                                                                                                                                                                                                                 SPECIFICATIONS.                                                                                                                             BE INSTALLED AND BE OPERATIONAL BEFORE
                                                                                                                                                SUSPENDED SOLIDS WILL RESULT IN A BETTER
                                                                                                                                                                                                                                                                                                                                                                             COMMENCING UP-SLOPE EARTHWORKS.
                                                                                                                                                                                                                                                                                                                                                                        c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE
                                    W




                                                                                                                                                                                                                                                                                                                                                                             CONTROLLED, EXPOSED SURFACES TO BE EITHER
                                                                                                                                                                                                                                                                                                                                                                             MULCHED, COVERED WITH EROSION CONTROL
                                                                                                                                                                                                                                                                                                                                                                             BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED
                                                                                                                                                                                                                                                                                                                                                                             TO BE DELAYED FOR MORE THAN 14 DAYS.
N




                                    W




                                                                                                                                                                                                                                                                                                                                                                  SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                                                  10. FOR SEDIMENT FENCE STANDARD DETAIL AND
                                                                                                                                                                                                                                                                                                                                                                      SPECIFICATION REFER TO INTERNATIONAL EROSION
                                    W




                                                                                                                                                                                                                                                                                                                                                                      CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
                                                                                                                                                                                                                                                                                                                                                                      PRACTICES STANDARD DRAWINGS SF-01 AND SF-02
                                                                                                                                                                                                                                                                                                                                                                      SEDIMENT FENCE.
                                    W




                                                                                                                                                                                                                                                                                                                                                                  TEMPORARY CONSTRUCTION ENTRY/EXIT
                                                                                                                         PROVIDE FABRIC WRAP INLET                                                                                                                                                                                                                11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND
                                                                                                                         PROTECTION TO PITS DURING                                                                                                                                                                                                                    SPECIFICATION REFER TO INTERNATIONAL EROSION
                                      W




                                                                                                                         CONSTRUCTION WORKS AS                                                                                                                                                                                                                        CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
                                                                                                                         PER NSC STD DWG ESC-02                                                                                                                                                                                                                       PRACTICES STANDARD DRAWINGS EXIT-01 AND EXIT-02
                                                                                                                                                                                                                                                                                                                                                                      CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES
                                                                                                                                                                                                                                                                                                                                                                      ONLY), EXIT-03 - ROCK PADS FOR BUILDING SITES AND
                                       W




                                                                                                                                                                                                                                 PROVIDE SEDIMENT FENCE                                                                                                               EXIT-04 AND EXIT-05 CONSTRUCTION EXIT - VIBRATION GRID.
                               T




                                                                                                                                                                                                                                 TO DOWNSTREAM
                                                                PROVIDE 600MM WIDE GRASS FILTER                                                                                                                                  BOUNDARY AS PER NSC                                                                                                              KERB INLET
                                                                STRIP BEHIND KERB DOWNSTREAM OF                                                                                                                                  STD DWG ESC-04 & ESC-05                                                                                                          12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION
                                        W
                               T




                                                                DISTURBED EARTH IN VERGE                                                                                                                                                                                                                                                                              REFER TO INTERNATIONAL EROSION CONTROL
                                            22 . 00                                          PROVIDE CONSTRUCTION                                                                                                                                                                                                                                                     ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES
     22 . 00                                                                                 SHAKEDOWN ENTRY AS                                                                                                                                                                                                                                                       STANDARD DRAWING ESC-03 KERB INLET SEDIMENT TRAPS
                                        W




                                                                                             PER NSC STD DWG ESC-01                                                                                                                                                   //               //
                                T




                                                                                                                                                                                                                                                                              +22.60                                                                              REVEGETATION
                                                                                                                                                                                                                           //                  //
                                                                                                                                                                                                                                                    +22.60
                                                                                                                                                                      //                          //
                                                                                                                                                                                             +22.60                                                                                                                                                               13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO
                                                                                                                                            //
                                                       +22.30                    //                           //
                                                                                                +22.80                                                                              +22.90                              +22.90                                                                                                                                        INTERNATIONAL EROSION CONTROL ASSOCIATION
                                        W




                                                                                                                   SW            SW               SW                                                                                                                                                                                                                  AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING
                                T




                                                                   SW                 SW         SW
                               SW               SW                                                                                                                                                                                                                                                                                                                    R-01 REVEGETATION GENERAL.
                                                                +22.70




                                                                                                                                                                                                                                                                                                 //
                                                                                                                                                                                                                                                    +23.00
                                                                                                                                                                                                                                                                                                                                                                  FIELD INLET
                                        W




                                                                                                                                 +23.00                                                                                                                                                                                                                           14. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION
                                T




                                                                                                                                                                                                                                                                                            S
                                                                                                                                                                                                                                                                                                                                                                      REFER TO INTERNATIONAL EROSION CONTROL
                                                                                                                                                                                                                                                                                                                                                                      ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES
                                                                                                                                                                                                                                                                                                                                                                      STANDARD DRAWING ESC-02 GRATED STORMWATER (FIELD)
                                        W




                                                                                                                                                                                                                                                                                                                                                                      INLET SEDIMENT TRAP.
                                 T




                                                                                                                                                                                                                                                                                            S
                                                                                                                                                                                                                                                                                                                                                                  OPERATION AND MAINTENANCE




                                                                                                                                                                                                                                                                                                       //
                                                                 +23.26
       23 . 00                                                                                                                                                                                                                                                                                                                                                    15. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC
                                        W




                                                                                                +22.98                                                                                                         +23.00
                                   T




                                                                                                                                                                                                                                                                                                 S
                                                                                                                                                                                                                                                                                                                                                                      MEASURES SHALL BE INSPECTED:




                                                                                                                                                                                                                                                                                                          00
                                                        +23.26                                                               +22.98                                                                                                                                                                    23 .
                                                                                                                                                                                                                                                                                                                                                                      · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE)
                                                                                                                                                        +23.00                                                                                                                                                                                                           OR WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE)
                                                                                                                                                                                                                                                                                                                                                                      · WITHIN 24 HOURS OF EXPECTED RAIN; AND
                                          W




                                                                                                                                                                                                                                                                                                 S
                                    T




                                                          +23.37                            +23.68                                                                         +24.00                                                                                                                                                                                     · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT
                                                                                                                             +23.98                                                                                                                                                                                                                                      OF SUFFICIENT INTENSITY AND DURATION TO MOBILISE
                                                                                                     +23.83
                                                                                                                                                                                                                                                                                                                                                                         SEDIMENT ON SITE).




                                                                                                                                                                                                                                                                                                               //
                                                                                                                                                                                                           +24.00
                                           W




                                                                                                                                                                                                                                                                                                                                                                  17. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE




                                                                                                                                                                                                                                                                                                      S
                                    T




                                                          +23.82
                                                                                                                                                                                                                                                                                                                                                                      OF ESC MEASURES SHALL OCCUR IN ACCORDANCE WITH
                                                                   +23.70                                                                                                                                                                                                                                                                                             THE FOLLOWING TABLE:
                                            W




                                 SW




                                                                                                                                                                                                                                                                                                       S
                                    T




                                                                                                                                                                                                                                                             +24.00
                                                  SW
                                                                                                                                                                                                                                                                                                                                                                                              MAINTENANCE SCHEDULE




                                                                                                                                                                                                                                                                                                                      //
                                                                                                                                                                                                                                                                                                                                                                                                                                TIMEFRAME FOR COMPLETION
                                                                   SW                                                                                                                                                                                                                                                                                                    ESC MEASURES            MAINTENANCE TRIGGER
                                            W




                                                                                                                                                                                                                                                                                                                                                                                                                                     OF MAINTENANCE




                                                                                                                                                                                                                                                                                                          S
                                       T




               24 . 00
                                                                                                                                                                                                                                                                                                                                                                        SEDIMENT BASISIN   WHEN SETTLED SEDIMENT EXCEEDS THE       WITHIN 7 DAYS OF THE
                                                                                                                              +24.00
                                                                                 SW                                                                                                                                                                                                                                                                                                         VOLUME OF THE SEDIMENT STORAGE             INSPECTION
                                                                                                                                                                                                                                                                                                                                                                                           ZONE (SEE COUNCIL'S SEDIMENT BASIN
                                                                                                                                                                                                                                                                                                                                                                                                   DESIGN GUIDELINES
                                                                                              SW                                                                                                                                                                                                                           00
                                                W




                                                                                                                                                                                                                                    +23.90                                                                          24 .                                          REPORTING




                                                                                                                                                                                                                                                                                                               S
                                                                                                                                                                                                                                                                                                                                                                      OTHER ESC MEASURES THE CAPACITY OF ESC MEASURES IS BY THE END OF THE DAY
                                                                                               +23.90
                                        T




                                                                    +24.36                                                                                                                                                                                                                                                                                                                          EXCEEDED
                                                                                                                                       SW              SW
                                                                                                                                                                                                                                                                                                                                                                  18. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF
                                                                                                                        SW
                                                                                                          +23.90                                                                                                                                                                                                                                                      ESC MAINTENANCE AND CONTROL OF ALL STAGES OF
                                                                                                                                                                                                                                                                                                                                                                      WORK FOR APPROVAL BY THE SUPERINTENDENT.
                                                  W




                                                                                                                                                                                                                                                                                                                S
                                            T




                                                                                                                                                                  CLIENT DETAILS:                                                                                                                                                                     PROJECT NAME:
                                                    W




                                                                                                                                                                                                                                             PROJECT ADDRESS:                                                               APPROVED BY:




                                                                                                                                                                                                                                                                                                                     S
                                              T




                                                                                                                                                                                                                                                                                                                                                      3 DELORME STREET, NOOSA HEADS
                                                                                                                                                                                    CAPITAL PRUDENTIAL                                                                                                                                                TITLE:                                                    STATUS:

                                                                                                                                                                                                                                                                                                                                                      EROSION SEDIMENT                                          FOR APPROVAL
                                                      W




                                                                                                                                                                                                                                                                                                                           S
                                                T




                                                                                                                                                                                                                                              3 DELORME STREET, NOOSA HEADS                                                                                                                                     NOT FOR CONSTRUCTION
      © ABN 89 647 469 707                                                                                                                                                                                                                                                                                                           JARO BAULEKA     CONTROL PLAN
       75 NOOSA DRIVE                                                                                                                                                                                                                                                                                                                  RPEQ: 2693
                                                             01      26/08/222        ISSUED FOR APPROVAL                             MVP        JAC        JB    SCALE:
    NOOSA HEADS, QLD 4567                                                                                                                                                                                                                                                                                                                CPEng
                                                        W




                                                                                                                                                                                                                                                                                                                                S



                                                            REV          DATE                  DESCRIPTION                            DWN        CHK        APP
                                                                                                                                                                                                       1:100                                                                                                                                          DRAWING NUMBER:                                           PROJECT NUMBER:                            SHEET REV:
                                                  T




        +61 7 5211 1003
                                                                                                                                                                                                                                                                                                                                     DATE: 26/08/22                                                                                                         SIZE:
    RECORCONSULTING.COM                                                                                 REVISIONS
                                                                                                                                                                                         DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                                                      030                                                       20220198                                   A1 01
                                                          W




                                                                                                                                                                                                                                                                                                                                S
Log in to download the original file

20220198-CV-Set.pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.