                                                                                 Opw a /013 I
TGM Group Pty Ltd          Ballarat I Melbourne I Geelong I Ballina
1315 Sturt Street
Ballarat Vic 3350
PO Box 563W
                                                                      tlYrn'lr^p^^l^l h;^'^
Ballarat West Vic 3350
T 03 5330 8888
F 03 5333 3815
                                                                                                 TGM
ABN 11 125 568 461

    Our Reference: 4400-02

    Development Application No. OPW11/0131


    29th July 2011

   Attention: Mr. Mark Lewis
   Senior Engineering Officer
   Sunshine Coast Regional Council
   Locked Bag 72,
   Sunshine Coast Mail Centre 4560


    RE:       Proposed Bunnings Warehouse - External Works
              - Development Permit for Electrical, Roadwork's & Landscaping
              -_178 Eumundi Road, Noosaville Queensland 4566

    Dear Mark

   Further to the draft conditions of the Development Approval for the external works;
   OPW11/0131 we are pleased to provide four (4) copies of the amended final design
   drawings and additional information for your approval.

   We consider that these final documents indicate the specified amendments as listed and
   therefore request that the relevant approvals be provided to enable a pre-start meeting
   for the external works to be arranged.

    Four (4) copies of the following updated detailed engineering design documentation
    have been provided:
           4400-02 Sheet EC 1 of 9 Rev 02 General Notes & Drawing Index
           4400-02 Sheet EC 2 of 9 Rev 05 Proposed Roundabout Pavement Layout Plan
           4400-02 Sheet EC 3 of 9 Rev 03 Gateway Drive Cross Sections
           4400-02 Sheet EC 4 of 9 Rev 03 Eumundi East Cross Sections
           4400-02 Sheet EC 5 of 9 Rev 03 Eumundi West Cross Sections
           4400-02 Sheet EC 6 of 9 Rev 03 Kerb Set-out Co-Ordinates
           4400-02 Sheet EC 7 of 9 Rev 01 Gateway Drive Longitudinal Section
           4400-02 Sheet EC 8 of 9 Rev 01 Drainage Longitudinal Sections
           4400-02 Sheet EC 9 of 9 Rev 02 Linemarking Plan

    In accordance with the individual requirements of the Development Approval we advise
    in detail as follows:

    Prior to Commencement of Construction
    1.         Acknowledged
    2.         Will be provided as part of pre-start meeting
    3.         Drawings amended to include requested details. Barriers are not required as
               the retaining wall is located outside of the minimum required `clear zone' in
               accordance with Section 7.6 of the Road Planning Design Manual.


                                            LS             iiOa
                               IBox. c^,sa^ ^  l            t0 ^(..                           www.tgmgroup.com
Full text of the other 44 pages

Page 2

  4. a) & b) Drawings amended to include revised details as discussed and agreed on
             site on the 28/7/2011
  5.         Drawings amended to include requested details
  6. a) - e) Drawings amended to include requested details. We note that the kerb
             channel forms part of the 1.50m bike lane width
  7.         To be provided within (ten) 10 working days after pre-start meeting as
             agreed on the 28/7/2011
  8. a) - d) Drawings amended to include requested details
  9. a) - k) To be provided within (ten) 10 working days after pre-start meeting as
             agreed on the 28/7/2011

  Conduct a Combined Engineering & Landscaping/Revegetation Prestart
  meeting
  10.           Will be provided as part of pre-start meeting
  11.           Acknowledged
  12.           The Principal Contractor is H. Troon Pty Ltd.
                The Sub-Contractor for the external works will be Blacklaw Civil Contractors
                The anticipated construction commencement date is the 8th August 2011
  13.           Noted
  14. a) - f)   A copy Blacklaw Civil Contractors CMP and EMP is attached
  15.           Acknowledged
  16.           Noted. All amended drawings are submitted (attached) for approval

  Water & Sewerage
  17.      Acknowledged
  18.       Noted. The submitted (attached) drawings indicate the specified replacement
           works
  19.       Noted and an annotation has been added to the amended drawings
            submitted (attached) for approval
  20.       Noted, to be provided by Blacklaw Civil Contractors directly to Unitywater
  21.      Acknowledged

  Other
  24.           Signage added to amended plans
  31.           Note added to amended drawings


  If you have any queries or wish to further discuss the proposal please don't hesitate to
  contact me on (03) 5330 8888.

  Yours faithfully
  TGM GROUP PTY LTD
  Ballarat Office
  Per:




   DARREN J"TRIGG
   Director
-B^ Civil, MIE Aust., CP Eng,

Page 3

    BLACKLAW
    CIVIL CONTRACTORS




 Environmental
Management Plan
     (EMP)


Noosa Bunnings


[OCR of page images]
@ BLACKLAW

~~ CIVIL CONTRACTORS

Environmental

Management Plan
(EMP)

Noosa Bunnings

 

 

Page 4

                                                                                                                  BLACKLAW
                                                                                                                   CIVIL CONTRACTORS
            ENVIRONMENTAL MANAGEMENT PLAN (EMP)
            Noosa Bunnings


                                                             Table of Contents
            1.0       INTRODUCTION ..........................................................................................................2
               1.1    PROJECT DESCRIPTION ...........................................................................................2
               1.2    OBJECTIVES OF THE EMP ........................................................................................2
            2.0       PLANNING ..................................................................................................................3
              2.1     ENVIRONMENTAL RESPONSIBILITIES AND CONTACT NUMBERS ......................3
              2.2     LEGISLATIVE REQUIREMENTS ................................................................................3
              2.3 APPROVALS, LICENSES AND PERMITS ..................................................................3
            3.0       IMPLEMENTATION .....................................................................................................4
              3.1     ENVIRONMENTAL PROTECTION REQUIREMENTS ................................................4
              3.2     WORKING HOURS ......................................................................................................4
              3.3     NON-CONFORMANCE CONTROL .............................................................................4
              3.4     COMMUNICATION AND COMPLAINTS PROCEDURE .............................................5
              3.4.1              COMMUNICATION ..........................................................................................5
              3.4.2              COMPLAINTS MANAGEMENT .......................................................................5
              3.5     EMERGENCY RESPONSE PROCEDURES ...............................................................5
              3.6     ENVIRONMENTAL TRAINING ....................................................................................7
              3.7     ENVIRONMENTAL PERFORMANCE MONITORING .................................................7
           4.0        APPENDIX A: PROJECT & EMERGENCY CONTACT NUMBERS ...........................8
           5.0        APPENDIX B: ENVIRONMENTAL PROTECTION MEASURES ................................9
              5.1     ACCESS & TRAFFIC MANAGEMENT ........................................................................9
              5.2     ACCIDENTAL SPILLS MANAGEMENT ....................................................................10
              5.2     AIR QUALITY .............................................................................................................11
              5.2     FIRE CONTROL ........................................................................................................12
              5.2     FUELS & CHEMICALS ..............................................................................................13
              5.2     NOISE & VIBRATION ................................................................................................14
              5.2     PLANT & EQUIPMENT ..............................................................................................15
              5.2     WASTE MANAGEMENT ............................................................................................16
              5.2     SITE WORKING AREA ..............................................................................................17
              3.2     STOCKPILE SITES ....................................................................................................18
              3.2     WATER QUALITY ......................................................................................................19




Document No )MS-EMP-u'         Authorised by                     Blacklaw Civil Contractors        Head Office                 Telephone          :- a o
Date     ar,                                      Raun)          ABN 77 106 750 724                100 Sandalwood Lare         Facsimile             ". 9
Version                        Author                                                              Forest Glen OLD 4556        office@blacklawcsvil com au
Next Review _a, arv 20'
                                                                                                                                               Page 1 of 20

Page 5

                                                                                                 BLACKLAW
                                                                                                  CIVIL CONTRACTORS
            ENVIRONMENTAL MANAGEMENT PLAN (EMP)
            Noosa Bunnings


            1.0       INTRODUCTION

            This Environmental Management Plan (EMP) has been prepared for the Noosa Bunnings.

            The EMP is the essential link between environmental impacts assessment and project
            activities. It is to ensure that environmental impacts identified during the assessment stage
            are properly managed on site and control measures are implemented.

            1.1       PROJECT DESCRIPTION

            The works are located on Gateway Dr and Eumundi-Noosa Rd, Noosaville in the local
            government area of the Sunshine Coast Regional Council.

            The works comprises the building of the Noosa Bunnings store, as well as reconfiguration of
            the Rene St round-a-bout and Gateway Drive entrance. The works are shown and described
            in the Drawings (attached in the appendices), and will be constructed in accordance with the
            requirements set out in the Drawings and specifications provided with the design
            documentation.

            The main activities to be carried out during the project are:

                  •   Bulk Earthworks
                  •   Round-a-bout Roadworks

            1.2       OBJECTIVES OF THE ENVIRONMENTAL MANAGEMENT PLAN

            The EMP outlines the environmental controls applying to the pre-works, during works and
            post works activities associated with the Project. It has been developed based on
            information for hte site provided by the client and general environmental requirements which
            apply to most construction projects and also incorporates project specific environmental
            sensitive work practices.

            The general objectives of this EMP include to:

                  •   Reduce or eliminate the release of pollutants to the environment;
                  •   Reduce waste and resource depletion by utilising recycling principles where practical;
                  •   Document all environmental management activities, including verification and
                      corrective actions;
                  •   Implement and effective program for monitoring of environmental issues relating to
                      the Contractor's role in the project;
                  •   Promote environmental awareness among employees;
                  •   Support ecologically sustainable development;
                  •   Protect and enhance the aesthetic environment;
                  •   Minimise impacts on the local community during works;

            The EMP is a working document to be updated as necessary.




Document No: OMS-EMP-C •     Authonsed by               Blacklaw Cwd Contractors   Head Office             Telephone         2 '300
Date _z a^ 20'1                  aqe 'eat "I" Raun)     ABN 77 106 50 724          100 Sandalwood Lane     Facsimile       -
Vernon:                      Author                                                Forest Glen OLD 4556    office@blacklawcaalcomau
Next Review.:. a' 20' _               ' a <: ,`arrant
                                                                                                                         Page 2 of 20

Page 6

                                                                                                 BLACKLAW
                                                                                         1411( CIVIL CONTRACTORS
           ENVIRONMENTAL MANAGEMENT PLAN (EMP)
           Noosa Bunnings


           2.0       PLANNING

           2.1       ENVIRONMENTAL RESPONSIBILITIES AND CONTACT NUMBERS

           The person with primary responsibility for implementing the EMP, monitoring its
           effectiveness and rectifying any deficiencies is the Contractor. He/she can delegate some
           responsibilities to other members of the team.

           The Project delivery team contact numbers and emergency contact numbers are detail in
           Appendix A.

           2.2       LEGISLATIVE REQUIREMENTS

           All activities carried out on the site and in relation to the Project shall comply with the
           relevant provisions of all legislation (including Regulations) relating to the construction and
           operation of the Project.

           2.3       APPROVALS, LICENSES AND PERMITS

           The Contractor will ensure that any approvals, licenses or permits as required are obtained
           before works commence.




Document No: OMS-EMP-Ot     Authorised by              Blacklaw CNii Contractors   Head Office            Telephone      54•t2 3300
Date: -ar,ar; 2011          va•c qP °e^t pans Raun.;   ABN 77 106 750 724          100 Sandalwood Lane    Facsimile      44 ' s9g
Version '                   Author                                                 Forest Glen OLD 4555   [email protected]
Next Review                          ','&a 7ba•'en1
                                                                                                                          Page 3 of 20

Page 7

                                                                                                   BLA CKLA W
                                                                                                    CIVIL CONTRACTORS
           ENVIRONMENTAL MANAGEMENT PLAN (EMP)
           Noosa Bunnings


           3.0       IMPLEMENTATION

           3.1       ENVIRONMENTAL PROTECTION REQUIREMENTS

           In general, all activities carried out on the site will comply with the relevant provisions of all
           legislation for the construction of this Project.

           The environmental issues identified as requiring planning and control measures during the
           delivery of the project construction are detailed in Appendix B. They cover three distinct
           phases of activity in accordance with the sequence of operations. These are requirements;

                 •   Prior to construction;
                 •   During construction and
                 •   Post construction (but not including operation).

           3.2       WORKING HOURS

           Working hours shall be lam to 6pm Monday to Friday and lam to 5pm on Saturdays.

           Works outside these hours will require written approval from the Client and nearby residents
           and businesses will be advised of changed hours.

           3.3       NON-CONFORMANCE CONTROL, CORRECTIVE AND PREVENTIVE ACTION

           A non-conformance occurs when a procedure or environmental safeguard is not followed, or
           does not perform as required by this EMP. The Superintendent will monitor non-
           conformances to the EMP and initiate a corrective and preventative action where required.
           Non-conformance is reported in the relevant form.




Document No. QMS-EMP-J'     Authonsed by                B!acklaw Civil Contractors   Head Office             Telephone :     5447 33 CC
Date a .,aw 20t t                          a-s :?",I,   ^.FN '7 ?05' 5C -24          100 Sandalwood lane     Facsimile 5     ^443 3397
Version                     Author '                                                 Forest Glen OLD 4556    office@blacklawci%nl.com.au
NextRevew _ar„ary20'.
                                                                                                                             Page 4 of 20

Page 8

                                                                                                    BLACKLAW
                                                                                                     CIVIL CONTRACTORS
            ENVIRONMENTAL MANAGEMENT PLAN (EMP)
            Noosa Bunnings
                                                                                           141t
            3.4       COMMUNICATION AND COMPLAINTS PROCEDURE

                      3.4.1    COMMUNICATION

            The works Supervisor is the contact point to deal with all environmental issues and
            emergencies. He or she is responsible for ensureing all such issues are resolved. Work
            team members must notify the Work Supervisor of any environmental issues on site.

            The Works Supervisor has been nominated to be available to relevant external authorities on
            a 24-hour basis. He/she has the authority to take any action on site as directed by an
            authorised officer of any relevant external authority. (See Appendix A for the 24-hour contact
            numbers).

            All relevant authorities, affected property owners and others in the vicinity or affected by
            specific works will be informed of the project, activity and timeframes.

            Emerging environmental issues on site are discussed and consulted through regular Toolbox
            meetings. A suitable form for recording toolbox-meeting outcomes is provided in the
            appendices of this document. These records are retained as project records.

            Inquiries about the works from external parties will be recorded on the Communication
            Register.

                      3.4.2    COMPLAINTS MANAGEMENT

            Any complaints which concern any aspect of the project are recorded and investigated (form
            QMS-POL-10). A Complaints Report will be maintained. The Complaints Report shows the
            details and nature of the complaint, the complainant, the date and actions taken as a result
            of the investigation.

            If an environmental complaint (such as a complaint regarding noise or pollution) is received,
            a written report will be prepared and given to the clients' representative within one working
            day. This report includes details of the complaint, action taken to correct the problem and
            proposed measures to prevent the occurrence of a similar incident.

            3.5        EMERGENCY RESPONSE PROCEDURES

            All environmental incidents are dealt with promptly to minimise any potential impacts.
            Unexpected or accidental environmental incidents will be managed in accordance with the
            sites' incident response and reporting procedures. All environmental incidents are reported
            using the relevant form.

            Likely emergencies and incidents may involve;

                  •    Fuel or chemical spills;
                  •    Unlicensed discharge of pollutants to environment (air, water, noise, soil);
                  •    Dumping of waste to an unauthorised site.

            The Works Supervisor on site is responsible for undertaking the incident response according
            to the procedure.
Document No: OMS-EMP 0'       Authorised by              Blacklaw Civil Contractors   Head Office             Telephone      5 =3   ; :;r
Date ^a ..a^                   1arager ?n    are Raun)   ABN 77 106 750 724           100 Sandalwood Lane     Facsimile
Version:                      Author:                                                 Forest Glen OLD 4555    [email protected] au
Next Review ...':ar1 2012              Cray, r\er'ent
                                                                                                                              Page 5 of 20

Page 9

                                                                                                      BLACKLAW
                                                                                                      CIVIL CONTRACTORS
             ENVIRONMENTAL MANAGEMENT PLAN (EMP)
            Noosa Bunnings                                                                   14 ike
            Any incidents on site, which are likely to cause material harm to the environment, will be
            immediately reported to the Client's Representative.

            The DERM (Department of Environment and Resource Management) will be notified of
            pollution incidents on or around the site which have occurred in the course of the works, in
            the following instances;

                  •    The actual or potential harm to the health or safety of human beings or ecosystem is
                       not trivial;
                 •    The actual or potential loss or property damage (including clean up costs) associated
                      with a pollution incident exceeds $10,000.

            Emergency contact numbers (refer to Appendix A) will be displayed at the work sites.

            Procedure in case of any incident

                 •    First check that you are not in danger yourself.
                 •    Notify your works Supervisor or most senior management person on site immediately
                 •    The works Supervisor or most senior management person handles the emergency
                      according to company procedures

            Procedure in case of fire

                 •    Warn & rescue any person in immediate danger - only if safe to do so!
                 •    Call the Fire Brigade on 000
                 •    Extinguish the fire using the right fire extinguisher if safe to do so
                 •    Evacuate to the emergency assembly area if directed or in danger
                 •    Remain at assembly area and ensure everybody is accounted for

            Procedure in case of chemical spill

            Spill on the worksite are most likely to be hydraulic oil or engine oil spilled from plant items. If
            a spillage occurs the following procedure is to be followed:

                 •    Immediately identify the spilled material and notify the works supervisor.
                      Subcontractors are to notify the Principal Contractors site representative.
                 •    Contain the spill as soon as possible so it doesn't spread. Refer to MSDS for
                      personal protective clothing needed.
                 •    If containment is required, contain using earth mound and/or absorbent socks/spill
                      kit. If you can't do this let your supervisor know.
                 •    Use the relevant clean up procedure as instructed by the MSDS.
                 •    Once the spill has been contained, your supervisor will arrange removal and disposal
                      as soon as possible. Dispose of material using a licensed contractor and keep
                      records of disposal on site.
                 •    Complete and Incident Report Form and forward it to the Project Manager.




Document No: QMS-EMP !;'     Authorised by:               Biacklaw Civil Contractors   Head Office             Telephone      ;av
Date ,:a r.,ary 2011          a   ;,,1-•e1i (Hans Raun)   ABN 77 106 750 724           100 Sandalwood Lare     Facsimile       a
Version                      Author                                                    Forest Glen QLD 4556    office@blacklawcivil com au
Next Review:laci.rarv 201              1 --a n'Narrenl
                                                                                                                               Page 6 of 20

Page 10

                                                                                                        BLACKLAW
                                                                                                         CIVIL CONTRACTORS
              ENVIRONMENTAL MANAGEMENT PLAN (EMP)
              Noosa Bunnings


              3.6           ENVIRONMENTAL TRAINING

              All project personnel (including subcontractors) receive site induction training which covers;

                    •       Emergency and response procedures on site;
                    •       Environmental Awareness of their environmental protection responsibilities and
                            measures to minimise environmental impacts;
                    •       Environmental protection requirements of the site as set out in this EMP.

             Informal training through toolbox meetings is also delivered when required in topic such as
             erosion and sedimentation control, protection of heritage items, protection of native
             vegetation and other environment issues relevant to the site.

              3.7           ENVIRONMENTAL PERFORMANCE MONITORING

             To demonstrate compliance with the EMP, the Works Supervisor conducts weekly and after
             rain environmental controls implemented on site. Any actions resulting from the inspections
             are promptly resolved.

             The Project Manager ensures that environmental performance is evaluated on a regular
             basis and includes a review of inspections records, complaints/enquires received, waste
             generated/disposed, incidents and other environmental issues.




Document No: OMS-EMP-             Authorised by              Blacklaw Civil Contractors   Head Office             Telephone      5-1, 33^0
Date .ar.,arv 2011                    a,e e t -a •s Raun.)   ABN 77 106 750 724           100 Sandalwood Lane     Facsimile            33"+9
Version '                         Author                                                  Forest Gien OLD 4556    office@blacklawcnnl com au
Next Review       arv 20'              .=     a `Aa-renl
                                                                                                                                 Page 7 of 20

Page 11

                                                                                                      BLACKLAW
                                                                                                       CIVIL CONTRACTORS
           ENVIRONMENTAL MANAGEMENT PLAN (EMP)                                               144
           Noosa Bunnings


           APPENDIX A: PROJECT AND EMERGENCY CONTACT NUMBERS




                                                          NOOSA BUNNINGS
                                               CONTACT TELEPHONE NUMBERS.


                                                                Supervisors

                            Hans Raun
                                                                                           0400 663 550
                            Construction Manager


                            Ray Campbell
                                                                                           0438 744 596
                            Site Foreman/first aid



                                                         WHSO (Health & Safety)

                            Craig Warren                                                   0400 600 915


                                                         Closest Medical Centre

                            Stobbs Peter Dr                                                5449 7600

                            102/90 Goodchap St, Noosaville Q 4566                          7AM - 5PM


                                                          Emergency Services

                            Ambulance                                                      000

                            Fire Brigade                                                   000

                            Police                                                         000

                            Mobile Phone (All emergencies; if locked)                      112

                            Poisons Information Centre                                     13 1126

                            Energex - Loss of Power / Accidents                            13 6262

                            Dial Before You Dig                                            1100

                            Workplace Health and Safety Nambour                            5470 8855




Document No: OMS•EMP-o,     Authorised by                  Blacelaw Civil Contractors   Head Office             Telephone     i 5442 3300
Date . a, . any 201'        np, ,,^„ , •ent Hans Raun)     ABN 77 106 750 724           100 Sandalwood Lane     Facsimile       5442 3399
Version '                   Author                                                      Forest Glen OLD 4555    office®blacklawcivil.comau
Next Review `rr:arv 20'                  a;n Narrenl
                                                                                                                               Page 8 of 20

Page 12

                                                                                                  BLACKLAW
                                                                                                    CIVIL CONTRACTORS
            ENVIRONMENTAL MANAGEMENT PLAN (EMP)                                           141
            Noosa Bunnings


            APPENDIX B: ENVIRONMENTAL PROTECTION MEASURES




            Note: 'Evidence of action' means records of the implementation of safeguards: where
            appropriate refer to other checklists or documents. For simple, once-only actions, the
            Evidence column may be initialled and dated




                            sar^r-PSC am                                 anagement
            Pre-works phase
            The directly affected residents will be informed of temporary vehicle access
            arrangements, at least five (5) days in advance where practical to do so.


            Temporary advisory signs will be erected to inform gym & industrial access
            users of changed conditions.


            Works phase
            Alternative access will be maintained at all times to existing beach users and
            any affected businesses.


            Post-works phase
            All temporary traffic signs will be removes and, where appropriate, new
            permanent signs erected.




Document No: OMS-EMP-:;'     Authorised by              Blackiaw Civil Contractors   Head Office             Telephone : ' i 5442 3300
Date . i .,ar; 201,           a .:;e ^.r l ^a•s Raun)   ABN 77 106 750 724           100 Sandalwood Lane     Facsimile       5442 3399
Version '                    Author                                                  Forest Glen OLD 4556    [email protected]
Next Review: 1ar.:ary 201             C a q'tia,ren)
                                                                                                                            Page 9o120

Page 13

                                                                                                  BLACKLAW
                                                                                          1411( CIVIL CONTRACTORS
             ENVIRONMENTAL MANAGEMENT PLAN (EMP)
            Noosa Bunnings




            Pre-works phase
            Ensure that on-site spill containment equipment/kits are available at
            construction work sites where materials such as fuels, chemicals, paints or any
            other liquids are used.

            Ensure relevant Material Safety Data Sheets (MSDS) are available on-site for
            all chemicals used or stored on site.


            Works phase
            In the event of spillage of hydrocarbon products such as fuels and/or
            chemicals, on-site spill containment equipment/kits should be used to contain
            spills and cleaned in accordance with the MSDS requirements.

             All nearby drainage channels will be protected with sandbags



             All incidents will be immediately notified to the client's Project Manager and
             Environmental Manager.


             Post-works phase
             Nil




Document No: OMS-EMP.:       Authorised by              Blackiaw C:v,l Contractors   Head Office            Telephone      544_ 32Cc
Date     ary 2011                 ge-^ rr Fans Par,ri   AEN 77 106 750 724           100 Sandalwood Lane    Facsimile
Version                      Author                                                  Forest Glen QLD 4556   office®blacklawcrvil.com.au
Next Review ; v, ,.vy 20'                a;q Ne•2a1
                                                                                                                          Page 10 of 20

Page 14

                                                                                                         BLACKLAW
                                                                                                          CIVIL CONTRACTORS
              ENVIRONMENTAL MANAGEMENT PLAN (EMP)
              Noosa Bunnings
                                                                                                 144




              Works phase
              Materials transported in open trucks will be covered to prevent generation of
              dust.



              The tailgates of all vehicles transporting material from the site will be securely
              fixed prior to loading and immediately after unloading.



              Exhaust systems and engines for plant/equipment will be maintained
              according to the manufacturers' specifications and regularly monitored to
              ensure that exhaust emission are satisfactory (smoke for no longer than 10
              seconds). Periodic visual checks will be made on exhaust system emissions.

              Post-works phase
              Nil




Document No. QMS•EMP-0         Authorised by                   Blacklaw Evil Contractors   Head OThce              Telephone              300
Date ar ary 2011               ^t i ,x)e „e n r l-ar.s Raun)   ABN 77 106 750 724           00 Sandalwood Lane     Facsimile        a' •;: `9
Version                        Author                                                      Forest Glen OLD 4555    [email protected] au
Next Review IN•Y L;vy 20           ':F-   '' eic *arren)
                                                                                                                                 Page 11 of 20

Page 15

                                                                                                     BLACKLAW
                                                                                                      CIVIL CON7RACTOws
            ENVIRONMENTAL MANAGEMENT PLAN (EMP)
            Noosa Bunnings




                                                     Fire C       I

            Works phase
            One general-purpose fire extinguisher and one fire extinguisher suitable for
            control of oil/petrol fire will be available on site at all times.



            A minimum of one person on site will be familiar or trained in the use of fire-
            fighting equipment.



            All flammable materials will be kept in a locked area within the site working
            area.




Document No:OMS-EMP 0 1      Authorised by                Blacklaw Civil Contractors   Head Off i ce           Telephone      44---_
Date are.a^i 2011                iP;-,o„    -,-_3 Raun)   ABN 77 106 750 724           100 Sandalwood Lare     Facsimile             7^4
Version                      Author                                                    Forest Glen QLD 4556    [email protected]
Next Review       rv 20'                 a o " -en I
                                                                                                                             Page 12 of 20

Page 16

                                                                                                00BLACKLAW
                                                                                             N* C/V/L CONTRACTORS
             ENVIRONMENTAL MANAGEMENT PLAN (EMP)
             Noosa Bunnings




             Works phase
             Where fuel, oil of other chemicals are to be stored on site, a secure, lockable
             and floored area will be provided before any of these substances are accepted
             on site. This area will be imperviously bunded with a capacity to contain not
             less than 110% of the volume of the largest container, in compliance with
             WorkCover requirements.

             Fuel, oil and chemicals will be used in a bunded area




             A 50-litre container of spill absorbent will be retained within the site working
             area to be used for emergency spills of fuel, oil or other chemicals.

             Ensure that any spills or accidents on site that are likely to cause pollution are
             managed as per this plan




Document No: QMS-EMP-G        Authorised by:              Blacklaw Civil Contractors   Head Office             Telephone      X44; ;aOC
Date ,a,_ar•i 2011            J;i - F, •en! rHans Raun)   ABN 77 106 750 724           100 Sandalwood Lane     Facsimile       4;,. 3:,99
Version                       Author:                                                  Forest Glen OLD 45Z-6   office@blacklawcivil com.au
Next Review .1am.arv 20'Z               f_ rain Warren)
                                                                                                                             Page 13 of 20

Page 17

                                                                                                        BLACKLAW
                                                                                                         CIVIL CONTRACTORS
             ENVIRONMENTAL MANAGEMENT PLAN (EMP)
             Noosa Bunnings




                                           noise ano v fora
             Pre-works phase
             The surrounding and adjoining facilities and businesses will be informed of
             working hours and the level and duration of noise to be expected during
             construction


             Works phase
             Construction noise is to be confined to 7am and 6pm Monday to Friday and
             7am to 5pm on Saturdays. No work will be undertaken on Sundays or Public
             Holidays


             Noise mitigation measures if required will be implemented during construction
             to ameliorate the effects of construction noise. Noise generated from
             construction, maintenance or demolition of a building or other structure at an
             airport should not exceed 75 dB(A), measure at the site of the nearest
             sensitive receptor

             Post-works phase
             Nil




Document No CMS-EMP-01        Authonsed by                  Biack:an• Civ i Contractors   Head Office             Telephone      _ ; 33^0
Date _ ..a ;: 3^,t             a .rqr,      --a - s Raun7   A8N               '24         t00 Sandalwood Lane     Facsimile
Version                       Author                                                      Forest Glen OLD 4556    office@blacklawcnnl com au
Next Review        a^r 20,=    --        a,c 1.3r•en)
                                                                                                                                Page 14 of 20

Page 18

                                                                                                           BLACKLAW
                                                                                                            CIVIL CONTRACTORS
                ENVIRONMENTAL MANAGEMENT PLAN (EMP)
                Noosa Bunnings




                                                   Mn1 d"U

                Works phase
                All plant/equipment operators and employees will be instructed to confine
                operations to within the clearly marked area of site operations



                All machinery will be secured against vandalism outside of working hours




                All plant/equipment will be inspected daily to avoid leakage of fuel, oil or
                hydraulic fluid to the worksite. Machinery found to be leaking should be
                repaired or replaced.

                Post-works phase
                Nil




Document No: QMS-EMP-C            Authorised by                Biack!aw Civil Contractors   read Office              Telephone      5442 3 0
Date   w.,ary 201'                Mr i.,qe rent (Hans Raun)    ABN 77 '06 750 7,14          1 0,1, Sandalwood Lane   Facsimile      442 3
Version I                         Author                                                    - :•est Glen OLD 4556    office@blacklawcivil com au
     R
Nex t evi ew: J anuary 20 ' : '             ; - aiq W arren)
                                                                                                                                   Page 15 of 20

Page 19

                                                                                                  BLACKLAW
                                                                                                   CIVIL CONTRACTORS
           ENVIRONMENTAL MANAGEMENT PLAN (EMP)
           Noosa Bunnings
                                                                                         14(




            Works phase
           Should any Acid Sulphate material or any contaminated soil be discovered it
           will be classified and disposed of to a legally operating waste management
           facility. Records of disposed waste will be kept in project records


           Waste material generated by the works will be minimised or recycled where
           feasible and cost effective.



           All waste material that cannot be recycled will be collected and removed from
           the site to be disposed of in a legal manner, i.e. at a legally operating waste
           management facility. A register of disposed waste will be kept on site.

           Bins with heavy lids will be provided within the site compound for personal
           litter.



           Bin lids will be kept closed at all times, and all bins will be emptied when they
           are three-quarters full.


           A daily inspection will be carried out to ensure the worksite is left in a rubbish
           free state.


           All loads of rubbish will be securely covered to prevent spillage during removal



           No waste is to be burnt or buried on site.



           Post-works phase
           The worksite will be left in a tidy and rubbish free state upon completion of the
           project.




Document No: QMS-EMP-C'     Authonsed by               Blacklaw Civil Contractors   Head Office             Telephone      5442 3300
Date _a^ ary 2C11            a   ,4e^•e^' -ans Raun)   ASN 77 106 750 724           100 Sandalwood Lace     Facsimile , 7 5442 3399
Version                     Author                                                  Forest Glen OLD 455E    [email protected]
Next Review -s"_arv20'-              '.:a, Tia«Qnl
                                                                                                                          Page 16 of 20

Page 20

                                                                                                   BLACKLAW
                                                                                           141, CIVIL CONTRACTORS
             ENVIRONMENTAL MANAGEMENT PLAN (EMP)
             Noosa Bunnings




                                                       •1^:^III^I_^^f^:


             Pre-works phase
             The site compound will include amenity sheds, portable toilets, and plant and
             equipment storage area.



             The site compound will be protected from theft and vandalism using security
             fencing. All equipment that could be damaged or stolen is to be stored in teh
             secured compound.


             Environmental safeguards will be established at the site compound as outlined
             in previous sections


             Post-works phase
             The compound site will be left in a tidy and rubbish free state upon completion
             of the project




Document No: QMS-EMP-0      Authonsed by                Btacklaw Civil Contractors   Head Office            Telephone      5442 3300
Date a•-.:ary 2017          Va 3ge ^e: •-'a••s Raun)    ABN 77 106 750 724           100 Sandalwood Lane    Facsimile      =442 3399
Verson '                    Author                                                   Forest Glen OLD 4555   [email protected]
Next Review: ,anuary 20'.             arz; t.arren)
                                                                                                                          Page 17 of 20

Page 21

                                                                                               BLA CKLA W
                                                                                                CIVIL CONTRACTORS
            ENVIRONMENTAL MANAGEMENT PLAN (EMP)
            Noosa Bunnings




            Pre-works phase
            Site works will not start until the erosion and sediment control works outlined
            below, are installed and functional;
                • Measures are in place; appropriate to the works being completed (Silt
                   socks in kerb/gutter, silt fencing etc)
                • The entry to and departure of vehicles from the site will be confined to
                   existing established beach access points. No new access points shall
                   be formed.

            Works phase
           Discharge waters from the site should not contain more than 50 milligrams per
           litre of total suspended solids in the design rainfall event or more than 75 NTU
           turbidity. All practical measures must still be taken in beyond-design
           events, including chemical dosing, and maintain catch and diversion drains as
           required.

           All erosion and sediment controls will be checked at least weekly and after rain
           to ensure they are maintained in a fully functional condition.


           Post-works phase
           Any temporary sedimentation control structures will be removed at the end of
           the project.




Document No V -EMP •      Authorised by             Blacklaw Civil Contractors   Head Office             Telephone
Date a         I          V i ; a art (Hans Raun)   ABN 77 106 750 724           100 Sandalwood Lare     Facsimile
Version '                 Author                                                 Forest Glen OLD 4556    officeiblacklawcivil com.au
Next Review v arv 2r,'-               a,g Warren)
                                                                                                                       Page 18 of 20

Page 22

                                                                                                 BLACKLAW
                                                                                         14:0 CIVIL CONTRACTORS
           ENVIRONMENTAL MANAGEMENT PLAN (EMP)
           Noosa Bunnings




                                                         Ch u;

           Works phase
           Materials transported in open trucks will be covered to prevent generation of
           dust.



           The tailgates of all vehicles transporting material from the site will be securely
           fixed prior to loading and immediately after unloading.



           Exhaust systems and engines for plant/equipment will be maintained
           according to the manufacturers' specifications and regularly monitored to
           ensure that exhaust emission are satisfactory (smoke for no longer than 10
           seconds). Periodic visual checks will be made on exhaust system emissions.

           Post-works phase
           Nil




Document No: DMS-EMP.O'   Authonsed by                Blacklaw Drvll Contractors   Head Office            Telephone C' 5442 3300
Date a'-.a'y 201          . a-i;e-- .    a••s Raun)   ABN 77 106750724             100 Sandalwood Lane    Facsimile ''  5442 3;59
Version '                 Author                                                   Forest Glen OLD 4556   of6ce@blacklawuvIl com.au
Next Review - ary 20':                      en)
                                                                                                                       Page 19 of 20

Page 23

        BLACKLAW                Erosion and Sediment Controls                   Phone: 07 5442 3300
        CIVIL CONTRACTORS                                                        Fax: 07 5442 3399
14O
  ^
                                            QMS 070                                    Email:

     100 Sandalwood Lane           Scdililcllt F cilcc                      [email protected]
                                                                                   ABN 77 106 750 724
    Forest Glen QLD 4556


Purpose:
  Provide a standard procedure for the installation of a sediment fence to control
  sediment runoff from exposed land, unsealed roads and stockpiles.

Materials Required
n   Commercial sediment fence;
•   Wooden stakes, staple gun and staples or star pickets and caps, wire and wire cutters;
•   Mallet or pole driver; and
•   Shovel


Procedure:

Placement                                                                                 E.ieno .no of IMae
                                                                                          up      to tho bWrom
                                                                                          0, the knc• or. $ at 0*
                                                                                          0,
Install sediment fence parallel to the                                                    ,op 01 lute dwWb^


contour of the land.
                                                       grade
Extend ends upslope so that the
ground level of the end of the silt
fence is equal to the top fabric level at
its lowest point.

Installation                                                      Figure 1. Sediment fence on
                                                                       revegetated bank
Drive wooden stakes or star pickets
at least 600 mm into the ground, with                1 2m timber stakes
                                                                                      Sediment lence
                                                     at max 2m centres
a maximum spacing of 2m apart.                                                        tabnc

Dig a 150mm deep x 100mm wide                                                         c,,ectlon 0'
                                                                                      Ilor

trench along the upslope line of the
fence for the bottom of the fabric to                                         Li
be entrenched.                                            600 mm m'n               150mm x 100mm trench

Place the bottom 300mm of the fabric
                                                                  I                with compacted backhtl

                                                                         SECTION DETAIL
into the trench and backfill trench
over base of material with soil                                Figure 2 Sediment fence installation
material and compact.                                                        detail

Fix fabric to upslope side of posts                   Maintenance
with wire ties or staples.
                                                      Sediment fences should be inspected
Where required, join sections of fabric               regularly (especially after rainfall
at a support post with a 150mm                        events) and cleaned out as required.
overlap.
                                                      Safety

                                                      Cap all Star Pickets if used

    Sediment Fence                           Document Number                                Page 1 of 1

    Issue Number 1 July 2008                    QMS 070                    Authonsed by: C. Gursanscky

Page 24

              BLACKLAW                    Erosion and Sediment Controls                      Phone: 07 5442 3300
               CIVIL CONTRACTORS                                                              Fax: 07 5442 3399
                                                   QMS 071                                          Email:

         100 Sandalwood Lane             Kerb Inlet Protection                           [email protected]
                                                                                               ABN 77 106 750 724
        Forest Glen QLD 4556


  Purpose:
    Provide a standard procedure for the installation of Kerb inlet traps to prevent sediment
    entering stormwater drainage entry points

  Materials Required
  •       Geo-fabric sausage approx half full of 50-70mm stone or gravel;
          Or
  n       Sandbags


  Procedure:                                                    Protecting Kerb Inlet with Ag Pipe
                                                                & Sediment Fence Material
  Protecting a down slope kerb inlet
                                                                Place 150mm ag pipe covered with a
  Lay sand bags or geo-fabric sausage                           geofabric sock tied at both ends and
  in a row curving upslope from the                             half filled with 20mm crushed rock
  kerb and away from the inlet                                  across inlet.
  approximately 4m upslope from the
  inlet                                                         Lift the kerb inlet grate and place
                                                                section of sediment fence material
  Over lap bags onto the kerb and                               sufficient to overhang on all sides.
  extend a minimum of 1 metre on the
  road                                                          Replace grate to lock the material in
                                                                place
  If using more than one layer, overlap
                                                                                                     Sediment fence
  the bags with the row beneath and                                                                  material placed
  leave a one bag gap in the middle of                                                              under road grate

  the top row to serve as a spillway.


      5^rnr7Da,,r i - n l
      nntn l.^rp                  - -►

                                                                                         /
                                                                                       Z /
                                                               150mm ag pipe covered with
                                                               geotextile sock and half filled
Run-oft                                                         with 20mm crushed gravel




                                                                Figure 2 Kerb inlet protected by Ag Pipe
                                                                     and Sediment Fence Material
           Figure 1 Down Slope Kerb Inlet




          Kerb Inlet Protection                      Document Number                                  Page 1 of 2

          Issue Number 1 July 2008                       QMS 071                     Authonsed by: C. Gursanscky j

Page 25

Protecting a sump-position kerb                                     Protecting a Gully Pit
inlet
                                                                    Place sand bags in a complete circle
Place bags in an arc around the curb                                around the gully pit - more than one
inlets that are in a sump position                                  layer may be required due to amount
                                                                    of run off


                              Sump Posmon Intel
   Sand Bag'                                                                            Gully pit
                                                                     Sand Bags




                                                                                                                  Run-LII




                                                                 Rein-otf
     /1W                                   Run., ,ff
                                                                                            k



  Figure 3 Sump Position Kerb Inlet
                                                                                 Figure 4 Gully Pit



Safety
Place warning devices (such as Witches Hat) as appropriate to protect public safety.

Maintenance
Inspect and repair as needed, and remove any accumulated sediments after every storm
event




   Kerb Inlet Protection                               Document Number                              Page 2 of 2

   Issue Number 1 July 2008                               QMS 071                   Authonsed by: C. Gursanscky

Page 26

        BLACKLAW                 Erosion and Sediment Controls                 Phone: 07 5442 3300
        CIVIL CONTRACTORS                                                       Fax: 07 5442 3399
                                             QMS 072                                  Email:

     100 Sandalwood Lane                Stockpiles                         [email protected]
                                                                                 ABN 77 106 750 724
    Forest Glen QLD 4556

Purpose:
  Provide a standard procedure for the placement and protection of stockpiles of topsoil,
  spoil and other material (eg: Sand, gravel, rock etc)

Materials Required
•   Commercial sediment fence;
n   Wooden stakes, staple gun and staples or star pickets & caps, wire and wire cutters;
•   Mallet or pole driver; and
•   Shovel


Procedure:                                          On flat surfaces, place sand bags or
                                                    geofabric bags filled with gravel around
Stockpiles                                          stockpile (figure 2)

Locate stockpiles as directed by Contract.          Seed or cover as directed by Contract.
If no position advised, locate on clear,
even, firm, well drained ground, with a                                                Sandbags placed
                                                                                       to divert Ilow of
separate pile for each material type.                                                  water


Do not place stockpiles in natural                           Kerb
                                                                           Stockpile
drainage lines

Place stockpiles outside drip line of trees
to prevent damage to the branches or
trunk (by machinery) and damage to roots
(by soil compaction)                                       Figure 2 Stockpile on Flat Surface

If stockpile has to be located on a slope,          Maintenance
construct diversion drain or bund on the
upslope side to divert run off around the           Sediment fences should be inspected
stockpile. Place a sediment fence 1-2m              regularly (especially after rainfall events)
down slope o f the stockpile (figure 1)             and cleaned out as required.

                                                    Safety

                                                    Cap all Star Pickets (if used)

                                                    Ensure stockpile poses no public safety
                                                    threat (no vertical faces over 1.5m), not
                                                    located in pathway or road reserve.




         Figure 1. Stockpile on Slope
    Stockpiles                                Document Number         I                      Page 1 of 1
    Issue Number 1 July 2008                     QMS 072                  Authonsed by: C. Gursanscky

Page 27

        BLACKLAW                Erosion and Sediment Controls               Phone: 07 5442 3300
        CIVIL CONTRACTORS                                                    Fax: 07 5442 3399
IV40 ^ '-.1.--0;-1----;^--
                                              QMS 073                                Email:

     100 Sandalwood Lane             Ch ec k Danis                      [email protected]
                                                                               ABN 77 106 750 724
    Forest Glen QLD 4556


Purpose:
  Provide a standard procedure for the installation of check dams to control flow velocity
  in drainage channels such as table drains, swales etc.

    Check dams are not to be used in "defined" watercourses

Materials Required
n   Rock
•   Geofabric bags approximately half full of 50-70mm stone or gravel
    or
n   Sandbags


Procedure:                                                             Sediment             Flow
                                                                       Build up
Installation

Locate check dam in straight section of
drain

Limit height of check dam to around 0.5m

Centre of check dam should be a                                                      Spill way
minimum of 150mm lower than the outer
edge to form a spillway

Spacing of rock check dams should be
such that the base of each check dam is                                     Cross Section
no higher than the top of the check dam
below it,                                              Figure 1. Rock Check Dam in Table Drain

Maintenance

Although the primary purpose is to
control flow velocity, check dams will trap
sediment on the upslope side. This
sediment should be removed before it
accumulates to half the original height of
the check dam.




    Check Dams                                 Document Number                          Page 1 of 1
    Issue Number 1 July 2008                      QMS 073              Authorised by: C. Gursanscky

Page 28

        BLACKLA W                Erosion and Sediment Controls                  Phone: 07 5442 3300
         CIVIL CONTRACTORS                                                       Fax: 07 5442 3399
14 4
   "1- 1--1'1._..-;';' "-                   QMS 074                                      Email:
                                                                            [email protected]
     100 Sandalwood Lane             Rock Filter Dams                              ABN 77 106 750 724
    Forest Glen QLD 4556


Purpose:
  Provide a standard procedure for the installation of rock filter dams to trap sediment in
  well defined gullies, excavated pits and overland flow paths.

Materials Required
•   200-350mm hard, erosion resistant rock
n   25mm aggregate
•   Geofabric

Procedure:

Installation

The size of a rock filter dam will vary
depending upon the site. General
guidelines are:
    Minimum top width 200mm
    Maximum height 1 m
    Maximum side slopes
      Upslope face
      2 (horizontal): 1 (vertical)
      Down slope face                                          Figure 1. Rock Filter Dam
      3 (horizontal): 1 (vertical)
                                                                                          Geotextile filter fabric
                                                                                          wrapped around rock
Place support rock, lay geofabric over                                                    and keyed in at the
support rock.                                                                             bottom



Place 200mm of 25mm aggregate over
filter fabric, then key 200mm into rock

Rock filter dams should be keyed in to a             200mm- 350mm rock
                                                     keyed in 200mm into
minimum depth of 200mm                               natural ground


Centre of rock filter dam should be a                      Figure 2 Rock Filter Dam key in
minimum of 200mm lower than the outer
edge to form a spillway

Maintenance

Rock filter dams require little
maintenance for short-term construction
work sites.

Excessive sediment should be removed
from upstream of the dam, if in place for
longer periods of time.
    Rock Filter Dams                         Document Number                                Page 1 of 1
    Issue Number 1 July 2008                    QMS 074                    Authorised by: C. Gursanscky

Page 29

        BLACKLAW                Erosion and Sediment Controls                 Phone: 07 5442 3300
        CIVIL CONTRACTORS                                                      Fax: 07 5442 3399
                                           QMS 075                                   Email:
                                                                          [email protected]
     100 Sandalwood Lane          Erosion Matting                               ABN 77 106 750 724
    Forest Glen QLD 4556


Purpose:
  Provide a standard procedure for the installation erosion matting to prevent erosion by
  absorbing the impact of rainfall and reducing runoff velocities.

Materials Required
•   Jute Matting or other designated geo-fabric
•   Staples

Procedure:

Installation                                                                                    Dirett^on


Before placement ensure surface is
smooth, uniform and free from stones,
tree roots or other debris.                                              Ph

Place mesh according to site plans.
                                                                 Figure 1. Erosion Mat
Roll the mesh out in direction of flow
unless otherwise instructed.

Anchor the mesh in a 150mm trench to
start.

Overlap adjacent strips and ends by at
least 150mm

Do not stretch mesh; lay it evenly but
loosely on soil surface.

Staple along each edge of the matting;
spacing not greater than 1.2m. Staple
rows through the middle as required,
alternating each row of staples from the                      Figure 2 Staple layout guide
row above it.




    Rock Filter Dams                        Document Number                              Page 1 of 1
    Issue Number 1 July 2008                      QMS 074               Authorised by: C. Gursanscky

Page 30

        BLACKLAW               Erosion and Sediment Controls                     Phone: 07 5442 3300
        CIVIL CONTRACTORS                                                         Fax: 07 5442 3399
                                            QMS 076                                       Email:
                                                                              [email protected]
     100 Sandalwood Lane         Sccfiillcilt Basins                                ABN 77 106 750 724
    Forest Glen QLD 4556


Purpose:
  provide a temporary settling pond with a controlled storm water release structure used
  to collect and store sediment produced by construction activities before runoff is
  discharged.

Materials Required
•   Outlet pipe with riser          n   Geo-textile
n   Rock - 75 - 150 spalls          above materials may be required dependant upon site conditions




Procedure:

Installation

Construct excavation or embankment to
create dam wall, primary outlet and
emergency spillway to contract
specifications.

Locate as directed by contract ensuring
that the basin is constructed before
clearing and grading work begins (when                                     Figure 1.
feasible) and only water polluted by site
activities enters the basin.                          Maintenance

The size of a sediment basin will vary                Inspect basin prior to forecast rain, daily
depending upon the needs of the site, but             during extended rain events. after rain
will generally conform to the minimum                 events and fortnightly during the dry
length/width ratio of 3:1.                            season.

Remove all vegetation and topsoil from                Check for seepage and structural
within the storage area and from under                soundness.
the dam wall location.
                                                      Check inlet and outlet area for erosion
Securely anchor the outlet pipe/riser and             and stabilise if required
construct emergency spillway.
                                                      Sediment should be removed when
                                                      accumulation reaches one half the
If seepage is a considered a problem, line
                                                      designated sediment storage volume.
basin with geo-textile.
                                                      Remove accumulation of live and dead
                                                      floating vegetation.




    Sediment Basins                            Document Number                               Page 1 of 1
    Issue Number 1 July 2008                       QMS 076                  Authorised by: C. Gursanscky j

Page 31

                                                                                          N"""-a`.com
                          Date: 27/06/2011 Project: Bunnings Noosa
                          Comments :
                                                                               Legend
  00BLACKLAW              Stage 1 External Roadworks                        Work Area
I%k   CIVIL CONTRACTORS


                          - Contruction of New Access Rd -           ^   ® Bollard
                                                                            Offset Distance Marker
                          Refer -   UTCD Drawing 10                         Safety Zone

Page 32

                                                                               ,..`...
                      Date: 27/06/2011 Project: Bunnings Noosa
                      Comments :
                                                                 Le g end
dO BLACKLAW
  CIV/L CONTRACTOR!   Stage 2 External Roadworks                 Work Area
                      -Centre Island Reconfiguration-            Bollard
                                                                 Safety Zone
                      Refer - MUTCD Drawing 7
                      .fT

Page 33

                      Date: 27/06/2011 Project: Bunnings Noosa
                      Comments:
                                                                     Legend
BLACKLAW
CIVIL CON TRAC TORS   Stage 3 External Roadworks                     Work Area
                      -AC Overlay Phase 1-                           Bollard
                                                                 A
                                                                     Safety Zone
                              UTCD Drawing 7

                                -1, r           •        !'
                                        Trades Parking

Page 34

 

Date: 27/06/2011 Project: Bunnings Noosa

 

 

 

 

Comments:
Stage 3 External Roadworks
-AC Overlay Phase 2-

 

Legend
@ Bollard

p x] Work Area
Safety Zone

 

Page 35

 

 

 

~ START OF WALL

  
 
  
 
 

 

RETAINING WALL KEY PLAN

RETAINING WALL RW1
{REFER SHEET RO1)

 

 

 

PROPOSED BUNNINGS SITE

ONO

\

 
   

 

 

  
 

START OF WALLS.

 

RETAINING WALL RW2
(REFER SHEET RO2}

 

 

END OF WALL.

 

BACKFILL WITH ‘NO - FINES’ CONCRETE OR SCREENINGS

REFER TO ARCH. ORG.
AG-O1 FOR FENCE
DETALS

  

po————SITE BOUNDARY

 

 

FRONT
NON-RETAINING
FACE

100 MHA. WEEPHOLES , 2No, { MIN. }
PER PANEL, { TYPICAL }

 

 

BORD TRORISDRT LE.

3008 X 1000 DEEP
BORED PIER.

 

 

PRECAST PANEL

 

ae

  

 

 

 

 

 

 

<2 ETAINING FACE

96 DIA. “AGI DRAIN , iN 20 mm DIA. { NOM. SIZE }
SCREENINGS, CONNECT TG STORMWATER DRAINAGE

 

 

 

 

L

 

 

 

 

 

 

SYSTEM,

MASS CONC. { N25 } BORED PIER.

 

GRADE N25 CONCRETE.

 

 

 

 

 

 

 

 

SOLDIER / BORED PIER SCHEDULE

 

RETAINED

SOLDIER

PIER DEPTH: | PANEL THICKNESS

 

 

 

   

 

 

 

   

 

 
 

SOLDIER NO. | eight fnetres) Souler Size SPACING Qa) | PIER DIA. ina) ‘ont ‘nal PANEL REINFORCEDEENT
A O< HS 0 _ 206 UB 2S 250 600 1200 ~ 150
8 LOS HS 20 200 UB 25 250 600 80 : | RLOWG MESH, EACH F ~ -
c 26 < HS 25 250-08 3 00 60 RLETHG MESH TAL -

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

25 SHS 30
L 39 < 4835 —_ = UB AG 250 60 3500
F OSHS 10 200 UB 25 250 600 1400 150 RUTB MESH, EACH FACE
G 10 SHS 2.00 200 UB 25 _ 250 600 “y 200 - 50 RUI1B MESH, EACH FACE

 

NOTE:

1. ALL MAIN BARS IN RECTANGULAR MESH ARE 70 BE HORIZONTAL.

2. PANEL CONCRETE GRADE NAO,

3. COVER FO REINFORCEMENT 30mm.

4. ADDITIONA: SARS ARE T@ BE PLACED ON THE FRONT
INON-RETAINING) FACE.

5. PROVIDE 2NO. ST SWL LIFTERS PER PANEL.

6, PROVIDE Nié PERIMETER BAR, 400 COGS AT CNRS.

REFER TO ELEVATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STEEL SOLDIER WITH PROTECTIVE COATING , CAST INTO BORED PIERS,
REINFORCED CONCRETE PANELS. ‘NO FINES’ CONC. BACKRILL.

SECTION (BY

 

 

 

 

 

 

SEERES

 

ADDITIONALI REINFORCEMENT AS NOTED IN SCHEDULE
{ CRINGN-RETAINING OR FRONT FACE }

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCALE £500 i
TYPICAL ELEVATION
SECTION “A
NOTES :
1 ALL ‘UBs’ AND ‘UCs’ SHALL BE HOT DIP GALVANISED IN ACCORDANCE
WITH AS.4791
2. ALL ‘CHS’ AND ‘SHS' SHALL BE HOT DIP GALVANISED IN ACCORDANCE
WITH AS.4792.
3. GALVANISING IS TO BE AT A MINIMUM RATE OF 300g/m2.
SUE ISSUED FOR DATE | ORAWH jaPPROVED] ISSUE ISSUED FOR DATE. | Raw [APpaaven| O18. K. BENNETT DATE APRIL 2011 SON: PRORCE: eae we
0 PRELIKNARY DRAWINGS epae ae T-FINLAYSOM Stitt AS SHOWN PROPOSED BUNNINGS STRUCTURAL DRAWING YQ
“a vaewwuavoeeens ew ff a are TEM GROUP Pty Lid H. TROON PTY. LTD.
3 FoR APPROVAL san | eee “FOHECRES: é APPROVED: 3 i tat5 St eae avunaniiuta CAND STEELFASHIGATORS WAREHOUSE DRAWING TILE
Gi . . Bae | Z 7 Sn, be BUILDERS - MIMER CIAL ANE tit
iba. e899 a ph (oa) soa0 ene fo SOK RL WENOOUREE 3355 EUMUND I-NOOSA ROAD RETAIN ING WALL DETAILS
. fo anf af an eet = TGM ABN 1 aS 30 1 Feces NOOSAVILLE
(©) COPYRIGHT TGH GROUP PTY. LTD. QUEENSLAND TON REE. Ma: A400. 04 ‘SHEET: RO3 issue: 03

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 36

 

 

“EC OF 9 “92

 

 

 

4400-02-CE

TGM REF. No.

 

DRAWING INDEX

BUNNINGS WAREHOUSE

 

EUMUNDI-NOOSA ROAD, NOOSAVILLE
ROUNDABOUT AND ROAD WORKS

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL NOTES

THESE DRAWINGS SHALL BE READ IN
CONJUNCTION WITH THE SPECIFICATION AND
ALL OTHER RELEVANT CONSULTANTS
DRAWINGS, SPECIFICATIONS, CLIENT
INSTRUCTIONS, AND ANY WRITTEN
INSTRUCTIONS ISSUED DURING THE COURSE OF
THE CONTRACT. ANY DISCREPANCIES SHALL BE
REFERRED TO THE ENGINEER FOR DISCUSSION
BEFORE PROCEEDING WITH WORK.

DIMENSIONS SHALL NOT BE OBTAINED BY
SCALING THE DRAWINGS.

SUBSTITUTES WILL NOT BE PERMITTED
WITHOUT THE WRITTEN APPROVAL OF THE
ENGINEER.

DURING CONSTRUCTION THE SITE SHALL BE
MAINTAINED IN A STABLE CONDITION AND NO
PART OF THE SITE SHALL BE UNSAFE AS ‘A
RESULT OF THE CONSTRUCTION PROCEDURE.

MATERIALS AND WORKMANSHIP SHALL BE IN
ACCORDANCE WITH THE SPECIFICATION AND
SUNSHINE COAST REGIONAL COUNCIL
STANDARDS, THE CURRENT

REVISION OF ALL RELEVANT SAA CODES, THE
REQUIREMENTS OF THE QUEENSLAND BUILDING
REGULATIONS, THE BUILDING CODE OF
AUSTRALIA AND THE RELEVANT AUTHORITIES.

UNLESS NOTED OTHERWISE ON A PARTICULAR
DRAWING THESE NOTES SHALL APPLY

THE LOCATION OF UNDERGROUND SERVICES
SHOWN ARE INDICATIVE ONLY. THE
CONTRACTOR IS RESPONSIBLE FOR
CONTACTING ALL AUTHORITIES TO
DETERMINE THE LOCATION OF UNDERGROUND
SERVICES PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION WORK. ANY CLASH OF
WORKS WITH A SERVICE IS TO BE REPORTED
TO THE ENGINEER IMMEDIATELY. THE
CONTRACTOR SHALL ENSURE THAT ALL
SERVICES ARE FULLY PROTECTED DURING
CONSTRUCTION, ANY SERVICES DAMAGED
DURING CONSTRUCTION SHALL BE REPAIRED
AT THE CONTRACTORS EXPENSE.

THE TERM “ENGINEER” SHALL MEAN A
REGISTERED PROFESSIONAL
ENGINEER QUEENSLAND

CONCRETE NOTES

ALL CONCRETE AND CONCRETE PRACTICE SHALL BE GENERALLY
IN ACCORDANCE WITH AS 3600 CONCRETE STRUCTURES CODE.

ALL INSITU CONCRETE SHALL HAVE A CHARACTERISTIC
STRENGTH AT 28 DAYS (F’c) OF 25 MPa UNLESS NOTED
OTHERWISE.

CONCRETE ELEMENTS SHOWN ON THESE DRAWINGS MUST NOT
BE REDUCED IN ANY WAY WITHOUT THE ENGINEER’S
APPROVAL. NO HOLES, CHASES, OR EMBEDMENTS, OTHER
THAN THOSE SHOWN WILL BE PERMITTED IN ANY CONCRETE
ELEMENTS WITHOUT THE ENGINEER’S APPROVAL.

REINFORCEMENT NOTATION
R - DENOTES STRUCTURAL GRADE PLAIN ROUND
BARS TO AS 1302
N - DENOTES HOT ROLLED DEFORMED BARS TO
AS 1302 (410Y)
SL72 - DENOTES REINFORCEMENT FABRIC TO AS 1304
(12 DENOTES SIZE OF FABRIC)

 

LAPPING REINFORCEMENT 5 50
MESH = = ° “= = a
TRENCH MESH 500mm FULL WIDTH AT INTERSECTION
BAR SIZE TOP BARS OTHER BARS
(300mm OR MORE
CONCRETE BELOW}
Ni2 300
N16 700 400
N20 600
COVER

CLEAR COVER TO REINFORCEMENT SHALL BE AS NOTED
ON THE DRAWINGS.

CONCRETE COVER SHALL BE MAINTAINED BY THE USE
OF APPROVED CHAIRS AND/OR CONCRETE BLOCKS.
CONDUITS, PIPES ETC. ARE NOT T0.BE PLACED IN
CONCRETE COVER.

THE SLUMP OF ALL CONCRETE AT THE TIME OF PLACING AT
THE JOB SHALL BE 75mm +/- 15mm TOLERANCE U.N.O.

ALL CONCRETE PLACED IN POSITION SHALL BE ADEQUATELY
VIBRATED.

ALL CONCRETE SHALL BE CURED TO THE APPROVAL OF
THE ENGINEER.

ALL PIPEWORK CAST INTO CONCRETE IS TO BE SLEEVED
OR LAGGED WITH APPROPRIATE COMPRESSIBLE
MATERIAL FOR THE FULL LENGTH OF EMBEDMENT.

CIVIL NOTES

ALL DIMENSIONS ARE IN MILLIMETRES UNLESS SHOWN
OTHERWISE. ALL LEVELS SHOWN ARE TO AUSTRALIAN HEIGHT
DATUM (TBM) AS NOTED ON THE PLANS. ALL SET-OUT
CO-ORDINATES ARE BASED ON AN ARBITRARY CO-ORDINATE
SYSTEM AS NOTED.

UNLESS OTHERWISE SPECIFIED OR APPROVED BY THE ENGINEER,
LAYING OF ALL PIPES OR CULVERTS SHALL COMMENCE AT THE
DOWNSTREAM END.

PRIOR TO ANY WORKS COMMENCING THE CONTRACTOR SHALL
COMPLETE A CHECK OF ANY EXISTING CONNECTING STORMWATER
DETAILS, INCLUDING INVERTS, DIAMETERS, DEPTHS, MATERIAL
ETC, TO CONFIRM ANY EXISTING DETAILS SHOWN ON THE
DRAWINGS. ANY DISCREPANCY SHALL BE REPORTED TO THE
ENGINEER.

STORMWATER DRAINS ARE TO BE PVC SEWER QUALITY PIPES
OR REINFORCED CONCRETE AS NOTED.

RC PIPES ARE TO BE RUBBER RING JOINT.ED CLASS 3 UNDER
VEHICLE PAVEMENTS. ALL RC PIPES ELSEWHERE ARE TO BE
CLASS 2 WITHOUT RUBBER RING JOINTS.

DRAINAGE PIPES MUST BE BEDDED IN ACCORDANCE WITH THESE
DRAWINGS.

DRAINAGE, SERVICES AND CONDUIT TRENCHES UNDER
PAVEMENTS, FOOTPATHS AND PAVING ARE TO BE BACKFILLED
TO THE UNDERSIDE OF THE PAVEMENT WITH AN APPROVED
CONSOLIDATED MATERIAL IN ACCORDANCE WITH THE RELEVANT
MUNICIPALITIES CONDITIONS. :

THE LOCATION OF EXISTING UNDERGROUND SERVICES SHOWN IS
INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR
CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATIONS
OF UNDERGROUND SERVICES AND OTHER ASSOCIATED WORKS,

ANY CLASH OF THE WORKS WITH A SERVICE IS TO BE REPORTED
TO THE ENGINEER IMMEDIATELY. THE CONTRACTOR SHALL
ENSURE THAT SERVICES ARE FULLY PROTECTED DURING
CONSTRUCTION. ANY SERVICES DAMAGED DURING CONSTRUCTION
SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.

SERVICES OTHER THAN THOSE SHOWN ON THE DRAWINGS MAY
EXIST. THE CONTRACTOR IS TO ALLOW FOR THE ALTERATION TO
SERVICES WITHIN THE SITE, INCLUDING THE ADJUSTMENT OF PIT
COVER LEVELS AND. THE REMOVAL AND SEALING OF UNWANTED
SERVICES & ASSOCIATED PITS & FITTINGS.

EXPOSED SUBGRADE AREAS SHALL BE PROOF ROLLED UNDER
THE SUPERVISION OF THE ENGINEER USING A 10 TONNE AXLE
LOAD, SOFT AREAS DETECTED SHALL BE EXCAVATED AND
BACKFILLED AS DIRECTED BY THE ENGINEER.

THE PAVEMENT SUB-BASE COURSE IS TO BE COMPACTED TO
97% MODIFIED MAXIMUM DRY DENSITY COMPACTION. THE
PAVEMENT BASE COURSE TO 98% MODIFIED MAXIMUM DRY
DENSITY.

ALL WORKS ADJACENT TO THE SITE ARE TO BE APPROVED
INSPECTED BY SUNSHINE COAST REGIONAL COUNCIL.

THE ORIENTATION OF ALL STORMWATER DRAINAGE ACCESS
COVERS & GRATES ARE SHOWN INDICATIVELY AND ARE TO BE
MANUFACTURED & INSTALLED IN ACCORDANCE WITH
AS3996-2006.

COUNCIL HOLD POINTS

IN ACCORDANCE WITH HOLD POINTS SPECIFIED IN PRE-START
DOCUMENTATION. ALL HOLD POINTS TO BE CERTIFIED BY A RPEQ
ENGINEER.

PROVIDE TOOLED JOINTS IN KERBS, KERB AND CHANNEL AT 2.0m
MAXIMUM CENTRES.

SAWCUT EXISTING KERBS & PAVEMENTS WHERE REQUIRED FOR
INSTALLATION OF NEW KERBS AND WHERE NEW WORK IS TO
MATCH EXISTING.

THE CONTRACTOR SHALL AT ALL TIMES DURING THE CURRENCY
OF THE WORK PROTECT THE PUBLIC FROM THE WORKS, PLANT,
TRENCHES ETC. OCCASIONED BY THE WORKS BY THE USE OF
APPROVED BARRICADES AND BARRIERS. SUCH PROTECTIVE
MEASURES WILL BE SUBJECT TO THE APPROVAL OF THE
ENGINEER AND A REPRESENTATIVE FROM SUNSHINE COAST
REGIONAL COUNCIL. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY DAMAGE OR INJURY ARISING FROM THE NEGLECT OR
INSUFFICIENCY OF SUCH PRECAUTIONS.

THE CONTRACTOR IS ADVISED THAT THE MINES (TRENCHES)
REGULATIONS 1982 WILL APPLY TO THIS PROJECT. THE
CONTRACTOR IS REQUIRED TO SATISFY AND/OR PUT INTO
EFFECT ALL REQUIREMENTS. OF THOSE REGULATIONS AND THOSE
OF THE OFFICE OF MINERALS AND ENERGY.

THE WORKS SHOWN HEREIN ARE SUBJECT To THE SUPERVISION
OF THE PRINCIPAL’S APPOINTED SUPERINTENDENT.

CARE IS TO BE TAKEN TO PROTECT EXISTING FENCES, BUILDINGS,
FITTINGS, SERVICES, FURNITURE, SIGNAGE, TREES AND OTHER
ITEMS TO BE RETAINED FROM ANY DAMAGE.

UNWANTED PITS, PIPES SERVICES ECT. IN PAVEMENT AREAS ARE
TO BE REMOVED AND THE HOLE BACKFILLED WITH AN APPROVED
CONSOLIDATED MATERIAL IN ACCORDANCE WITH THE RELEVANT
MUNICIPALITIES CONDITIONS.

THE CONTRACTOR SHALL INSPECT THE SITE AND DETERMINE THE
EXISTING ASPHALT PAVING, PITS, PIPES, SERVICES, TREES,
KERBS, DRAINS, BUILDINGS, FITTINGS, FURNITURE, SIGNAGE, ETC.
THAT ARE TO BE REMOVED AND HE SHALL ALLOW IN HIS TENDER
PRICE FOR ALL COSTS ASSOCIATED WITH THE NECESSARY
REMOVAL.

IN AREAS WHERE THERE IS TO BE FILLING UNDER PAVEMENT
AREAS, THE SUBGRADE SHALL BE CLEARED OF ANY ROOT
MATTER AND LOOSE MATERIAL TO THE DESIGN LEVELS. THE
SUBGRADE AREA SHALL BE PROOF ROLLED UNDER THE
ENGINEERS SUPIVISION USING A 10 TONNE AXLE LOAD TO
LOCATE ANY SOFT SPOTS. ANY SOFT SPOTS SHALL BE
EXCAVATED AND REPLACED WITH AN APPROVED MATERIAL IN
150mm COMPACTED LAYERS TO A MODIFIED DRY DENSITY OF 95%

COMPACTION.
THE CONTRACTOR SHALL ALLOW TO PROVIDE TEMPORARY

SHUTTERS FOR ALL TRENCHES AS NECESSARY.

SURPLUS SPOIL NOT REQUIRED BY THE DEVELOPER SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE
REMOVED FROM THE SITE, TC THE MUNICIPAL TIP OR A SITE
APPROVED UNDER THE COUNCIL PLANNING & ENVIRONMENT ACT
AND THE EPA ACT.

THE CONTRACTOR SHALL DEVELOP AND ENSURE THE STRICT
IMPLEMENTATION OF AN APPROVED SITE ENVIRONMENT
MANAGEMENT SYSTEM GENERALLY IN ACCORDANCE WITH THE
RELEVANT EPA QUEENSLAND REGULATIONS.

FOR APPROVAL

 

 

 

EC10F 9 | GENERAL NOTES & DRAWING INDEX
EC2 OF 9 | PROPOSED ROUNDABOUT PAVEMENT LAYOUT PLAN
EC3 OF 9 | GATEWAY DRIVE CROSS SECTIONS
ECh OF 9 | EUMUNDI EAST CROSS SECTIONS
ECS OF 9 | EUMUNDI WEST CROSS SECTIONS
ECé OF 9 | KERB SETOUT CO-ORDINATES AND LEVELS
EC7 OF 9 | GATEWAY DRIVE LONGITUDINAL SECTION
EC8 OF 9 | DRAINAGE LONGITUDINAL SECTIONS
EC9OF9 | LINEMARKING PLAN
= maa een

 

02

ISSUED FOR APPROVAL

24/06/11} SM.

SURVEY:

SHEET SIZE: y4

 

 

CHECKED:

APPROVED:

 

DATE:

DATE:

 

 

 

 

 

 

 

 

 

 

 

 

©) COPYRIGHT T.G.M GROUP PTY, LTD.

 

& —— J

TG

TGM GROUP Pty Ltd BSlax
Ballarat @
1315 Sturt Street ©
Ballarat, VIC 3350
Ph: (03) 5330 8888 ——auawiso. 00!

Web: tgmgroup.com —_—ougs ASINZS 4804
A.B.N. 11.125 568 461 — emironmexASINZS 14004

 

CLIENT:

H. TROON PTY. LTD.

ALUMINIUM AND STEEL FABRICATORS
BUILDERS - COMMERCIAL AND INDUSTRIAL

P.O. BOX 84, WENDOUREE, 3355.

Tel: {03} $339 2208 ~ (03) 5339 3622
Fax: (03) 5338 1310

Email: [email protected]

 

PROJECT:

PROPOSED BUNNINGS
WAREHOUSE
EUMUNDI-NOOSA ROAD
NOOSAVILLE, QUEENSLAND

CIVIL DRAWING

 

DRAWING TITLE:

GENERAL NOTES & DRAWING INDEX

 

TGM REF. No.: SHEET:

 

 

4400-02-CE

 

ECi'9

REV:

 

02

 

 

 

Page 37

 

NOTE: THE CONSTRUCTION CONTRACTOR IS TO BE AWARE OF AND ALSO
IMPLEMENT ALL RELEVANT PROCEDURES IN ACCORDANCE WITH
SUNSHINE COAST COUNCIL DEVELOPMENT APPROVAL DETAILS.

 

 

 

 

Metal storage sheds
OTE: THE TOTAL REQUIRED PAVEMENT THICKNESS MUST BE BASED ON THE DEPARTMENT OF MAIN ROAD'S PAVEMENT
DESIGN MANUAL USING SOAKED CBR TESTS OF THE SUBGRADE.
THE DESIGN PAVEMENT THICKNESS, TOGETHER WITH CBR TEST RESULTS MUST BE SUBMITTED TO COUNCIL'S CHIEF
EXECUTIVE OFFICER (CEO) FOR APPROVAL PBIOR TO PLACEMENT OF PAVEMENT MATERIAL.

 

 

 

2
\\ me he : 26 RP222164

SP151406
HA é
MATCH EXISTING PAVEMENT LEVEL & .

al : " \ -| GEOMETRY
Lid Level 8.34 | iii
IL 5.60

2

Ye Ss SP131406
//JTIK Footpath FOR INTERNAL = / - ° ; _ wee

j “ API) ACCESS To BUNNINGS an
Z| i | ~ J — 50
NOTE: THE LOCATION OF UNDERGROUND SERVICES SHOWN ARE nar - EXISTING SIDE ENTRY PITS TO BE MODIFIED.
INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR

/MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL SP?1 | ee me

PMveyyay yyy oe a “ He ene ~ :
CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATION OF mae A VA\\\\' NS cee a AL / ff me 1
UNDERGROUND SERVICES PRIOR TO THE COMMENCEMENT OF J Li} NN _p | NG i Ai ¢ ; : .
CONSTRUCTION WORK. ANY CLASH OF WORKS WITH A SERVICE IS . JETER PR OPOSED BUNNINGS SITE EAL / “ ue _ RP135064
TO BE REPORTED TO THE ENGINEER IMMEDIATELY. THE Hi oS a SI

CONTRACTOR SHALL ENSURE THAT ALL SERVICES ARE FULLY (i .
PROTECTED DURING CONSTRUCTION, ANY SERVICES DAMAGED
DURING CONSTRUCTION SHALL BE REPAIRED AT THE
CONTRACTORS EXPENSE.

 

TGM REF. No. 4400-02-CE

Metal storage sheds

 

 

 

LO 3 oh
MEDIAN KERB TAPER TO MATCH
° = oe @BACK TO EXTENT OF WORKS
a / a RETAINING WALL. DESIGN BY OTHERS 71) oom es a eef Z
NOTE: ANY SERVICE THAT NEEDS TO BE ALTERED AS PART OF THE NEW 308 a REFER STRUCTURAL DRAWING

ROADWORKS SHOULD BE DONE SO IN ACCORDANCE WITH THE _— / 4400-01 RO1 FOR DETAIL

SERVICE AUTHORITY GUIDELINES. SP114181 - ;

CONTRACTOR TO NOTIFY THE SERVICE AUTHORITIES PRIOR TO

ANY WORKS COMMENCING.

 

 

 

 

NEW FOOTPATH TO
MATCH EXISTING
NOTE: REFER SHEET EC9 FOR SIGNAGE AND LINEMARKING DETAILS

 

 

 

NEW KERB TO MEDIAN TO MATCH
EXISTING

 

- Ze Cae - 0
: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE. A it eee ~
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS. 4

EGS , BUP 13364
WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE 5 ‘ J
MINIMUM COVER.

 

 

 

: / ; x Zep Toba
: ISOLATION VALVES TO BE INSTALLED ON EXISTING WATER MAINS. | “ . . , ; ao
POSITIONS OF ISOLATION VALVES TO BE LOCATED EITHER SIDE OF PROPOSED / at flan oN /
ROUNDABOUT. FINAL POSITION TO BE CO-ORDINATED WITH SUNSHINE COAST . : | MATCH EXISTING PAVEMENT
COUNCIL ENGINEER, UNITY WATER AND CONTRACTOR ON SITE : “LEVEL & GEOMETRY

 

 

 

OS SAWCUT EXISTING PAVEMENT ALONG. 7
VEGETATION CLEAR ZONE FROM OVERHEAD POWER LINES. ‘ . DICE EDGE OF NEW KERB & CHANNEL 3793 1
LIMIT TREE REMOVAL IN ACCORDANCE WITH COUNCIL 2 00: - | Za 1
INSPECTION AND IN PRINCIPAL AGREEMENT FROM SITE 4] \ Oe ES
MEETING ON 22/06/11 : = : “

BUP 13364
or RP131576

ek
“e
EXISTING SIDE ENTRY PIT TO BE MODIFIED.

ag WW POP LEGEND - PROPOSED WORKS
MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL f 5 - . / arch eee = ; | : ,

EN ; GA astro
“LEVEL & GEOMETRY 2 z CK wl Ss DESIGN KERB & CHANNEL

LEGEND - EXISTING CONDITIONS

KERB & CHANNEL TO BE REMOVED
Le 2 KERB & CHANNEL TO BE REMAIN
CONCRETE PAD SUITABLE FOR A FLECTRICTY «TELSTRA ES

fe? COUNCIL VEHICLE. REFER LANDSCAPE
506

MANHOLE
7 “7 ARHITECTS DRAWINGS FOR LOCATION. EXTENT OF PROPOSED ATH Buse © Tease
oS ao . STING KERB ISLAND POWER
SP114181 ; OE:

POLE TELSTRA ow WA
-TO BE REMOVED EXTENT OF LT PAVEMENT TO BE LIGHT © MARKER METER

CONFI WITH CBR & EXISTING POLE 6 FENCE @ TAP
P. TESTING

& ELECTRICITY WATER
MARKER
P453000 EXISTING KERB ISLAND RELOCATED WATER MAIN (IN ACCORDANCE

ELECTRICTY TELSTRA STORMWA
B oir PIT MANHOL

 

 

 

 

%, PS VALVE
@ SEWER | )TREE @ FIRE
<I WITH INDICATIVE UNITYWATER PLAN) ~ TO BE MANHOLE Na HYDRANT
TO BE REMOVED CONFIRMED WITH UNITY WATER @ Nspection © SHRUB water
BUPYO109 g earric SZ Pa MARE
id BOLLARD
EXTENT OF BIKE LANE LINEMARKING LIGHT .

TRAFFIC BENCH
@ SIGN “S SIGN A MARK

LINEMARKING
P307631

SUBJECT LOT BOUNDARY
—————_ ADJOINING BOUNDARY
OVERHEAD POWER LINE
UNDERGROUND POWER CABLE
910 2 —————_ GAS LINE
BN SEWER LINE
: ———————— STORMWATER LINE
RP150347 > a RP150347 TELSTRA CABLE
OPTICAL FIBRE CABLE
WATER RETIC
EDGE OF VEGETATION
CENTRE-LINE OF GULLY
CHANGE OF GRADE
~ ———-—— TOP OF BANK
| . — BOTTOM OF BANK
19 P94612 ane os
TRANSITION NEW KERB
ALIGNMENT TO MATCH

FENCE LINE
3
RP150347
EXISTING KERB ALIGNMENT.

EXTENT OF PAVEMENT WORKS

WALL
Qe EDGE OF BITUMEN
902 a

a bacr'or Kere
we \es / ~ RP1SO547 = = CONCRETE
RP 150345 A <\

PAVING

FOR APPROVAL

ISSUED FOR DATE | DRAWN | APPROVED fiSSUE ISSUED FOR

SYS oN IP533
DATE | DRAWN | APPROVED} DESIGNED: G MANSELL DATE: 19/04/11
ISSUED FOR INFORMATION ss/ownt| SM.

CLIENT: PROJECT:
DRAWN:

S. MANTERFIELD SCALE: 4500
KERB ALIGNMENT MODIFIED, ISSUED TO ENERGEX | | 08/04/11 SM.

CIVIL DRAWING 0
SURVEY: _ SHEET SIZE: y 4 TGM GROUP Pty Ltd BSlax H. TROON PTY. LTD. PROPOSED BUNNINGS i
KERB ALIGNMENT MODIFIED, RE-ISSUED TO ENERGEX | 20/04/11] SM. CHECKED: APPROVED: — ee ©

ALUMINIUM AND STEEL FABRICATORS
1315 Sturt Street
ISSUED FOR APPROVAL 26/06/11) SM.

DRAWING TITLE:
puilarae, urt Street po. Box au wenoouret “TT INDUSTRIAL WAREHOUSE PROPOSED ROUN DABOUT
aE TG M hs (03) $330 8868 ounls0 0 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA RCAD
ISSUED FOR APPROVAL 29/07/11 SM. = = o onas.

Fax: (03) 5338 1310
A.B.N. 11.125 568 461 Environment AS/NZS 14001

PAVEMENT LAYOUT PLAN
Email: [email protected] NOOSAVILLE, QU EENSLAND ane =< =
() COPYRIGHT T.G.M GROUP PTY. LTD, Now: 4400-02-CE EG2 9 0

 

 

Page 38

 

05

REV.

 

9

EC2°

SHEET:

 

4400-02-CE

TGM REF. No.:

 

 

 

NOTE: THE CONSTRUCTION CONTRACTOR IS TO BE AWARE OF AND ALSO
IMPLEMENT ALL RELEVANT PROCEDURES IN ACCORDANCE WITH
SUNSHINE COAST COUNCIL DEVELOPMENT APPROVAL DETAILS.

 

 

 

 

 

 

NOTE: THE TOTAL REQUIRED PAVEMENT THICKNESS MUST BE BASED ON THE DEPARTMENT OF MAIN ROAD'S PAVEMENT

DESIGN MANUAL USING SOAKED CBR TESTS OF THE SUBGRADE.

THE DESIGN PAVEMENT THICKNESS, TOGETHER WITH CBR TEST RESULTS MUST BE SUBMITTED TO COUNCIL’S CHIEF

EXECUTIVE OFFICER (CEO) FOR APPROVAL PRIOR TO PLACEMENT OF PAVEMENT MATERIAL

 

 

Lid Level 8.31 =
IL 5.60 Lid-tevel 8:64
: IL 6.440

 

NOTE: THE LOCATION OF UNDERGROUND SERVICES SHOWN ARE
INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR
CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATION OF
UNDERGROUND SERVICES PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION WORK. ANY CLASH OF WORKS WITH A SERVICE IS
TO BE REPORTED TO THE ENGINEER IMMEDIATELY. THE
CONTRACTOR SHALL ENSURE THAT ALL SERVICES ARE FULLY
PROTECTED DURING CONSTRUCTION, ANY SERVICES DAMAGED
DURING CONSTRUCTION SHALL BE REPAIRED AT THE
CONTRACTORS EXPENSE.

 

 

 

 

 

NOTE: ANY SERVICE THAT NEEDS TO BE ALTERED AS PART OF THE NEW
ROADWORKS SHOULD BE DONE SO IN ACCORDANCE WITH THE
SERVICE AUTHORITY GUIDELINES.

CONTRACTOR TO NOTIFY THE SERVICE AUTHORITIES PRIOR TO
ANY WORKS COMMENCING.

 

 

 

NOTE: REFER SHEET EC9 FOR SIGNAGE AND LINEMARKING DETAILS

 

 

 

NOTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS.
WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE

MINIMUM COVER

 

 

SP114181 UR

     

 

 

-| GEOMETRY

  

 

 

 

 

 

 
      

 

 

    
 

 

508

     

 

 

 

NEW FOOTPATH TO. TL

MATCH EXISTING

 

NOTE: ISOLATION VALVES TO BE INSTALLED ON EXISTING WATER MAINS.

COUNCIL ENGINEER, UNITY WATER AND CONTRACTOR ON SITE

 

POSITIONS OF ISOLATION VALVES TO BE LOCATED EITHER SIDE OF PROPOSED
ROUNDABOUT. FINAL POSITION 70 BE CO-ORDINATED WITH SUNSHINE COAST

 

 

VEGETATION CLEAR ZONE FROM OVERHEAD POWER LINES

LIMIT TREE REMOVAL IN ACCORDANCE WITH COUNCIL
INSPECTION AND IN PRINCIPAL AGREEMENT FROM SITE
MEETING ON 22/06/11

EXISTING SIDE ENTRY PIT TO BE MODIFIED.
MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

Ni)) \\> ~~

   
 
 
 
    
    
    
   
   

PATTIE é
MATCH EXISTING PAVEMENT LEVEL &

 

 

fs
A
a
~ VW
~ MATCH EXISTING PAVEMENT
LEVEL & GEOMETRY
2 a i, )
PN \ ) /
.00 N ! A
S
Ves
aS wf | de Le
SY (MATCH EXISTING PAVEMENT.
{ “LEVEL & GEOMETRY a
~ MLSS —-
ep NER ; <%

  

Zs

A MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL

/

| -\_- PROPOSED BUNNINGS SITE

 

 

$P211687

“Z-RETAINING WALL. DESIGN BY OTHERS
REFER STRUCTURAL DRAWING
4400-01 RO1 FOR DETAIL

=€P3

 
 
    

¢

 

80

    
  
 
  
  
  
 
   
    
     

 

 

 

 

 

 

 

   
   

 

 
  
 
     

 

Metal storage sheds

SRN

f

26
SP151406

 

2
SP131406

 

SPN *
x we

Metal storage sheds

7
RP1355064

Street Sign

 

RRR

 

f

 

 

 

 

 

 

 

 
 

o ‘6 gro? :
se an

MEDIAN KERB TAPER TO MATCH
BACK TO EXTENT OF WORKS

 

 

 

 

 

 

 

 

 

 

 

 

Ta

 

 

 

 

 

RP222164

  
  
    

 

NEW KERB TO MEDIAN TO MATCH

    
 

A EXISTING
0
BUP 13364
foe EXISTING PAVEMENT ALONG 7
EDGE OF NEW KERB & CHANNEL, ne (03723 1 nae
DEE BUP13364
LE Zope RP 131576
co" LEGEND - PROPOSED WORKS
=== DESIGN KERB CHANNEL LEGEND - EXISTING CONDITIONS

2

 

—— KERB & CHANNEL TO BE REMOVED
g GLecTRiciTy TELSTRA
PIT PIT

 

 

 

 

 

 

 

 

 

 

 

   
  
 

 

 

 

 

 

 

 

CONCRETE PAD SUITABLE FOR A = BERB & CHANNEL "TO BE REMAIN ELECTRICITY
TELSTRA
ff COUNCIL VEHICLE. REFER LANDSCAPE SE ny MANHOLE
hk — ARHITECTS DRAWINGS FOR LOCATION. SEBS EXTENT OF PROPOSED FOOTPATH  piLLaR TELSTRA
506 : SS Bouee PILLAR
= XISTING KERB ISLAND POLE TELSTRA
SP114181 oe TO BE REMOVED EXTENT OF ASPHALT PAVEMENT TO BE LIGHT © MARKER
a ey CONFIRMED WITH CBR & EXISTING POLE o FENCE
fee PA ENT TESTING ® ELectRIcITY
RELOCATED WATER MAIN (IN ACCORDANCE SEWER «TREE FIRE
E2000 Sas KERB ISLAND WITH INDICATIVE UNITYWATER PLAN) - TO BE © MANHOLE ; ® HYDRANT
MEA \ E REMOVED CONFIRMED WITH UNITY WATER @ NNspectION @ SHRUB water
] Se BUDM0109 eee PALM MARKER
a ae J jg s LIGHT 7 TREE © BOLLARD
2 t otf EXTENT OF BIKE LANE LINEMARKING y 1
awl RAFFIC BENCH
oO | ? \ @ SIGN “Sw SSIGN A MARK
= z i /
2 eo — S << LINEMARKING
= i  P307631 = ———————— SUBJECT LOT BOUNDARY
Q a Zs es —————__ ADJOINING BOUNDARY
= : : can NO OVERHEAD POWER LINE
a e St vy D\ —eenemomemememenee UNDERGROUND POWER CABLE
5 ee as N 910 2 GAS LINE
S . SEWER LINE
——————_ STORMWATER LINE
& RP 150347 RP150347 STORMWATER EI
DN eee eT Oe er F*"T“€e NRK RVR Na OPTICAL FIBRE CABLE
\ —————_ WATER RETIC
EDGE OF VEGETATION
CENTRE-LINE OF GULLY
CHANGE OF GRADE
TOP OF BANK
BOTTOM OF BANK
19 FENCE LINE
3 SSS WALL
TRANSITION NEW KERB ——————_ EDGE OF BITUMEN
ALIGNMENT TO MATCH RP150347 IL OF KERB
EXISTING KERB ALIGNMENT 902 RP150347 cOMRETE
on PAVING
RP 150345 ~
\ >
\
\ P5 5S
ISSUE ISSUED FOR DATE | DRAWN | APPROVED [ISSUE ISSUED FOR DATE | DRAWN | APPROVED | DESIGNED: G MANSELL DATE: 19/01/11 GHENT: EROJECT —_—__ Nogr!
ss — i H. TROON PTY. LTD. | PROPOSED BUNNINGS ee
02. | KERB ALIGNMENT MODIFIED, ISSUED TO ENERGEX | 08/04/11] S.M SURVEY: SHEET SIZE a4 TGM GROUP Pty Ltd Bola . : .
Ballarat ALUMINIUM AND STEEL FABRIGATORS DRAWING TITLE:
03 | KERB ALIGNMENT MODIFIED, RE-ISSUED TO ENERGEX | 20/04/11] SM. CHECKED: |APEROVED: _ als Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL WAREHOUSE PROPOSED ROUNDABOUT
~ allarat,
04 | ISSUED FOR APPROVAL 24/06/11] SM Dh: (03) 5330 8888 oo Oe ee Nr tray aay EUMUNDI-NOOSA ROAD
ae valiy ISO 9004 Tel: (03) 5339 2208 - (03) 5339 3622 a
0S | ISSUED FOR APPROVAL 29so1/it] SM mi DATE: Web: tamgroup.com oss ASINZS 4801 Fax: (03) 5338 1310

 

 

 

 

 

 

 

 

 

 

 

 

 

 

() COPYRIGHT T.G.M GROUP PTY. LTD.

 

 

A.B.N. 11 125 568 461

Environment AS/NZS 14001

 

Email: [email protected]

 

PAVEMENT LAYOUT PLAN
NOOSAVILLE, QUEENSLAND

 

TGM REF. No. SHEET:

4400-02-CE

 

 

 

EC2'9

REV:

05

 

 

 

Page 39

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
  
    
  
   
  
 
 
  
    
      
    
   
   

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
  

 

  

 

 

 

 

 

 

 

 

  
   
     

 

 

   
   
  
 
 

      
   
   

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N l |
So "
s
cs NOTE: THE CONSTRUCTION CONTRACTOR IS TO ENSURE THAT ALL EXISTING
STREET SIGNS THAT ARE AFFECTED BY THE EXTERNAL WORKS ARE I
oS TO RE-INSTALLED IN ACCORDANCE WITH COUNCIL ENGINEERING
5 CONSTRUCTION OFFICER
8 CHANGED
O TRAFFIC
CONDITIONS
Ww AHEAD
a NEW
we ROUNDABOUT
AHEAD
NOTE: ALL PROPOSED PATHWAYS ARE 2.0m WIDE AND ARE LOCATED 1.65m
FROM BACK OF PROPOSED KERB UNLESS NOTED OTHERWISE.
REFER SHEETS EC3-EC5 FOR CROSS SECTIONS.
O
a
N
Te
S NOTE: ALL LINEMARKING & RAISED REFLECTIVE PAVEMENT MARKING SHALL
x BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC.
REFER SCRC STANDARD & MUTCD FOR ACTUAL POSITION OF SIGNS ss
= Kx
2 1%
ie Kee
2 xo
S 4
e xo.
xx
Bee
BI
eI
Be
BS
Kee)
BSA ™
&
~
x
an mM
S Z
So
S
SSIES PROPOSED COLOURED (GREEN) er \
SSSR oe rN BIKE LANE - 35m MINIMUM YP
LENGTH FROM INTERSECTION AA
PROPOSED COLOURED (GREEN) B OA
BIKE LANE - 40m MINIMUM Qin A A
LENGTH FROM INTERSECTIO j CHANGED
3, TRAFFIC
ERY = aria
m
NEW
a reaeea
CHANGED ~
TRAFFIC
CONDITIONS. a «
AHEAD
To, w By L xm
a Es PROPOSED COLOURED (GREEN) x
ow Bs BIKE LANE - 85m MINIMUM .
QO BS LENGTH FROM INTERSECTION
> BS
S$ PROPOSED COLOURED (GREEM
BIKE LANE - 55m MNP
LL LENGTH FROMINTERSECTION
x
C1
[ PROPOSED COLOURED (GREEN)
CHANGED BIKE LANE - 40m MINIMUM
TRAFFIC LENGTH FROM INTERSECTION LEGEND - PROPOSED WORKS
CONDITIONS
AHEAD
NEW
ROUNDABOUT 4 SSS DESIGN KERB & CHANNEL
LESH
AHEAD Sy
: x 8 ses]
g eR SEER EXTENT OF PROPOSED FOOTPATH
— Oe :
= : : : EXTENT OF ASPHALT PAVEMENT TO BE
: em CONFIRMED WITH CBR & EXISTING
: a PAVEMENT TESTING
: SE
ea = PROPOSED COLOURED (GREEN)
= : eS BIKE LANE - 35m MINIMUM
a — LENGTHLFROM INTERSECTION a EXTENT OF BIKE LANE LINEMARKING
TBE << LINEMARKING
Pn
< SOS Ss
NE SS y
Itesteceatas RS
Sy PROPOSED COLOURED (GREEN)
BN BIKE LANE - 40m MINIMUM
Re LENGTH FROM INTERSECTION
ey
CHANGED Ry
TRAFFIC WS
CONDITIONS EOL
AHEAD
a \ FOR APPROVAL
ROUNDABOUT
AHEAD .
DESIGNED: DATE: CLIENT: PROJECT:
ISSUE ISSUED FOR DATE | DRAWN | APPROVED fISSUE ISSUED FOR DATE | DRAWN | APPROVED G. MANSELL 19/01/11 NORTI
DRAWN: SCALE: CIVIL DRAWING
01 | ISSUED FOR APPROVAL 24/06/11) S.M. S. MANTERFIELD 1:500
Wai) isSueb Fon APPROVAL soroI tem. SURVEY: SHEET SIZE: a4 TGM GROUP wih BSl a H : T R O O N Pry. LTD ° PROPOSED BU N N l N GS NTE
CHECKED: APPROVED: BUILDERS - COMMERCIAL AND INDUSTRIAL WAR E iH oO U S =
1315 Sturt Street
~ Seas no. ox as, wewounte, 3 COMUNEI:NOGSAROAD PROPOSED LINEMARKING AND
T Ph: (03) 5330 8888 vty 30 9001 Tel: (03) 5339 2208 - (03) 5339 3622 =
DATE: DATE: GM ane: tongue ons Fax: (03) 5338 1310 NOOSAVILLE QUEENSLAND DIM ENSION PLAN
steele EaviennectASINZS. (4 Email: [email protected]
9
©) COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF. No.: 4400 02 CE "ECO OF 9 “02

 

 

 

 

 

Page 40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sewer M/H

 

 

 

 

 

 

 

1ess\,

lid Level RL =

 

 

“RETAINING WALL

 

 

 

 

 

 

 

RETAINING WALL RW1

SCALE 1.200

a
wu
ca
CQ
n
w
Le
a.
2
o
w

    

ANION YON

OTH

N

LE
TO BE CONFIRMED

ON SITE.

NN ACTUA

 

NN

SU

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

—
a
i & Iwi 20 GNI
E53 oso] slif Ovi] vee] evs
-— 5 ee] OCP TEL) VEG 0006
a a ce
ae aso] 40% ose
x
ao OL “az'6i| 00'S
“eee eee
4 “erg f 60°08
3
x
= Se
z ove | aSte
a
a [a _
e ““erel| G0'SE
= arall eee
ee L Qo ed anderen |
2 OSH} —BTT] «OOTY BOG] 90'OL
i
ae a ~ ~ Jee fe
-— oo} Sz} SSL} OGL] OS L9
j
a rs i rT eSel LSE] DOG) 00 S9
es. nan. _ J erennsacseeen — 7 —f ef ee
oo] sszf ays} seer] 059
Qo - “| “oos:| ssz] veR} zee} 009)
Ss
iz
3 ee | “ors! O92] een] Bee] OF1S
2
S ———3. | ene err
2 ez very G9'Ss
Ss
oO
a FR le —— woe}
— ovst|  98z] sar} seat] as‘zs
— ee P ol'sh] 99 eo] FLT ONS]
- Pe POrsiy Teeth eee] ors] OSLA
>
a
are vod — — a a
ws Ors Lez Sé°St svaL} 00's”
3
<=
Ue
cen see cen wee ff
> ory Lz) w'sk} ES} OSz4
2
~ —_— [rs on ors] Bz] ess] Zr'elt oeo4|
a
og} 962] esi] exe] asee
4
= oon] aE, BAP WAL ease
seventeen on 3 Sou he nen an neem fn ener
= i ov] ze] Vea) oui” ose
on co | eae
woe
~ — ornT  yezt eon] ese] os‘ez
~ a Porat ice tsa
Qa
—_——— {——-—n. peer arene eed tee te ere fm --|
-— oat eszp ost soul oszz
a =" . . |
-—— ova VE, CFG Es OL} d00z
we eee nee ere fee ane a &. a wrenend a nyt ce rend ee nme ow we
-— Orel Fey EET 9S
————h one fo fp ef
a over! sez} seat] 62 9if O'S:
~ = are) eet] arn} wap eee
ao 3 | - —
-—— i Orel GOO
ce pe |
-—— { sve] ost) tee, avail ose
©
cen narra nn _—-———. 4 a
ed sve} vt oes
ween ;——-—N. ~ — ef fe ] ] -.
a over] DEL USL] eB] Ose
=
TF , oer] ITY OSE] Say 0
TVA 40 LUVES ve * :
= a
olztletlalta
f & z 5 5 ~ 8
# E;a]2ials
> ¢ e/sie/s)2|2
f 2 > a a a = Ss
\ Y e Ww = ao uw uo
S = 4 3 = x= oS “4
if oa Zz a ~ 2 a z
\ Z/sSs]{[a,]zZz2 3] s
\ = & c ic e =

 

 

 

 

 

 

 

 

 

 

SCAL

420
— NA Ps

a

”

RETAINING WALL ELEVATION RW1

ALE 1200

SC

 

 

 

ISSUED FOR APPROVAL

 

STRUCTURAL DRAWING

‘NoRTI
Oo

80 TITLE:

RETAINING WALL RW1 DETAILS

ORAW

ISSUE: 0. 4

 

SHRET: RO1

 

4400-01

 

IGNREF. No:

 

PROPOSED BUNNINGS

WAREHOUSE

 

EUMUNDI-NOOSA ROAD

NOOSAVILLE
QUEENSLAND

 

 

a
~ 2
YE
mt gs
b+ Be
486
heel 3g
48
bei 58
es
$=
. 8s
<6
Ex 38
5a
fy 28
23
35
7, ws
Z, 8
QO
aR
Os
#8 3
= :
Mm Seek
gRxas
E Agee
ZRES
. sane
a2oR
Suze
may Og EE
5

 

 

Bato _
3 E
5588 26%
PEG? Zan
asl Gee
a2 HL EEE
> of SES
Go S88 eP"r
& “8S ese
oO Deg
= <
6

rE

 

 

APRIL 2011
AS SHOWN

B

DATE:
SCALE:

i

Ze

SHEET S!
DATE:

 

K. BENNETT
T.FINLAYSON

 

  

© 2G 1

 

0A

G) COPYRIGHT TGH GROUP PTY. LT

 

 

 

 

OATE T baaw APPROVED UESSONED:

 

ISSUED FOR

 

 

 

 

| CRAWH [APPROVED] ISSUE

T

DATE
oRcett |

|

120611
3.05.1
25.071

 

g
ws
@| es
&|s
Ble
By

Z

SS,

PRELIMARY DRAWINGS

 

 

ISSUE
a

ea
03
0

 

 

 

 

 

Page 41

 

03

REV:

 

9

EC4"

SHEET:

 

4400-02-CE

 

TGM REF. Nox

 

 

NOTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS.
WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE

MINIMUM COVER.

 

 

 

EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m

FOOTPATH (TYPICAL)
/ -3% —

|
|
~—

I

F

DATUM RL_ 20.0 !
DESIGN

 

20.704
20.875

 

EXISTING LEVEL

21.148 [20.950

21.003 [21.025
21.005 [20.875

21.004 {21.025
21.006 421.006

 

OFFSET

-15.083]20.808 [20.808
-15.029|20.806 120.754
-13.029|20.711

-11.529 {20.569 120.667
-11.419 [20.554 |20.667
-11.079 ]20.553 20.597
-1.645 |20.916 |21.025
-1.580 [20.919 }21.025

-1.805 {20.911
0.000

1.679
1744
1.904
2.035

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CH 94.049

EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m

25% -3% sa

|
|
|
[|
|
|
|
|
|

DATUM RL_ 20.0 d

 

DESIGN

20.906
21.333

 

EXISTING LEVEL

21.224 [21.258
21.087 {21.333
21.088 {21.333
21.090 421.183
21.093 [21.093

 

OFFSET

 

 

 

 

 

 

 

-15.295]20.929 120.929
-15.025]20.909 121.064
~13.025]20.753 121.014
-11.525 |20.592 |20.976
-11.415 [20.575 120.976
-11.075 [20.581

-1.829 [20.991 }21.183
-1.669 [20.998 [21.333

-1.604 [21.001

0.000
1.663
1.128
1.888
2.069

 

 

 

 

 

 

 

 

 

 

 

CH 80.000
EXISTING WATER MAIN

EXISTING WATER MAIN
[es COVER UNDER ROAD 1.2m MINIMUM COVER UNDER ROAD 1.2m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2 2% y= ee oof
DATUM RL 20.0 | 2
infen|]} ee at St Sta [st [St] DO ]O1CO}D hola
DESIGN SIS]E] Seto HIZISINIZa|e oo for on feR [S/S
cfHK]o] Clol|o Sele [|| | DICOlOlK}—
MINI NN NUIANIN SII IN JON IONIC GUANA IAN INN
urln|S] Glieia QIS Isis lele|s RBIOININ
EXISTING LEVEL SOIR) Shela B\A|SIRIS|S|S =Eleles\s
cle ]o] Clol|o DOlK JK JK [eK |e efele fe [Kl
GYAN TN SIAN NINN IN IAIIAIN GUN IN IN IN IN
Ia |
OFFSET wlalm| LISI SIRBISSISks SIRBIRAIS
SYS) S=|S|= HlHl—|e ols jo SIE ISA
tPada tpada PrP pr fol ele J ee ee
EXISTING WATER MAIN EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m MINIMUM COVER UNDER ROAD 1.2m
—_— — — SL 31% —2 8% — ),——
25% Bet yp 25%
DATUM _RL_ 19.0 8 2
DESIGN Rial AL SS | ColealesIe| = Slats PAS eS [oa foe
SIS] ao] Ofolo slololo slolo Slololololo
NIN ON MINN GISION IGN ASIAN GIN IOIONIN ION
Him} co] Ajulio X10 |m In {un tal lun mela lar|m ro
EXISTING LEVEL Rie] Bl RR SERS) sige ARBRE
DIO] S| GDJolo DIolo|o clJ—| Sele l[K lola
SINT NS NIN INS NUNIANIN NISIN GUN IAIN IN IAS
Blin} unt Wluniin
SIS! Sl Figie mimlSlo —|ro}.0 BS\Sieieieh
OFFSET Slal ml alle emis] SIS ATR [bela |™
She S| wilaifai SPIRE
ISSUE ISSUED FOR DATE | DRAWN | APPROVED JISSUE ISSUED FOR DATE | DRAWN | APPROVED] CESIGNEO: G MANSELL DATE: 19/01/11 CLIENT: PROJECT: CIVIL DRAWING
DRAWN: SCALE:
01 | ISSUED FOR INFORMATION 1/0} SM S. MANTERFIELD HOR 1: 200, VER 1:100
02 | ISSUED FOR APPROVAL 26/06/11 SM. SURVEY: _ SHEET SIZE 44 TGM GROUP Pty Ltd ESN H. TROON PTY. LTD. PROPOSED BUNNINGS
CHECKED aDPROVED Ballarat G ALUMINIUM AND STEEL FABRIGATORS WAREHOUSE DRAWING TITLE:
03 | ISSUED FOR APPROVAL 29/07/11] SM. ° & . - 1315 Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL
& ~ ISS no. oox se, wewoutt, 20 EUMUNDI EAST CROSS SECTIONS
Ph: (03) 5330 8888 g.awiso.g0ot Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD
DATE: DATE: Web: tgmgroup.com ons ASINZS 4801 Fax: (03) 5338 1310
A.B.N. 11.125 568 461 EnicnretASINZS 14001 Email: [email protected] NOOSAVILLE, QUEENSLAND
C) COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF. No.: 4400 02 CE “"EC4 oF 9 REV:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 42

 

03

REV:

 

EC5 9

SHEET:

 

 

4400-02-CE

TGM REF. No.:

 

EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m

 

EXISTING WATER MAIN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNDER ROAD 1.2m

EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m

 

 

 

 

— MINIMUM COVER
3.3% 3.3%
\ nee TS 3% gosh) 33%
a SN _
DATUM RL_ 18.0 x
| a+] mie |e ma|mimfoo| mimiar 0 |00 Joo |
\O —_ mir |Oo BOIMIMILN COIN | CO oO |mt Jt [r~
Sar} KK] Alain DIRNIRIN| Kalo Dlx lor lox
Qe} SS] Hefei cfefel[e}| jefe Sle lH le
oOl|— .o} alti olol~l|o ~ rm |un |
Min} MA] BSlialm =I\>t a
EXISTING LEVEL Im) A] Siele Seiele| Sle SSIS [5
ala] Saale e\elele| siele ao} |e
MIa S| olClo
NA, AL AMIS DyjoO|n Sloln|~
OFFSET Se ey Seis Amials| SSS sear
eI] a) sate wlslale| Slaps aleale
! 1 1 ! ! ! 1 ! tio MIO IN i | |
ho 33% 133%
\ 2% = as Sp I
- SS SSS ~
5
DATUM RL_ 18.0 L
DESIGN ~]S) SC} AAI Rjejefes| alate tal
alg] ¢] eigic gie|ele) eigie gle
PIB! MI alailo OInIOlsF} miolst 00 |o.
No QAIiQ|eS a MIN
EXISTING LEVEL =a] &] SIE RJefa]S] 53 es |63 GIS
QI} S} SISIQ ASISIR]} sieje a|e
O(S} 2] o|(Plo olola
OFFSET mis] <6) LSIR Seis] xigis RR
Ro) al aad sd (sc) Alas] SAIe Se
| yim [iA ciled
1 t ! 1 1 1 1 t jo GIN IN —\|—

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m

CO
Oo
>
Oo
Oo

 

   

FOOTPATH (TYPICAL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

OTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS.

WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE

MINIMUM COVER.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

i ee EXISTING WATER MAIN
25% > Le BK MINIMUM COVER UNDER ROAD 1.2m
EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m 338k 33% EXISTING WATER MAIN
— 3% 3.3%
N aa 25%/ 22% 3 3% 7.5% / MINIMUM COVER UNDER ROAD 12m
— ry = =
DATUM RL_15.0 . <
HtIOP OS] NIN C9 JOO|OO Irn] O10 lao © lq a9 |\0 JO
= o|o o|o (LIS
DESIGN mie] S] SIR Blaise] Slee Ao foe IR DATUM RL_17.0
faoe) DIO
alZ] F<} sigie FAIS] SAIS Sejejejz —-| el alele clelolial clelo alslSlesleo
oO ML AIAN Soir} wins WIAA |ia|o
EXISTING LEVEL mlx] S] Rial ANNO] RRR SEIAIR IR X} a] Klar} a|S|sle} sisi Box }os oxox
SIS] SF] aiala SISleSle] alala Bax ]or Joo |r
Sie] B] Sisis SISlKlo} ulelo Slalo lee EXISTING LEVEL ~| SEIS foo |eo|ao] AEN AIRIRIRIN
OFFSET wha] a] Aisle alias} SAR oe a] SIRS e\e\e\e| siecle e\e|e\ele
ft ' ee thr rfol alnln AIA fe S S| o|\Sle SIJOly wt [st Je |
OFFSET * ep IS AIMINIS! m|+t1o SISITISIS
CH 60.000 ES Hse Sale he shes
EXISTING WATER MAIN
~—— ___| MINIMUM COVER UNDER ROAD 1.2m CH 140.000
_ 25% 2.3% EXISTING WATER MAIN EXISTING WATER MAIN
25% ~— — ——_=3% = pS —— 3% 2.5% _/ MINIMUM COVER UNDER ROAD 1.2m MINIMUM COVER UNDER ROAD 1.2m
4 ey __ EXISTING WATER MAIN
™ —
3,39 % MINIMUM COVER UNDER ROAD 1.2m
> 25% > 3 a
=< ee
° N\ =_—_— Oo ° °
~~ 4
—
DATUM RL_ 16.0 DATUM RL_ 17.0
TIS] SO] NININ NIN |] > NINIS MIM | |o [oO C\a SI mlmImM AIM [t) AID] Rn a
DESIGN SIS} &] SIR Sleeis aIF\8 SICK DESIGN tals] SB] Shela HIRIS (S| Kiel a
alc] ¢} eiele glS|s/S SIS|S eieieie\e az} ef] igi eeiele| sels z
sl} wt] SIS po Darla] ro tlolx= ON] lin Colm] st} Sit fis mle—ImIa} m}—|io -
LISIS] eS |e = ~ > Ox
EXISTING LEVEL he} FS] Sisis AINA] Sle|s Rlaleeols EXISTING LEVEL infal MAIS Slalape| oxfelx a
s|o] 3] slolo Slololo slo|o alala laos ojo} S| Solo DBIBIAR|R| Wlax}ox a
NIN NS GNI MII | ON NIN IN — |] [| NIN N NINN [|| —|[—|— =_
olof oS] olelo ole! of olSelo
SIS} 2] Slain Solon MICU Talon NIA} Wy Alt So sjsik N
OFFSET MIA AP Sfoojin QISlalS lala AMS OFFSET impo} se) els Alalale| LISls A
eye} a] ales lala] 2 enjoy iin slog hs los ein) A QA AlAA|e} NI qi
thrift oapafa thiftilo mm jon Sa Ie Ie a ee eee rrp rio} AN |N —
ISSUE ISSUED FOR DATE | DRAWN | APPROVED JISSUE ISSUED FOR DATE | DRAWN | APPROVED] DESIGNED: G MANSELL DATE: 19/01/11 CUENT: PROJECT:
DRAWN: SCALE CIVIL DRAWING
01 | ISSUED FOR INFORMATION 19/01/11] SM S. MANTERFIELD HOR 1:200, VER 1:100
02 | ISSUED FOR APPROVAL 24/06/11] SM SURVEY: SHEET SIZE: 44 TGM GROUP Pty Ltd BSlay H. TROON PTY. LTD. PROPOSED BUNNINGS
— CHECKED: APPROVED - Ballarat ALUMINIUM AND STEEL FABRICATORS WAREH OUSE DRAWING TITLE:
03 | ISSUED FOR APPROVAL avom/] SM. : y y ee 1315 Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL
Susans va. nox os wewouree 22 EUMUNDI! WEST CROSS SECTIONS
Ph: (03) 53308888 a.swig0 9001 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD
DATE: OATE: Web: tgmgroup.com onss ASINZS 4801 Fax: (03) 5338 1310
A.B.N. 11125 568 461 — EntounertASINZS 14001

 

 

 

 

 

 

 

 

 

 

 

 

 

 

©) COPYRIGHT T.G.M GROUP PTY. LTD.

 

Email: [email protected]

NOOSAVILLE, QUEENSLAND

 

 

 

 

TGM REF. No.:

4400-02-CE

 

SHEET:

EC5'9

 

REV:

03

 

 

 

Page 43

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 
  
  
  
  
   
     
   
  
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

   

 

  

 

 

 

 

 

        
    

      
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

   

 

 

 

 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

 

 

Ww
©]|} PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL
= :
M 4858.14 1080.13 11.54 Ft 4.76780 912.84 ME. Gat 4827.69 932.68 19.12 K1 4854.86 1097.24 ME ul 4853.67 1028.17 14.58 M1 4937.63 969.69 20.40
|| a2 4857.27 1068.09 11.89 E2 4179.15 913.82 ME. ® G2 4827.30 931.44 19.32 K2 4854.23 1096.39 ME. L2 4853.77 1028.84 14.52 M2 494356 970.87 20.45
% AB 4856.40 1056.05 12.44 53 4.79050 914.81 ME. @ G3 4828.45, 930.86 19.49 K3 4853.18 1096.58 ME. L3 4854.43 1029.00 14.57 M3 4949.49 969.69 20.45
Cc] | a4 4857.19 1043.80 43.33 El 4801.86 915.79 49.95 @ Gu 4839.25 933.39 19.50 K4 4851.93 1098.42 ME. L& 4857.24 1027.34 14.88 M4 4954.52 966.33 20.61
©] as 4861.28 1032.21 14.53 ES 4813-19 916.78 19.84 ® G5 4850.05 935.91 19.49 K5 4851.59 1100.61 ME. LS 4859.36 1024.86 15.18 MS 4957.88 961.30 20.59
Uy} | 46 4868.34 1022.16 15.16 FG 4824.54 917,76 19.68 G6 4850.77 936.57 19.39 K6 4851.95 1105.48 ME. L6 4864.65 1017.63 16.02 M6 4959.06 955.37 20.66
5 Al 4877.85 1014.39 16.98 E7 1835.89 918-75 49.58 ® G7 4850.58 937.53 19.28 K7 4852.04 1106.96 M.E. u7 4871.09 1011.40 16.86 M7 4957.88 949.63 20.65
a AB 4889.11 1009.49 17.96 Fg 4839.43 919.12 49.55 K8 4852.19 1108.19 ME. L8 4878.49 1006.36 17.61 MB 4954.52 944.41 20.55
Ag 4901.28 1007.81 18.52 E9 4842.96 919.62 19.53 © SETOUT CO-ORDINATES & LEVELS K9 4852.49 1109.40 ME. L9 4886.65 1002.65 18.19 M9 4949.49 941,05 20.51
A10 4920.22 1007.81 18.86 E10 4846.47 920.25 19.52 © NOTE: SETOUT POINTS ARE TO LIP OF KERB K10 4854.53 1115.86 ME. L10 4895.31 1000.38 18.59 M10 4943.56 939.87 20.49
AN 4928.58 1006.70 19.00 EN 4849.95 921.00 19.53 © Kt 4855.19 1116.27 ME, Ln 4904.24 999.61 18.83 M11 4,937.63 941.05 20.48
. . .E. 4916. 61 . . .
a 9030)=««9826 RE po 49s f5 924751983 oe PT No, EASTING NORTHING — RL SST HST ME is asz0)=«« 9980830 My 90924 «$943 BO
Aly 4948.10 991.52 19.42 EtG 4816.03 904.73 19.61 Lu K14 4855.64 1108.90 ME. L14, 4929.24 996.16 19.47 M14 4928.06 955.37 20.40
AMS 4950.21 987.78 19.64 E45 1813.33 904.54 49.68 > Ht 4855.03 944,34 ME. K15 4855.44 1105.23 ME. LS 4934.50 992.06 19.63 M15 4929.24 961.30 20.44
Ud) | ats 4954.68 983.19 20.11 E16 4810.62 904.58 ME. we H2 4862.35 940.27 19.48 L16 4,938.52 986.73 19.80 M16 4932.60 966,33 20.33
Oo ANT 4,960.83 981.42 20.20 E47 4193.88 905.98 ME. O HB 4870.71 940.84 19.47 SETOUT CO-ORDINATES & LEVELS | w 4.939.041 985.15 19.85
ey | 48 4968.28 981.72 20.28 E18 4186.23 906.31 ME. S fe aeons jean tp NOTE: SETOUT POINTS ARE TO LIP OF KERB tne 1940.08 78599 19.88 SETOUT CO-ORDINATES & LEVELS
|| 49 4975.64 982,93 20.41 E19 4778.58 $06.03 ME. Hs 4892.3 347.44 19.59 L19 4940.11 983.42 19.89 NOTE. SETOUT POINTS ARE TO LIP OF KERB
° 21 1989 60 98800 078 a £768.42 20.24 me. S HT 4904.82 952.44 19.73 it tyre sada 1098
eo ' H8 4909.65 956.10 19.83 PT No. EASTING NORTHING = RL : :
A22 5000.57 993.55 20.97 _ F . . 0. L22 4925.53 976.79 19.86
+ A23 501151 999.10 20.89 SETOUT CO-ORDINATES & LEVELS ju H9 4913.88 960.43 19.89 123 4924.58 976.60 19.83
A24 5022.44 1004.65 20.63 NOTE: SETOUT POINTS ARE TO LIP OF KERB <x H10 4917.47 967.20 19.81 N 4852.30 1002.10 . L24 4923.92 977.30 19.80
3 A2S 5033.38 1010.21 H11 4917.97 974.84 19.61 N2 4851 nN 1001 64 . L25 4921.27 983.72 19.57
= || a26 5040.08 1013.49 PT No. EASTING NORTHING = RL O H12 4915.31 982.02 19.35 MS feeno7 toon ’ 126 4916.98 989.17 19.34
= ® H13 4909.94 987.48 18.96 No 4850.08 1002.19 . L27 4911.37 993.26 19.11
—+ SETOUT CO-ORDINATES & LEVELS | » 4161.96 og me taeee, coven feos NS 4849.59 1002.80 - 138 i30t 86 39466 re.
NOTE: SETOUT POINTS ARE TO LIP OF KERB f2 4773.51 32.16 HI6 4883.85 995.29 17.96 "e poten eee, . 130 4,883.18 100106 18.01
F3 4,783.08 912.19 . . . N7 4852.43 1007.57 - ; S .
FA 1186.65 911.73 HIT 4878.00 997.59 17.58 NB igss74 wont - 31 4875.71 4004.57 11.42
PT No. EASTING NORTHING RL re i79081 on121 Ht18 4872.42 1000.50 17.18 No 4856.48 1011.78 . L32 4868.97 1009.15 16.72
6 4:195.00 ott27 49.97 H19 4867.17 1003.97 16.76 N10 188737 1912.10 : 133 4862.93 1014.69 16.00
Bt 5113.93 1038.78 M.E. E7 419799 91152 19.95 H20 4862.64 1005.16 15.68 Nu 4858.22 101169 - L34 4857.19 1021.08 15.30
‘ . , 58.55 1002.89 15.39 ‘ "
B2 5098.96 1031.51 MAE. F8 4814.92 913.87 19.88 Ha 48 N12 4858.58 101130 -
B3 5083.99 1024.23 MAE. F9 4829.02 916.21 19.84 ne teeny eran we NB 4858.90 4010.41 - SETOUT CO-ORDINATES & LEVELS
Ba 5069.03 1016.95 we F10 4830.70 916.52 19.83 - - — N14 4858.50 1009.56 - NOTE: SETOUT POINTS ARE TO LIP OF KERB
BS 5054.06 1009.67 E. FM 4832.37 916.88 19.83 _ N15 4857.77 1008.89 -
Be £039.09 4002.39 Me - een oie 73 SETOUT CO-ORDINATES & LEVELS Nig ere O08 71 ° ©
B7 5024.12 995.12 M.E. FB 4873.94 926.61 19.19 NOTE: SETOUT POINTS ARE TO LIP OF KERB
B8 5013.91 989.95 28 Ftd 4894.72 931.48 19.89 SETOUT CO-ORDINATES & LEVELS
B9 5003.79 984.84 1,22 FAIS 4915.51 936.34 20.10
B10 1,993.68 979.73 21.07 6 1.920% a 215 NOTE: SETOUT POINTS ARE TO LIP OF KERB
Bil 4987.21 976.86 20.89 FAT 4,926.07 938.03 20.21
Bt2 4980.48 974.66 20.71 F18 4926.92 938.67 20.22
B13 4973.56 973.15 20.58 FA9 4926.11 939.71 20.23
B14 4966.52 972.35 20.51 F20 4,923.14 944.78 20.26
B15 4961.67 972.04 20.48 F2i 4921.06 950.62 20.25
B16 4960.81 971.43 20.48 F22 4920.35 951.38 20.24
B17 4960.98 910.39 20.46 F23 4919.21 950.95 20.22
B18 4964.20 965.53 20.45 F24 4913.81 945.99 20.13
B19 4966.09 960.01 20.47 F25 4907.75 941.86 20.03
B20 4966.83 959.24 20.48 F26 4901.14 938.67 19.95
B24 4967.84 959.58 20.48 F27 4894.14 936.48 19.88
B22 4972.29 963.99 20.52 F28 4878.41 932.79 19.83
B23 4977.55 967.39 20.60 F29 4,862.68 929.11 19.80
B24 4988.95 973.16 20.89 F30 4846.96 925.43 _ 19.78
B25 5000.34 978.92 21.15 F34 4831.23 921.75 19.81
B26 5011.74 984.69 21.23 F32 4829.12 921.42 19.81
B27 5025.8 991.81 ME. F33 4828.20 921.15 19.82
B28 5040.48 999.45 ME. F34 4814.17 918.81 19.88
B29 5055.15 1007.09 ME. F35 4197.44 916.49 19.95 Lw
B30 5069.83 1014.74 ME. F36 4782.57 915.25 20.02 >
B31 5084.50 1022.38 M.E. F37 4167.11 914.01 20.08 ~
B32 5099.17 1030.03 M.E. ow
ps3 sas 05767 SETOUT CO-ORDINATES & LEVELS
SETOUT CO-ORDINATES & LEVELS Nove: setout Points ARE To LIP OF KERB 2
NOTE: SETOUT POINTS ARE TO LIP OF KERB = py PT No. EASTING NORTHING RL
PT No. EASTING NORTHING RL Lu or " 4841.65 995.73 ME.
x 2 4844.52 1003.87 15.46
ct 5007.67 972.69 20.95 Oo I. peice ‘oieee 5.41
(2 5001.09 968.83 20.82 +5 016.68 15.17
C3 4994.51 964.98 20.65 Q 5 4850.40 1022.63 14.69
Ch 498753 96113 20.46 _I 16 4847.82 1028.16 14.23
cs 4981.35 957.28 20.27 oO 1 4845.93 1033.98 13.75
ise igh 5 warms
C7 4974.60 950.64 20.17 : : :
C8 4973.00 948.01 20.13
09 4,969.98 941.25 SETOUT CO-ORDINATES & LEVELS
C10 4968.75 933.96 PT No. EASTING NORTHING RL NOTE: SETOUT POINTS ARE TO LIP OF KERB
cn 4969.37 926.59
C12 4971.80 919.60 D1 4,965.04 92159 - PT No. EASTING NORTHING RL
D2 4964.73 920.85 -
SETOUT CO-ORDINATES & LEVELS D3 4963.97 921.07 - yn 4848.25 1053.82 M.E
NOTE: SETOUT POINTS ARE TO LIP OF KERB D4 4960.60 925.63 - J2 4848.30 1054.28 M.E.
DS 4956.64 929.69 - 3 4848.44 1054.73 ME.
D6 4956.44 930.21 - Jk 4851.08 1061.16 M.E.
D7 4956.75 930.67 - JS 4851.78 1061.52 ME,
® neoooctre— 08 4959.02 932.02 - Jé 4852.24 1060.89 ME.
=— @— b9 4961.14 933.57 - J7 4852.07 1058.64 ME.
ag D10 4962.13 933.73 - 38 4852.01 1058.25 M.E.
on 4962.76 932.95 - 39 4851.89 1057.87 ME.
fa b12 4963.64 927.32 - J10 4849.38 4051.75 M.E.
SS ss
@ ® OOO D13 4964.22 924.42 mM 4848.70 1051.39 ME.
NOTE: PEDESTRIAN RAMPS TO BE CONSTRUCTED AT A GRADE OF 1 in 14 AND PROVIDED Jt 4848.22 1051.99 ME.
WITH BLACK COLOURED WARNING TACTILES (300x300x40 CONCRETE PAVER) CAST SETOUT CO-ORDINATES & LEVELS
TN PeRFeTBiAte Caneaine SOINTS WITHIN THE WEBlaNe ASL AMES Must BE NOTE: SETOUT POINTS ARE TO LIP OF KERB SETOUT CO-ORDINATES & LEVELS
CONSTRUCTED AT ROAD SURFACE LEVEL NOTE: SETOUT POINTS ARE TO LIP OF KERB
a y)
| }
i} . a . |
| FOR 1]
| ST | i
i
& a
ISSUE ISSUED FOR DATE | DRAWN | APPROVED ISSUE ISSUED FOR DATE | DRAWN | APPROVED] DESIGNED: ~G MANSELL DATE 19/01/11 CLIENT: PROJECT: NoRT
DRAWN: SCALE: CIVIL DRAWING
01 | ISSUED FOR INFORMATION 19/01/11] SM. S. MANTERFIELD 4:500
02 | ISSUED FOR APPROVAL 24/06/11] SM. SURVEY: SHEET SIZE: 4 4 TGM GROUP Pty Ltd BSlex H. TROON PTY. LTD. PROPOSED BUNNINGS
— TEED. APPROVED p Ballarat © ALUMINIUM AND STEEL FABRIGATORS WAREHOU SE ORAWING TITLE:
03 | ISSUED FOR APPROVAL 29/07/11) S.M. * & ; 1315 Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL
—~ Ballarat, VIC 3350 P.0. BOX 84, WENDOUREE, 3355 EUMUNDI NOOSA ROAD KERB SETO UT CO-ORDINATES
T Ph: (03) 5330 8888 a Tel: (03) 5339 2208 - (03) 5339 3622 -
DATE DATE: G M A BIN 1 t3e oe ae onary Fax: (03) $338 1310 NOOSAVILLE QUEENSLAND AND LEVELS
eBANe Ervirormeet Email: [email protected]
9
(c) COPYRIGHT 7.G.M GROUP PTY. LTO. TGM REF. No.: 4400 02. CE "ECE OF 9 “03

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 44

 

“O4

 

 

 

 

 

a
™~
oO
Us
uu
Q
8
} Se
z —
we ha
STORMWATERER1-EP6 A
\ CH 53\76m
re?) RL. 17/64m
| N
~~ fo Lk
—~. STORMWATEREP2-EP7
GH 98.36m
Yy VERT RL. MQ.44m
N\
—
NK N
~~
a =
oe
IP ELEV = 18.261F STA =83.00 IP ELEY = 12.0SIP} STA =150.00 |
GRADE CHANGE = -0.32
K] =4.79 K =6.54
30m N.C. 50m_V.C.
-3.0% -9.3% -1.6%
DATUM _10.00
CUT + 5 5 x sO a 2 al 2 | 8 5 2 o a on
FILL - 9 7 ¢ 5 4 a a7 a F F F 9 a 3s a
DESIGN TOP OF KERB 2 2 wl al 2 foo
(LEFT SIDE) ca 2 2 2 =| = 4 4
DESIGN PAVEMENT “ ‘A goog as 5) al a 2 a 3 4} 3 %
LEVEL - CENTRELINE & g gy x x Z| 2 o| = | a 4 cs} oc =
DESIGN TOP OF KERB ~ x wl lo =| 2 2 2 a
(RIGHT SIDE) 2 2 e = 4 2 =| = 2 3 =
EXISTING SURFACE o eS x x a of x a] 2 s| 2 ra = on al oon _
LEVEL g x 4 2 4 2 2 a a S a = es} = =
LONGITUDINAL SECTION GATEWAY
HORIZONTAL SCALE 1:500
VERTICAL SCALE 1:50
( | '}
| OR APP |
'e - a J
ISSUE ISSUED FOR pate | oRAWN | APPROVED [ISSUE ISSUED FOR pate | orawN | APPROVED] OESIGNED: G MANSELL DATE: 19/01/11 CLIENT PROJECT
26/06/i| SM, DRAWN: ¢” MANTERFIELD SCALE HOR 1: 500, VER 1:50 CIVIL DRAWING
01 | ISSUED FOR INFORMATION 41 SURVEY: SHEET SIZE: a4 —=. TGM GROUP Pty Ltd 6) H. TROON PTY. LTD. PROPOSED BUNNINGS
Ballarat ALUMINIUM AND STEEL FABRICATORS ORAWING TITLE:
CHECKED: ‘APPROVED: Ge, urt Stree BUILDERS - COMMERCIAL AND INDUSTRIAL
nT @ vo soc e vetoomts 22 WAREHOUSE GATEWAY DRIVE LONGITUDINAL
Ph: (03) 53308888 —ganisocoot Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD
DATE: DATE: Web: tgmgroup.com ‘Hts ASINZS 4801 Fax: (03) 5338 1310 SECTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

() COPYRIGHT T.G.M GROUP PTY. LTD.

 

A.B.N. 11.125 568 461 — Enivonmort ASINZS 14001

Email: [email protected]

 

NOOSAVILLE, QUEENSLAND

 

 

 

 

TGM REF. No.: ‘SHEET:

4400-02-CE

 

EC7'9

 

REV:

01

 

 

Page 45

 

01

REV:

 

9

EC8~

SHEET:

 

4400-02-CE

 

TGM REF. No.:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ot
DATUM 11.00 10.00
3008RCP 3006RCP 300¢RCP 300BRCP RRJ 300RCP RRJ
PIPE SIZE AND GRADE G=10% 1 in 10 G=10.27% 1 in 9.73 G=2.05% 1 in 48.78 G=1.69% 1 in $9.17 G=2% 1 in SO
tANA B/S QS S|S % 3/8 &
|= |= s|o |< = =|- =
DEPTH TO INVERT
a|z RIS SIA xz S ale S
DESIGN INVERT LEVEL = *|> =|2 ele BIE 2 aa o
4 tm 5 g g a S
* wy 3 2° s 3 3
DESIGN SURFACE LEVEL “~ . - © & 2 ~
3 * a & 6 8 B
CHAINAGE & LENGTH “ 30.31 & 20.64 R 18.97 % 52.69 S 16.83 “
— —
i 1
| }
| |
ISSUE ISSUED FOR DATE | DRAWN | APPROVED |ISSUE ISSUED FOR DATE | DRAWN | APPROVED | [ESIGNED: G MANSELL DATE: 19/01/11 CUENT: PROJECT: aaa NoRt
01 | ISSUED FOR APPROVAL 24/06/11] SM. DRAWN: ¢ MANTERFIELD SCALE: HOR 1:500, VER 1:50 CIVIL DRAWING
save FETS TGM GROUP Pty Ltd H. TROON PTY. LTD. | PROPOSED BUNNINGS —_

 

 

 

 

BSI
: Ballarat G ALUMINIUM AND STEEL FABRICATORS DRAWING TITLE:
CHECKED: APPROVED: Ge ~~ oe . BUILDERS - COMMERCIAL AND INDUSTRIAL
, Sut susie © na pox ot, wewoee, 2 WAREHOUSE DRAINAGE LONGITUDINAL SECTIONS
TGM Ph: (03) 5330 8888 aaa 80 901 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD

Web: tgmgroup.com oss AS/NZS 4801 Fax: (03) 5338 1310

A.B.N. 11.125 568 461 emvtonmertAS/NZS 14001 Email: [email protected] NOOSAVILLE, QUEENSLAND —

 

 

 

DATE: DATE:

 

 

 

 

 

 

 

 

 

 

 

() COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF. No.: 4400-02-CE "ECB OF 9 01

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
57.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Plans for approval - Bunnings Warehouse.pdf · 57.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.