Council archive · source document
Item 6 Planning Report-1.2 · MCU22/0094
space for the unloading of goods associated with the development. Please refer 3.3.7. STORMWATER MANAGEMENT
to the enclosed. Traffic Assessment Report prepared by SLR Consulting – Stormwater treatment will occur in a bioretention basin located at the front of
Appendix F the property, proximate to the established stormwater connection in Hoffman
3.3.3. BUILDING HEIGHT Drive, and in the lowest part of the property. This is a logical location that is
The proposed Childcare Centre will be a single storey with an overall height of also accessible by larger vehicles in the event of maintenance being required,
5m and a roof pitch of 7.5 degrees. whilst also contributing to the landscaping through the specification of plants
within the basin which can grow to a height that will screen the underlying
3.3.4. SETBACKS
function of the system.
The proposed Childcare Centre provides a road and rear boundary clearance
of 4m, a side boundary clearance of 4m minimum along the eastern side
3.3.8. BUSHFIRE RISK & MANAGEMENT
boundary and a minimum of 19m western side boundary clearance.
A Bushfire Hazard Assessment has been prepared to demonstrate compliance
3.3.5. LANDSCAPING & DEEP PLANTING
with the bushfire provisions within the Noosa Plan. Please refer to the enclosed
As identified within the Major Centre Zone code, a minimum of 15% of the site
Bushfire Hazard Assessment by Queensland Bushfire Planning – Appendix G.
is required to provide landscaping. As depicted within the architectural plan,
the proposed development provides a total of 15.1% (374.3²) of landscaping.
Please refer to the enclosed Architectural Plan – Appendix A.
3.3.6. REFUSE STORAGE & COLLECTION
Refuse will be collected from the bins internal to the building and deposited
into collection bins in a dedicated and fully enclosed bin store located toward
the front of the site. Refuse collection will be undertaken by Council
contractors to minimise conflicts with the drop-off/pick-up times of the
children. Please refer to the enclosed Traffic Assessment Report prepared by
SLR Consulting – Appendix F for further details.
Planning Report Page | 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Item 6 Planning Report-1.2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.