Item 6 Planning Report-1.2 · MCU22/0094
2. SITE ANALYSIS Table B: Site characteristics
The following easements are not proposed within this
2.1. SITE LOCATION & CHARACTERISTICS application. However they will exist over the subject site
as part of OPW that is currently underway for a ROL
Easements application that was approved over the site.
The site is located at 28 Eenie Creek Road, Noosaville (formally described as Lot
§ EMT AO: Pedestrian Access
3 on SP246584). Currently, there is an on-going operational works over Lot 3 § EMT CC: Services/Utilities
§ EMT CD: Services/Utilities
which is subsequent to a subdivision approval that was approved by the P&E
The Noosa Shire Council contour mapping identifies the
Court in 2020 (Council ref: RAL18/0023). As such, the proposed development will subject site to be generally flat. Being approximately 8m
be sited on future lot 4 upon the completion of plan sealing.
Topography RL in the north-east corner and approximately 5m RL in
the south-west corner, there is a gentle slope towards
Hofmann Drive.
Upon completion of the operational works, the site will front Hofmann Drive to Vegetation The site is clear of any vegetation.
the south which will provide safe and legible road and pedestrian access to this Waterways / waterbodies No waterways or waterbodies are located on site.
use. This road frontage is the single, clearly visible aspect of the property which Contaminated land The site is not identified as contaminated land.
will need to remain free from obstructions other than formal landscaping. This
will ensure that both the premises and pedestrian pathway are legible and safe Table C: Site services
from a CEPTED perspective from Hoffman Drive. The development will achieve applicable water
Water Supply connections. Please see the attached Appendix E – Civil
Engineering Report.
Table B below further characterises the physical features of the site. Table C
The development will achieve applicable sewer
provides an overview of infrastructure servicing the site. Sewerage connections. Please see the attached Appendix E – Civil
Engineering Report.
The development will achieve lawful point of discharge.
Stormwater Please see the attached Appendix E – Civil Engineering
Report.
The site will establish service connections for electricity,
Electricity, Gas &
gas and telecommunications. Please refer to Appendix E –
Telecommunications Civil Engineering Report.
Planning Report Page | 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Item 6 Planning Report-1.2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.