Council archive · source document
OPW16/0050 - Delegated Report
DELEGATED ASSESSMENT & DECISION REPORT from: WORKS ASSESSMENT Application No: OPW16/0050 Date: 23 May 2016 Author: Mark Lewis - Project Director: Mark Lewis - Coordinator Engineering SUMMARY Applicant: Connetivity Pty Ltd Consultant (if applicable): No associations of Consultant are linked to this application Proposal: Development Permit for Operational Work Engineering Works - Drainage works, Stormwater, Earthworks, Landscaping Assessment Type: Code Property Address: 31 Corsair Cres SUNRISE BEACH QLD 4567 Property Number: 144653 RP Description: Lot 219 RP 135364 Land Area: 607.0000 Square Metres Planning Scheme: The Noosa Plan (16 September 2013) ASSESSMENT Higher Order Approval and Compliance with Conditions The works are required to address the conditions of the higher order MCU approval 132007.2062.02 and the associated GIA 132007.2062.03. State higher order approval No. and what it approved (ie 1 into 32 lots) Applicable Codes The following Codes are applicable to this Application: Engineering Works Codes Landscaping Code The application has been assessed against each of the above applicable codes and found to be compliant with, or can be conditioned to comply with, each. OR – delete whichever is not applicable Planning Scheme Policies Not applicable Identify applicable planning Scheme Policies and include total contribution for each and reasoning behind calculation if needed CONSULTATION Internal Referrals The application was forwarded to the following Internal Council Specialists; Infrastructure Environment Their assessment forms part of this report. Referral Agencies Not Applicable RECOMMENDATION APPROVE WITH CONDITIONS Note: or APPROVE IN PART WITH CONDITIONS Application No. OPW16/0050 for a Development Permit for Operational Work Engineering Works - Drainage works, Stormwater, Earthworks, Landscaping, as identified in the attached details recommended for the Decision Notice. DELEGATED AUTHORITY FOR APPLICATION NO. OPW16/0050 PROJECT MANAGER Signature: Date: 23/5/2016 Mark Lewis PROJECT DIRECTOR (if applicable) Signature: Date: Mark Lewis Coordinator Engineering [word/footer1.xml] FM8401S/0-26/03/2012 Page 2 of 2 [word/footer2.xml] FM8401S/1-04/09/2013 Page 1 of 2 [word/header1.xml] DELEGATED AUTHORITY REPORT [Attachment: image1.jpeg (image text)] am ee} NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0050 - Delegated ReportRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
- DOCX
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.