Council archive · source document
Amended Plans for approval - Bunnings Warehouse · OPW11/0131
Plans and drawings: the text below has words only, no drawings.
Very large file (57.8 MB): may take a few minutes to open.
Opw a /013 I
TGM Group Pty Ltd Ballarat I Melbourne I Geelong I Ballina
1315 Sturt Street
Ballarat Vic 3350
PO Box 563W
tlYrn'lr^p^^l^l h;^'^
Ballarat West Vic 3350
T 03 5330 8888
F 03 5333 3815
TGM
ABN 11 125 568 461
Our Reference: 4400-02
Development Application No. OPW11/0131
29th July 2011
Attention: Mr. Mark Lewis
Senior Engineering Officer
Sunshine Coast Regional Council
Locked Bag 72,
Sunshine Coast Mail Centre 4560
RE: Proposed Bunnings Warehouse - External Works
- Development Permit for Electrical, Roadwork's & Landscaping
-_178 Eumundi Road, Noosaville Queensland 4566
Dear Mark
Further to the draft conditions of the Development Approval for the external works;
OPW11/0131 we are pleased to provide four (4) copies of the amended final design
drawings and additional information for your approval.
We consider that these final documents indicate the specified amendments as listed and
therefore request that the relevant approvals be provided to enable a pre-start meeting
for the external works to be arranged.
Four (4) copies of the following updated detailed engineering design documentation
have been provided:
4400-02 Sheet EC 1 of 9 Rev 02 General Notes & Drawing Index
4400-02 Sheet EC 2 of 9 Rev 05 Proposed Roundabout Pavement Layout Plan
4400-02 Sheet EC 3 of 9 Rev 03 Gateway Drive Cross Sections
4400-02 Sheet EC 4 of 9 Rev 03 Eumundi East Cross Sections
4400-02 Sheet EC 5 of 9 Rev 03 Eumundi West Cross Sections
4400-02 Sheet EC 6 of 9 Rev 03 Kerb Set-out Co-Ordinates
4400-02 Sheet EC 7 of 9 Rev 01 Gateway Drive Longitudinal Section
4400-02 Sheet EC 8 of 9 Rev 01 Drainage Longitudinal Sections
4400-02 Sheet EC 9 of 9 Rev 02 Linemarking Plan
In accordance with the individual requirements of the Development Approval we advise
in detail as follows:
Prior to Commencement of Construction
1. Acknowledged
2. Will be provided as part of pre-start meeting
3. Drawings amended to include requested details. Barriers are not required as
the retaining wall is located outside of the minimum required `clear zone' in
accordance with Section 7.6 of the Road Planning Design Manual.
LS iiOa
IBox. c^,sa^ ^ l t0 ^(.. www.tgmgroup.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 44 pages
Page 2
4. a) & b) Drawings amended to include revised details as discussed and agreed on
site on the 28/7/2011
5. Drawings amended to include requested details
6. a) - e) Drawings amended to include requested details. We note that the kerb
channel forms part of the 1.50m bike lane width
7. To be provided within (ten) 10 working days after pre-start meeting as
agreed on the 28/7/2011
8. a) - d) Drawings amended to include requested details
9. a) - k) To be provided within (ten) 10 working days after pre-start meeting as
agreed on the 28/7/2011
Conduct a Combined Engineering & Landscaping/Revegetation Prestart
meeting
10. Will be provided as part of pre-start meeting
11. Acknowledged
12. The Principal Contractor is H. Troon Pty Ltd.
The Sub-Contractor for the external works will be Blacklaw Civil Contractors
The anticipated construction commencement date is the 8th August 2011
13. Noted
14. a) - f) A copy Blacklaw Civil Contractors CMP and EMP is attached
15. Acknowledged
16. Noted. All amended drawings are submitted (attached) for approval
Water & Sewerage
17. Acknowledged
18. Noted. The submitted (attached) drawings indicate the specified replacement
works
19. Noted and an annotation has been added to the amended drawings
submitted (attached) for approval
20. Noted, to be provided by Blacklaw Civil Contractors directly to Unitywater
21. Acknowledged
Other
24. Signage added to amended plans
31. Note added to amended drawings
If you have any queries or wish to further discuss the proposal please don't hesitate to
contact me on (03) 5330 8888.
Yours faithfully
TGM GROUP PTY LTD
Ballarat Office
Per:
DARREN J"TRIGG
Director
-B^ Civil, MIE Aust., CP Eng,
Page 3
BLACKLAW
CIVIL CONTRACTORS
Environmental
Management Plan
(EMP)
Noosa Bunnings
[OCR of page images]
@ BLACKLAW
~~ CIVIL CONTRACTORS
Environmental
Management Plan
(EMP)
Noosa Bunnings
Page 4
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Table of Contents
1.0 INTRODUCTION ..........................................................................................................2
1.1 PROJECT DESCRIPTION ...........................................................................................2
1.2 OBJECTIVES OF THE EMP ........................................................................................2
2.0 PLANNING ..................................................................................................................3
2.1 ENVIRONMENTAL RESPONSIBILITIES AND CONTACT NUMBERS ......................3
2.2 LEGISLATIVE REQUIREMENTS ................................................................................3
2.3 APPROVALS, LICENSES AND PERMITS ..................................................................3
3.0 IMPLEMENTATION .....................................................................................................4
3.1 ENVIRONMENTAL PROTECTION REQUIREMENTS ................................................4
3.2 WORKING HOURS ......................................................................................................4
3.3 NON-CONFORMANCE CONTROL .............................................................................4
3.4 COMMUNICATION AND COMPLAINTS PROCEDURE .............................................5
3.4.1 COMMUNICATION ..........................................................................................5
3.4.2 COMPLAINTS MANAGEMENT .......................................................................5
3.5 EMERGENCY RESPONSE PROCEDURES ...............................................................5
3.6 ENVIRONMENTAL TRAINING ....................................................................................7
3.7 ENVIRONMENTAL PERFORMANCE MONITORING .................................................7
4.0 APPENDIX A: PROJECT & EMERGENCY CONTACT NUMBERS ...........................8
5.0 APPENDIX B: ENVIRONMENTAL PROTECTION MEASURES ................................9
5.1 ACCESS & TRAFFIC MANAGEMENT ........................................................................9
5.2 ACCIDENTAL SPILLS MANAGEMENT ....................................................................10
5.2 AIR QUALITY .............................................................................................................11
5.2 FIRE CONTROL ........................................................................................................12
5.2 FUELS & CHEMICALS ..............................................................................................13
5.2 NOISE & VIBRATION ................................................................................................14
5.2 PLANT & EQUIPMENT ..............................................................................................15
5.2 WASTE MANAGEMENT ............................................................................................16
5.2 SITE WORKING AREA ..............................................................................................17
3.2 STOCKPILE SITES ....................................................................................................18
3.2 WATER QUALITY ......................................................................................................19
Document No )MS-EMP-u' Authorised by Blacklaw Civil Contractors Head Office Telephone :- a o
Date ar, Raun) ABN 77 106 750 724 100 Sandalwood Lare Facsimile ". 9
Version Author Forest Glen OLD 4556 office@blacklawcsvil com au
Next Review _a, arv 20'
Page 1 of 20
Page 5
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
1.0 INTRODUCTION
This Environmental Management Plan (EMP) has been prepared for the Noosa Bunnings.
The EMP is the essential link between environmental impacts assessment and project
activities. It is to ensure that environmental impacts identified during the assessment stage
are properly managed on site and control measures are implemented.
1.1 PROJECT DESCRIPTION
The works are located on Gateway Dr and Eumundi-Noosa Rd, Noosaville in the local
government area of the Sunshine Coast Regional Council.
The works comprises the building of the Noosa Bunnings store, as well as reconfiguration of
the Rene St round-a-bout and Gateway Drive entrance. The works are shown and described
in the Drawings (attached in the appendices), and will be constructed in accordance with the
requirements set out in the Drawings and specifications provided with the design
documentation.
The main activities to be carried out during the project are:
• Bulk Earthworks
• Round-a-bout Roadworks
1.2 OBJECTIVES OF THE ENVIRONMENTAL MANAGEMENT PLAN
The EMP outlines the environmental controls applying to the pre-works, during works and
post works activities associated with the Project. It has been developed based on
information for hte site provided by the client and general environmental requirements which
apply to most construction projects and also incorporates project specific environmental
sensitive work practices.
The general objectives of this EMP include to:
• Reduce or eliminate the release of pollutants to the environment;
• Reduce waste and resource depletion by utilising recycling principles where practical;
• Document all environmental management activities, including verification and
corrective actions;
• Implement and effective program for monitoring of environmental issues relating to
the Contractor's role in the project;
• Promote environmental awareness among employees;
• Support ecologically sustainable development;
• Protect and enhance the aesthetic environment;
• Minimise impacts on the local community during works;
The EMP is a working document to be updated as necessary.
Document No: OMS-EMP-C • Authonsed by Blacklaw Cwd Contractors Head Office Telephone 2 '300
Date _z a^ 20'1 aqe 'eat "I" Raun) ABN 77 106 50 724 100 Sandalwood Lane Facsimile -
Vernon: Author Forest Glen OLD 4556 office@blacklawcaalcomau
Next Review.:. a' 20' _ ' a <: ,`arrant
Page 2 of 20
Page 6
BLACKLAW
1411( CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
2.0 PLANNING
2.1 ENVIRONMENTAL RESPONSIBILITIES AND CONTACT NUMBERS
The person with primary responsibility for implementing the EMP, monitoring its
effectiveness and rectifying any deficiencies is the Contractor. He/she can delegate some
responsibilities to other members of the team.
The Project delivery team contact numbers and emergency contact numbers are detail in
Appendix A.
2.2 LEGISLATIVE REQUIREMENTS
All activities carried out on the site and in relation to the Project shall comply with the
relevant provisions of all legislation (including Regulations) relating to the construction and
operation of the Project.
2.3 APPROVALS, LICENSES AND PERMITS
The Contractor will ensure that any approvals, licenses or permits as required are obtained
before works commence.
Document No: OMS-EMP-Ot Authorised by Blacklaw CNii Contractors Head Office Telephone 54•t2 3300
Date: -ar,ar; 2011 va•c qP °e^t pans Raun.; ABN 77 106 750 724 100 Sandalwood Lane Facsimile 44 ' s9g
Version ' Author Forest Glen OLD 4555 [email protected]
Next Review ','&a 7ba•'en1
Page 3 of 20
Page 7
BLA CKLA W
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
3.0 IMPLEMENTATION
3.1 ENVIRONMENTAL PROTECTION REQUIREMENTS
In general, all activities carried out on the site will comply with the relevant provisions of all
legislation for the construction of this Project.
The environmental issues identified as requiring planning and control measures during the
delivery of the project construction are detailed in Appendix B. They cover three distinct
phases of activity in accordance with the sequence of operations. These are requirements;
• Prior to construction;
• During construction and
• Post construction (but not including operation).
3.2 WORKING HOURS
Working hours shall be lam to 6pm Monday to Friday and lam to 5pm on Saturdays.
Works outside these hours will require written approval from the Client and nearby residents
and businesses will be advised of changed hours.
3.3 NON-CONFORMANCE CONTROL, CORRECTIVE AND PREVENTIVE ACTION
A non-conformance occurs when a procedure or environmental safeguard is not followed, or
does not perform as required by this EMP. The Superintendent will monitor non-
conformances to the EMP and initiate a corrective and preventative action where required.
Non-conformance is reported in the relevant form.
Document No. QMS-EMP-J' Authonsed by B!acklaw Civil Contractors Head Office Telephone : 5447 33 CC
Date a .,aw 20t t a-s :?",I, ^.FN '7 ?05' 5C -24 100 Sandalwood lane Facsimile 5 ^443 3397
Version Author ' Forest Glen OLD 4556 office@blacklawci%nl.com.au
NextRevew _ar„ary20'.
Page 4 of 20
Page 8
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
141t
3.4 COMMUNICATION AND COMPLAINTS PROCEDURE
3.4.1 COMMUNICATION
The works Supervisor is the contact point to deal with all environmental issues and
emergencies. He or she is responsible for ensureing all such issues are resolved. Work
team members must notify the Work Supervisor of any environmental issues on site.
The Works Supervisor has been nominated to be available to relevant external authorities on
a 24-hour basis. He/she has the authority to take any action on site as directed by an
authorised officer of any relevant external authority. (See Appendix A for the 24-hour contact
numbers).
All relevant authorities, affected property owners and others in the vicinity or affected by
specific works will be informed of the project, activity and timeframes.
Emerging environmental issues on site are discussed and consulted through regular Toolbox
meetings. A suitable form for recording toolbox-meeting outcomes is provided in the
appendices of this document. These records are retained as project records.
Inquiries about the works from external parties will be recorded on the Communication
Register.
3.4.2 COMPLAINTS MANAGEMENT
Any complaints which concern any aspect of the project are recorded and investigated (form
QMS-POL-10). A Complaints Report will be maintained. The Complaints Report shows the
details and nature of the complaint, the complainant, the date and actions taken as a result
of the investigation.
If an environmental complaint (such as a complaint regarding noise or pollution) is received,
a written report will be prepared and given to the clients' representative within one working
day. This report includes details of the complaint, action taken to correct the problem and
proposed measures to prevent the occurrence of a similar incident.
3.5 EMERGENCY RESPONSE PROCEDURES
All environmental incidents are dealt with promptly to minimise any potential impacts.
Unexpected or accidental environmental incidents will be managed in accordance with the
sites' incident response and reporting procedures. All environmental incidents are reported
using the relevant form.
Likely emergencies and incidents may involve;
• Fuel or chemical spills;
• Unlicensed discharge of pollutants to environment (air, water, noise, soil);
• Dumping of waste to an unauthorised site.
The Works Supervisor on site is responsible for undertaking the incident response according
to the procedure.
Document No: OMS-EMP 0' Authorised by Blacklaw Civil Contractors Head Office Telephone 5 =3 ; :;r
Date ^a ..a^ 1arager ?n are Raun) ABN 77 106 750 724 100 Sandalwood Lane Facsimile
Version: Author: Forest Glen OLD 4555 [email protected] au
Next Review ...':ar1 2012 Cray, r\er'ent
Page 5 of 20
Page 9
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings 14 ike
Any incidents on site, which are likely to cause material harm to the environment, will be
immediately reported to the Client's Representative.
The DERM (Department of Environment and Resource Management) will be notified of
pollution incidents on or around the site which have occurred in the course of the works, in
the following instances;
• The actual or potential harm to the health or safety of human beings or ecosystem is
not trivial;
• The actual or potential loss or property damage (including clean up costs) associated
with a pollution incident exceeds $10,000.
Emergency contact numbers (refer to Appendix A) will be displayed at the work sites.
Procedure in case of any incident
• First check that you are not in danger yourself.
• Notify your works Supervisor or most senior management person on site immediately
• The works Supervisor or most senior management person handles the emergency
according to company procedures
Procedure in case of fire
• Warn & rescue any person in immediate danger - only if safe to do so!
• Call the Fire Brigade on 000
• Extinguish the fire using the right fire extinguisher if safe to do so
• Evacuate to the emergency assembly area if directed or in danger
• Remain at assembly area and ensure everybody is accounted for
Procedure in case of chemical spill
Spill on the worksite are most likely to be hydraulic oil or engine oil spilled from plant items. If
a spillage occurs the following procedure is to be followed:
• Immediately identify the spilled material and notify the works supervisor.
Subcontractors are to notify the Principal Contractors site representative.
• Contain the spill as soon as possible so it doesn't spread. Refer to MSDS for
personal protective clothing needed.
• If containment is required, contain using earth mound and/or absorbent socks/spill
kit. If you can't do this let your supervisor know.
• Use the relevant clean up procedure as instructed by the MSDS.
• Once the spill has been contained, your supervisor will arrange removal and disposal
as soon as possible. Dispose of material using a licensed contractor and keep
records of disposal on site.
• Complete and Incident Report Form and forward it to the Project Manager.
Document No: QMS-EMP !;' Authorised by: Biacklaw Civil Contractors Head Office Telephone ;av
Date ,:a r.,ary 2011 a ;,,1-•e1i (Hans Raun) ABN 77 106 750 724 100 Sandalwood Lare Facsimile a
Version Author Forest Glen QLD 4556 office@blacklawcivil com au
Next Review:laci.rarv 201 1 --a n'Narrenl
Page 6 of 20
Page 10
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
3.6 ENVIRONMENTAL TRAINING
All project personnel (including subcontractors) receive site induction training which covers;
• Emergency and response procedures on site;
• Environmental Awareness of their environmental protection responsibilities and
measures to minimise environmental impacts;
• Environmental protection requirements of the site as set out in this EMP.
Informal training through toolbox meetings is also delivered when required in topic such as
erosion and sedimentation control, protection of heritage items, protection of native
vegetation and other environment issues relevant to the site.
3.7 ENVIRONMENTAL PERFORMANCE MONITORING
To demonstrate compliance with the EMP, the Works Supervisor conducts weekly and after
rain environmental controls implemented on site. Any actions resulting from the inspections
are promptly resolved.
The Project Manager ensures that environmental performance is evaluated on a regular
basis and includes a review of inspections records, complaints/enquires received, waste
generated/disposed, incidents and other environmental issues.
Document No: OMS-EMP- Authorised by Blacklaw Civil Contractors Head Office Telephone 5-1, 33^0
Date .ar.,arv 2011 a,e e t -a •s Raun.) ABN 77 106 750 724 100 Sandalwood Lane Facsimile 33"+9
Version ' Author Forest Gien OLD 4556 office@blacklawcnnl com au
Next Review arv 20' .= a `Aa-renl
Page 7 of 20
Page 11
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP) 144
Noosa Bunnings
APPENDIX A: PROJECT AND EMERGENCY CONTACT NUMBERS
NOOSA BUNNINGS
CONTACT TELEPHONE NUMBERS.
Supervisors
Hans Raun
0400 663 550
Construction Manager
Ray Campbell
0438 744 596
Site Foreman/first aid
WHSO (Health & Safety)
Craig Warren 0400 600 915
Closest Medical Centre
Stobbs Peter Dr 5449 7600
102/90 Goodchap St, Noosaville Q 4566 7AM - 5PM
Emergency Services
Ambulance 000
Fire Brigade 000
Police 000
Mobile Phone (All emergencies; if locked) 112
Poisons Information Centre 13 1126
Energex - Loss of Power / Accidents 13 6262
Dial Before You Dig 1100
Workplace Health and Safety Nambour 5470 8855
Document No: OMS•EMP-o, Authorised by Blacelaw Civil Contractors Head Office Telephone i 5442 3300
Date . a, . any 201' np, ,,^„ , •ent Hans Raun) ABN 77 106 750 724 100 Sandalwood Lane Facsimile 5442 3399
Version ' Author Forest Glen OLD 4555 office®blacklawcivil.comau
Next Review `rr:arv 20' a;n Narrenl
Page 8 of 20
Page 12
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP) 141
Noosa Bunnings
APPENDIX B: ENVIRONMENTAL PROTECTION MEASURES
Note: 'Evidence of action' means records of the implementation of safeguards: where
appropriate refer to other checklists or documents. For simple, once-only actions, the
Evidence column may be initialled and dated
sar^r-PSC am anagement
Pre-works phase
The directly affected residents will be informed of temporary vehicle access
arrangements, at least five (5) days in advance where practical to do so.
Temporary advisory signs will be erected to inform gym & industrial access
users of changed conditions.
Works phase
Alternative access will be maintained at all times to existing beach users and
any affected businesses.
Post-works phase
All temporary traffic signs will be removes and, where appropriate, new
permanent signs erected.
Document No: OMS-EMP-:;' Authorised by Blackiaw Civil Contractors Head Office Telephone : ' i 5442 3300
Date . i .,ar; 201, a .:;e ^.r l ^a•s Raun) ABN 77 106 750 724 100 Sandalwood Lane Facsimile 5442 3399
Version ' Author Forest Glen OLD 4556 [email protected]
Next Review: 1ar.:ary 201 C a q'tia,ren)
Page 9o120
Page 13
BLACKLAW
1411( CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Pre-works phase
Ensure that on-site spill containment equipment/kits are available at
construction work sites where materials such as fuels, chemicals, paints or any
other liquids are used.
Ensure relevant Material Safety Data Sheets (MSDS) are available on-site for
all chemicals used or stored on site.
Works phase
In the event of spillage of hydrocarbon products such as fuels and/or
chemicals, on-site spill containment equipment/kits should be used to contain
spills and cleaned in accordance with the MSDS requirements.
All nearby drainage channels will be protected with sandbags
All incidents will be immediately notified to the client's Project Manager and
Environmental Manager.
Post-works phase
Nil
Document No: OMS-EMP.: Authorised by Blackiaw C:v,l Contractors Head Office Telephone 544_ 32Cc
Date ary 2011 ge-^ rr Fans Par,ri AEN 77 106 750 724 100 Sandalwood Lane Facsimile
Version Author Forest Glen QLD 4556 office®blacklawcrvil.com.au
Next Review ; v, ,.vy 20' a;q Ne•2a1
Page 10 of 20
Page 14
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
144
Works phase
Materials transported in open trucks will be covered to prevent generation of
dust.
The tailgates of all vehicles transporting material from the site will be securely
fixed prior to loading and immediately after unloading.
Exhaust systems and engines for plant/equipment will be maintained
according to the manufacturers' specifications and regularly monitored to
ensure that exhaust emission are satisfactory (smoke for no longer than 10
seconds). Periodic visual checks will be made on exhaust system emissions.
Post-works phase
Nil
Document No. QMS•EMP-0 Authorised by Blacklaw Evil Contractors Head OThce Telephone 300
Date ar ary 2011 ^t i ,x)e „e n r l-ar.s Raun) ABN 77 106 750 724 00 Sandalwood Lane Facsimile a' •;: `9
Version Author Forest Glen OLD 4555 [email protected] au
Next Review IN•Y L;vy 20 ':F- '' eic *arren)
Page 11 of 20
Page 15
BLACKLAW
CIVIL CON7RACTOws
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Fire C I
Works phase
One general-purpose fire extinguisher and one fire extinguisher suitable for
control of oil/petrol fire will be available on site at all times.
A minimum of one person on site will be familiar or trained in the use of fire-
fighting equipment.
All flammable materials will be kept in a locked area within the site working
area.
Document No:OMS-EMP 0 1 Authorised by Blacklaw Civil Contractors Head Off i ce Telephone 44---_
Date are.a^i 2011 iP;-,o„ -,-_3 Raun) ABN 77 106 750 724 100 Sandalwood Lare Facsimile 7^4
Version Author Forest Glen QLD 4556 [email protected]
Next Review rv 20' a o " -en I
Page 12 of 20
Page 16
00BLACKLAW
N* C/V/L CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Works phase
Where fuel, oil of other chemicals are to be stored on site, a secure, lockable
and floored area will be provided before any of these substances are accepted
on site. This area will be imperviously bunded with a capacity to contain not
less than 110% of the volume of the largest container, in compliance with
WorkCover requirements.
Fuel, oil and chemicals will be used in a bunded area
A 50-litre container of spill absorbent will be retained within the site working
area to be used for emergency spills of fuel, oil or other chemicals.
Ensure that any spills or accidents on site that are likely to cause pollution are
managed as per this plan
Document No: QMS-EMP-G Authorised by: Blacklaw Civil Contractors Head Office Telephone X44; ;aOC
Date ,a,_ar•i 2011 J;i - F, •en! rHans Raun) ABN 77 106 750 724 100 Sandalwood Lane Facsimile 4;,. 3:,99
Version Author: Forest Glen OLD 45Z-6 office@blacklawcivil com.au
Next Review .1am.arv 20'Z f_ rain Warren)
Page 13 of 20
Page 17
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
noise ano v fora
Pre-works phase
The surrounding and adjoining facilities and businesses will be informed of
working hours and the level and duration of noise to be expected during
construction
Works phase
Construction noise is to be confined to 7am and 6pm Monday to Friday and
7am to 5pm on Saturdays. No work will be undertaken on Sundays or Public
Holidays
Noise mitigation measures if required will be implemented during construction
to ameliorate the effects of construction noise. Noise generated from
construction, maintenance or demolition of a building or other structure at an
airport should not exceed 75 dB(A), measure at the site of the nearest
sensitive receptor
Post-works phase
Nil
Document No CMS-EMP-01 Authonsed by Biack:an• Civ i Contractors Head Office Telephone _ ; 33^0
Date _ ..a ;: 3^,t a .rqr, --a - s Raun7 A8N '24 t00 Sandalwood Lane Facsimile
Version Author Forest Glen OLD 4556 office@blacklawcnnl com au
Next Review a^r 20,= -- a,c 1.3r•en)
Page 14 of 20
Page 18
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Mn1 d"U
Works phase
All plant/equipment operators and employees will be instructed to confine
operations to within the clearly marked area of site operations
All machinery will be secured against vandalism outside of working hours
All plant/equipment will be inspected daily to avoid leakage of fuel, oil or
hydraulic fluid to the worksite. Machinery found to be leaking should be
repaired or replaced.
Post-works phase
Nil
Document No: QMS-EMP-C Authorised by Biack!aw Civil Contractors read Office Telephone 5442 3 0
Date w.,ary 201' Mr i.,qe rent (Hans Raun) ABN 77 '06 750 7,14 1 0,1, Sandalwood Lane Facsimile 442 3
Version I Author - :•est Glen OLD 4556 office@blacklawcivil com au
R
Nex t evi ew: J anuary 20 ' : ' ; - aiq W arren)
Page 15 of 20
Page 19
BLACKLAW
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
14(
Works phase
Should any Acid Sulphate material or any contaminated soil be discovered it
will be classified and disposed of to a legally operating waste management
facility. Records of disposed waste will be kept in project records
Waste material generated by the works will be minimised or recycled where
feasible and cost effective.
All waste material that cannot be recycled will be collected and removed from
the site to be disposed of in a legal manner, i.e. at a legally operating waste
management facility. A register of disposed waste will be kept on site.
Bins with heavy lids will be provided within the site compound for personal
litter.
Bin lids will be kept closed at all times, and all bins will be emptied when they
are three-quarters full.
A daily inspection will be carried out to ensure the worksite is left in a rubbish
free state.
All loads of rubbish will be securely covered to prevent spillage during removal
No waste is to be burnt or buried on site.
Post-works phase
The worksite will be left in a tidy and rubbish free state upon completion of the
project.
Document No: QMS-EMP-C' Authonsed by Blacklaw Civil Contractors Head Office Telephone 5442 3300
Date _a^ ary 2C11 a ,4e^•e^' -ans Raun) ASN 77 106 750 724 100 Sandalwood Lace Facsimile , 7 5442 3399
Version Author Forest Glen OLD 455E [email protected]
Next Review -s"_arv20'- '.:a, Tia«Qnl
Page 16 of 20
Page 20
BLACKLAW
141, CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
•1^:^III^I_^^f^:
Pre-works phase
The site compound will include amenity sheds, portable toilets, and plant and
equipment storage area.
The site compound will be protected from theft and vandalism using security
fencing. All equipment that could be damaged or stolen is to be stored in teh
secured compound.
Environmental safeguards will be established at the site compound as outlined
in previous sections
Post-works phase
The compound site will be left in a tidy and rubbish free state upon completion
of the project
Document No: QMS-EMP-0 Authonsed by Btacklaw Civil Contractors Head Office Telephone 5442 3300
Date a•-.:ary 2017 Va 3ge ^e: •-'a••s Raun) ABN 77 106 750 724 100 Sandalwood Lane Facsimile =442 3399
Verson ' Author Forest Glen OLD 4555 [email protected]
Next Review: ,anuary 20'. arz; t.arren)
Page 17 of 20
Page 21
BLA CKLA W
CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Pre-works phase
Site works will not start until the erosion and sediment control works outlined
below, are installed and functional;
• Measures are in place; appropriate to the works being completed (Silt
socks in kerb/gutter, silt fencing etc)
• The entry to and departure of vehicles from the site will be confined to
existing established beach access points. No new access points shall
be formed.
Works phase
Discharge waters from the site should not contain more than 50 milligrams per
litre of total suspended solids in the design rainfall event or more than 75 NTU
turbidity. All practical measures must still be taken in beyond-design
events, including chemical dosing, and maintain catch and diversion drains as
required.
All erosion and sediment controls will be checked at least weekly and after rain
to ensure they are maintained in a fully functional condition.
Post-works phase
Any temporary sedimentation control structures will be removed at the end of
the project.
Document No V -EMP • Authorised by Blacklaw Civil Contractors Head Office Telephone
Date a I V i ; a art (Hans Raun) ABN 77 106 750 724 100 Sandalwood Lare Facsimile
Version ' Author Forest Glen OLD 4556 officeiblacklawcivil com.au
Next Review v arv 2r,'- a,g Warren)
Page 18 of 20
Page 22
BLACKLAW
14:0 CIVIL CONTRACTORS
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
Ch u;
Works phase
Materials transported in open trucks will be covered to prevent generation of
dust.
The tailgates of all vehicles transporting material from the site will be securely
fixed prior to loading and immediately after unloading.
Exhaust systems and engines for plant/equipment will be maintained
according to the manufacturers' specifications and regularly monitored to
ensure that exhaust emission are satisfactory (smoke for no longer than 10
seconds). Periodic visual checks will be made on exhaust system emissions.
Post-works phase
Nil
Document No: DMS-EMP.O' Authonsed by Blacklaw Drvll Contractors Head Office Telephone C' 5442 3300
Date a'-.a'y 201 . a-i;e-- . a••s Raun) ABN 77 106750724 100 Sandalwood Lane Facsimile '' 5442 3;59
Version ' Author Forest Glen OLD 4556 of6ce@blacklawuvIl com.au
Next Review - ary 20': en)
Page 19 of 20
Page 23
BLACKLAW Erosion and Sediment Controls Phone: 07 5442 3300
CIVIL CONTRACTORS Fax: 07 5442 3399
14O
^
QMS 070 Email:
100 Sandalwood Lane Scdililcllt F cilcc [email protected]
ABN 77 106 750 724
Forest Glen QLD 4556
Purpose:
Provide a standard procedure for the installation of a sediment fence to control
sediment runoff from exposed land, unsealed roads and stockpiles.
Materials Required
n Commercial sediment fence;
• Wooden stakes, staple gun and staples or star pickets and caps, wire and wire cutters;
• Mallet or pole driver; and
• Shovel
Procedure:
Placement E.ieno .no of IMae
up to tho bWrom
0, the knc• or. $ at 0*
0,
Install sediment fence parallel to the ,op 01 lute dwWb^
contour of the land.
grade
Extend ends upslope so that the
ground level of the end of the silt
fence is equal to the top fabric level at
its lowest point.
Installation Figure 1. Sediment fence on
revegetated bank
Drive wooden stakes or star pickets
at least 600 mm into the ground, with 1 2m timber stakes
Sediment lence
at max 2m centres
a maximum spacing of 2m apart. tabnc
Dig a 150mm deep x 100mm wide c,,ectlon 0'
Ilor
trench along the upslope line of the
fence for the bottom of the fabric to Li
be entrenched. 600 mm m'n 150mm x 100mm trench
Place the bottom 300mm of the fabric
I with compacted backhtl
SECTION DETAIL
into the trench and backfill trench
over base of material with soil Figure 2 Sediment fence installation
material and compact. detail
Fix fabric to upslope side of posts Maintenance
with wire ties or staples.
Sediment fences should be inspected
Where required, join sections of fabric regularly (especially after rainfall
at a support post with a 150mm events) and cleaned out as required.
overlap.
Safety
Cap all Star Pickets if used
Sediment Fence Document Number Page 1 of 1
Issue Number 1 July 2008 QMS 070 Authonsed by: C. Gursanscky
Page 24
BLACKLAW Erosion and Sediment Controls Phone: 07 5442 3300
CIVIL CONTRACTORS Fax: 07 5442 3399
QMS 071 Email:
100 Sandalwood Lane Kerb Inlet Protection [email protected]
ABN 77 106 750 724
Forest Glen QLD 4556
Purpose:
Provide a standard procedure for the installation of Kerb inlet traps to prevent sediment
entering stormwater drainage entry points
Materials Required
• Geo-fabric sausage approx half full of 50-70mm stone or gravel;
Or
n Sandbags
Procedure: Protecting Kerb Inlet with Ag Pipe
& Sediment Fence Material
Protecting a down slope kerb inlet
Place 150mm ag pipe covered with a
Lay sand bags or geo-fabric sausage geofabric sock tied at both ends and
in a row curving upslope from the half filled with 20mm crushed rock
kerb and away from the inlet across inlet.
approximately 4m upslope from the
inlet Lift the kerb inlet grate and place
section of sediment fence material
Over lap bags onto the kerb and sufficient to overhang on all sides.
extend a minimum of 1 metre on the
road Replace grate to lock the material in
place
If using more than one layer, overlap
Sediment fence
the bags with the row beneath and material placed
leave a one bag gap in the middle of under road grate
the top row to serve as a spillway.
5^rnr7Da,,r i - n l
nntn l.^rp - -►
/
Z /
150mm ag pipe covered with
geotextile sock and half filled
Run-oft with 20mm crushed gravel
Figure 2 Kerb inlet protected by Ag Pipe
and Sediment Fence Material
Figure 1 Down Slope Kerb Inlet
Kerb Inlet Protection Document Number Page 1 of 2
Issue Number 1 July 2008 QMS 071 Authonsed by: C. Gursanscky j
Page 25
Protecting a sump-position kerb Protecting a Gully Pit
inlet
Place sand bags in a complete circle
Place bags in an arc around the curb around the gully pit - more than one
inlets that are in a sump position layer may be required due to amount
of run off
Sump Posmon Intel
Sand Bag' Gully pit
Sand Bags
Run-LII
Rein-otf
/1W Run., ,ff
k
Figure 3 Sump Position Kerb Inlet
Figure 4 Gully Pit
Safety
Place warning devices (such as Witches Hat) as appropriate to protect public safety.
Maintenance
Inspect and repair as needed, and remove any accumulated sediments after every storm
event
Kerb Inlet Protection Document Number Page 2 of 2
Issue Number 1 July 2008 QMS 071 Authonsed by: C. Gursanscky
Page 26
BLACKLAW Erosion and Sediment Controls Phone: 07 5442 3300
CIVIL CONTRACTORS Fax: 07 5442 3399
QMS 072 Email:
100 Sandalwood Lane Stockpiles [email protected]
ABN 77 106 750 724
Forest Glen QLD 4556
Purpose:
Provide a standard procedure for the placement and protection of stockpiles of topsoil,
spoil and other material (eg: Sand, gravel, rock etc)
Materials Required
• Commercial sediment fence;
n Wooden stakes, staple gun and staples or star pickets & caps, wire and wire cutters;
• Mallet or pole driver; and
• Shovel
Procedure: On flat surfaces, place sand bags or
geofabric bags filled with gravel around
Stockpiles stockpile (figure 2)
Locate stockpiles as directed by Contract. Seed or cover as directed by Contract.
If no position advised, locate on clear,
even, firm, well drained ground, with a Sandbags placed
to divert Ilow of
separate pile for each material type. water
Do not place stockpiles in natural Kerb
Stockpile
drainage lines
Place stockpiles outside drip line of trees
to prevent damage to the branches or
trunk (by machinery) and damage to roots
(by soil compaction) Figure 2 Stockpile on Flat Surface
If stockpile has to be located on a slope, Maintenance
construct diversion drain or bund on the
upslope side to divert run off around the Sediment fences should be inspected
stockpile. Place a sediment fence 1-2m regularly (especially after rainfall events)
down slope o f the stockpile (figure 1) and cleaned out as required.
Safety
Cap all Star Pickets (if used)
Ensure stockpile poses no public safety
threat (no vertical faces over 1.5m), not
located in pathway or road reserve.
Figure 1. Stockpile on Slope
Stockpiles Document Number I Page 1 of 1
Issue Number 1 July 2008 QMS 072 Authonsed by: C. Gursanscky
Page 27
BLACKLAW Erosion and Sediment Controls Phone: 07 5442 3300
CIVIL CONTRACTORS Fax: 07 5442 3399
IV40 ^ '-.1.--0;-1----;^--
QMS 073 Email:
100 Sandalwood Lane Ch ec k Danis [email protected]
ABN 77 106 750 724
Forest Glen QLD 4556
Purpose:
Provide a standard procedure for the installation of check dams to control flow velocity
in drainage channels such as table drains, swales etc.
Check dams are not to be used in "defined" watercourses
Materials Required
n Rock
• Geofabric bags approximately half full of 50-70mm stone or gravel
or
n Sandbags
Procedure: Sediment Flow
Build up
Installation
Locate check dam in straight section of
drain
Limit height of check dam to around 0.5m
Centre of check dam should be a Spill way
minimum of 150mm lower than the outer
edge to form a spillway
Spacing of rock check dams should be
such that the base of each check dam is Cross Section
no higher than the top of the check dam
below it, Figure 1. Rock Check Dam in Table Drain
Maintenance
Although the primary purpose is to
control flow velocity, check dams will trap
sediment on the upslope side. This
sediment should be removed before it
accumulates to half the original height of
the check dam.
Check Dams Document Number Page 1 of 1
Issue Number 1 July 2008 QMS 073 Authorised by: C. Gursanscky
Page 28
BLACKLA W Erosion and Sediment Controls Phone: 07 5442 3300
CIVIL CONTRACTORS Fax: 07 5442 3399
14 4
"1- 1--1'1._..-;';' "- QMS 074 Email:
[email protected]
100 Sandalwood Lane Rock Filter Dams ABN 77 106 750 724
Forest Glen QLD 4556
Purpose:
Provide a standard procedure for the installation of rock filter dams to trap sediment in
well defined gullies, excavated pits and overland flow paths.
Materials Required
• 200-350mm hard, erosion resistant rock
n 25mm aggregate
• Geofabric
Procedure:
Installation
The size of a rock filter dam will vary
depending upon the site. General
guidelines are:
Minimum top width 200mm
Maximum height 1 m
Maximum side slopes
Upslope face
2 (horizontal): 1 (vertical)
Down slope face Figure 1. Rock Filter Dam
3 (horizontal): 1 (vertical)
Geotextile filter fabric
wrapped around rock
Place support rock, lay geofabric over and keyed in at the
support rock. bottom
Place 200mm of 25mm aggregate over
filter fabric, then key 200mm into rock
Rock filter dams should be keyed in to a 200mm- 350mm rock
keyed in 200mm into
minimum depth of 200mm natural ground
Centre of rock filter dam should be a Figure 2 Rock Filter Dam key in
minimum of 200mm lower than the outer
edge to form a spillway
Maintenance
Rock filter dams require little
maintenance for short-term construction
work sites.
Excessive sediment should be removed
from upstream of the dam, if in place for
longer periods of time.
Rock Filter Dams Document Number Page 1 of 1
Issue Number 1 July 2008 QMS 074 Authorised by: C. Gursanscky
Page 29
BLACKLAW Erosion and Sediment Controls Phone: 07 5442 3300
CIVIL CONTRACTORS Fax: 07 5442 3399
QMS 075 Email:
[email protected]
100 Sandalwood Lane Erosion Matting ABN 77 106 750 724
Forest Glen QLD 4556
Purpose:
Provide a standard procedure for the installation erosion matting to prevent erosion by
absorbing the impact of rainfall and reducing runoff velocities.
Materials Required
• Jute Matting or other designated geo-fabric
• Staples
Procedure:
Installation Dirett^on
Before placement ensure surface is
smooth, uniform and free from stones,
tree roots or other debris. Ph
Place mesh according to site plans.
Figure 1. Erosion Mat
Roll the mesh out in direction of flow
unless otherwise instructed.
Anchor the mesh in a 150mm trench to
start.
Overlap adjacent strips and ends by at
least 150mm
Do not stretch mesh; lay it evenly but
loosely on soil surface.
Staple along each edge of the matting;
spacing not greater than 1.2m. Staple
rows through the middle as required,
alternating each row of staples from the Figure 2 Staple layout guide
row above it.
Rock Filter Dams Document Number Page 1 of 1
Issue Number 1 July 2008 QMS 074 Authorised by: C. Gursanscky
Page 30
BLACKLAW Erosion and Sediment Controls Phone: 07 5442 3300
CIVIL CONTRACTORS Fax: 07 5442 3399
QMS 076 Email:
[email protected]
100 Sandalwood Lane Sccfiillcilt Basins ABN 77 106 750 724
Forest Glen QLD 4556
Purpose:
provide a temporary settling pond with a controlled storm water release structure used
to collect and store sediment produced by construction activities before runoff is
discharged.
Materials Required
• Outlet pipe with riser n Geo-textile
n Rock - 75 - 150 spalls above materials may be required dependant upon site conditions
Procedure:
Installation
Construct excavation or embankment to
create dam wall, primary outlet and
emergency spillway to contract
specifications.
Locate as directed by contract ensuring
that the basin is constructed before
clearing and grading work begins (when Figure 1.
feasible) and only water polluted by site
activities enters the basin. Maintenance
The size of a sediment basin will vary Inspect basin prior to forecast rain, daily
depending upon the needs of the site, but during extended rain events. after rain
will generally conform to the minimum events and fortnightly during the dry
length/width ratio of 3:1. season.
Remove all vegetation and topsoil from Check for seepage and structural
within the storage area and from under soundness.
the dam wall location.
Check inlet and outlet area for erosion
Securely anchor the outlet pipe/riser and and stabilise if required
construct emergency spillway.
Sediment should be removed when
accumulation reaches one half the
If seepage is a considered a problem, line
designated sediment storage volume.
basin with geo-textile.
Remove accumulation of live and dead
floating vegetation.
Sediment Basins Document Number Page 1 of 1
Issue Number 1 July 2008 QMS 076 Authorised by: C. Gursanscky j
Page 31
N"""-a`.com
Date: 27/06/2011 Project: Bunnings Noosa
Comments :
Legend
00BLACKLAW Stage 1 External Roadworks Work Area
I%k CIVIL CONTRACTORS
- Contruction of New Access Rd - ^ ® Bollard
Offset Distance Marker
Refer - UTCD Drawing 10 Safety Zone
Page 32
,..`...
Date: 27/06/2011 Project: Bunnings Noosa
Comments :
Le g end
dO BLACKLAW
CIV/L CONTRACTOR! Stage 2 External Roadworks Work Area
-Centre Island Reconfiguration- Bollard
Safety Zone
Refer - MUTCD Drawing 7
.fT
Page 33
Date: 27/06/2011 Project: Bunnings Noosa
Comments:
Legend
BLACKLAW
CIVIL CON TRAC TORS Stage 3 External Roadworks Work Area
-AC Overlay Phase 1- Bollard
A
Safety Zone
UTCD Drawing 7
-1, r • !'
Trades Parking
Page 34
Date: 27/06/2011 Project: Bunnings Noosa Comments: Stage 3 External Roadworks -AC Overlay Phase 2- Legend @ Bollard p x] Work Area Safety Zone
Page 35
~ START OF WALL
RETAINING WALL KEY PLAN
RETAINING WALL RW1
{REFER SHEET RO1)
PROPOSED BUNNINGS SITE
ONO
\
START OF WALLS.
RETAINING WALL RW2
(REFER SHEET RO2}
END OF WALL.
BACKFILL WITH ‘NO - FINES’ CONCRETE OR SCREENINGS
REFER TO ARCH. ORG.
AG-O1 FOR FENCE
DETALS
po————SITE BOUNDARY
FRONT
NON-RETAINING
FACE
100 MHA. WEEPHOLES , 2No, { MIN. }
PER PANEL, { TYPICAL }
BORD TRORISDRT LE.
3008 X 1000 DEEP
BORED PIER.
PRECAST PANEL
ae
<2 ETAINING FACE
96 DIA. “AGI DRAIN , iN 20 mm DIA. { NOM. SIZE }
SCREENINGS, CONNECT TG STORMWATER DRAINAGE
L
SYSTEM,
MASS CONC. { N25 } BORED PIER.
GRADE N25 CONCRETE.
SOLDIER / BORED PIER SCHEDULE
RETAINED
SOLDIER
PIER DEPTH: | PANEL THICKNESS
SOLDIER NO. | eight fnetres) Souler Size SPACING Qa) | PIER DIA. ina) ‘ont ‘nal PANEL REINFORCEDEENT
A O< HS 0 _ 206 UB 2S 250 600 1200 ~ 150
8 LOS HS 20 200 UB 25 250 600 80 : | RLOWG MESH, EACH F ~ -
c 26 < HS 25 250-08 3 00 60 RLETHG MESH TAL -
25 SHS 30
L 39 < 4835 —_ = UB AG 250 60 3500
F OSHS 10 200 UB 25 250 600 1400 150 RUTB MESH, EACH FACE
G 10 SHS 2.00 200 UB 25 _ 250 600 “y 200 - 50 RUI1B MESH, EACH FACE
NOTE:
1. ALL MAIN BARS IN RECTANGULAR MESH ARE 70 BE HORIZONTAL.
2. PANEL CONCRETE GRADE NAO,
3. COVER FO REINFORCEMENT 30mm.
4. ADDITIONA: SARS ARE T@ BE PLACED ON THE FRONT
INON-RETAINING) FACE.
5. PROVIDE 2NO. ST SWL LIFTERS PER PANEL.
6, PROVIDE Nié PERIMETER BAR, 400 COGS AT CNRS.
REFER TO ELEVATIONS
STEEL SOLDIER WITH PROTECTIVE COATING , CAST INTO BORED PIERS,
REINFORCED CONCRETE PANELS. ‘NO FINES’ CONC. BACKRILL.
SECTION (BY
SEERES
ADDITIONALI REINFORCEMENT AS NOTED IN SCHEDULE
{ CRINGN-RETAINING OR FRONT FACE }
SCALE £500 i
TYPICAL ELEVATION
SECTION “A
NOTES :
1 ALL ‘UBs’ AND ‘UCs’ SHALL BE HOT DIP GALVANISED IN ACCORDANCE
WITH AS.4791
2. ALL ‘CHS’ AND ‘SHS' SHALL BE HOT DIP GALVANISED IN ACCORDANCE
WITH AS.4792.
3. GALVANISING IS TO BE AT A MINIMUM RATE OF 300g/m2.
SUE ISSUED FOR DATE | ORAWH jaPPROVED] ISSUE ISSUED FOR DATE. | Raw [APpaaven| O18. K. BENNETT DATE APRIL 2011 SON: PRORCE: eae we
0 PRELIKNARY DRAWINGS epae ae T-FINLAYSOM Stitt AS SHOWN PROPOSED BUNNINGS STRUCTURAL DRAWING YQ
“a vaewwuavoeeens ew ff a are TEM GROUP Pty Lid H. TROON PTY. LTD.
3 FoR APPROVAL san | eee “FOHECRES: é APPROVED: 3 i tat5 St eae avunaniiuta CAND STEELFASHIGATORS WAREHOUSE DRAWING TILE
Gi . . Bae | Z 7 Sn, be BUILDERS - MIMER CIAL ANE tit
iba. e899 a ph (oa) soa0 ene fo SOK RL WENOOUREE 3355 EUMUND I-NOOSA ROAD RETAIN ING WALL DETAILS
. fo anf af an eet = TGM ABN 1 aS 30 1 Feces NOOSAVILLE
(©) COPYRIGHT TGH GROUP PTY. LTD. QUEENSLAND TON REE. Ma: A400. 04 ‘SHEET: RO3 issue: 03
Page 36
“EC OF 9 “92
4400-02-CE
TGM REF. No.
DRAWING INDEX
BUNNINGS WAREHOUSE
EUMUNDI-NOOSA ROAD, NOOSAVILLE
ROUNDABOUT AND ROAD WORKS
GENERAL NOTES
THESE DRAWINGS SHALL BE READ IN
CONJUNCTION WITH THE SPECIFICATION AND
ALL OTHER RELEVANT CONSULTANTS
DRAWINGS, SPECIFICATIONS, CLIENT
INSTRUCTIONS, AND ANY WRITTEN
INSTRUCTIONS ISSUED DURING THE COURSE OF
THE CONTRACT. ANY DISCREPANCIES SHALL BE
REFERRED TO THE ENGINEER FOR DISCUSSION
BEFORE PROCEEDING WITH WORK.
DIMENSIONS SHALL NOT BE OBTAINED BY
SCALING THE DRAWINGS.
SUBSTITUTES WILL NOT BE PERMITTED
WITHOUT THE WRITTEN APPROVAL OF THE
ENGINEER.
DURING CONSTRUCTION THE SITE SHALL BE
MAINTAINED IN A STABLE CONDITION AND NO
PART OF THE SITE SHALL BE UNSAFE AS ‘A
RESULT OF THE CONSTRUCTION PROCEDURE.
MATERIALS AND WORKMANSHIP SHALL BE IN
ACCORDANCE WITH THE SPECIFICATION AND
SUNSHINE COAST REGIONAL COUNCIL
STANDARDS, THE CURRENT
REVISION OF ALL RELEVANT SAA CODES, THE
REQUIREMENTS OF THE QUEENSLAND BUILDING
REGULATIONS, THE BUILDING CODE OF
AUSTRALIA AND THE RELEVANT AUTHORITIES.
UNLESS NOTED OTHERWISE ON A PARTICULAR
DRAWING THESE NOTES SHALL APPLY
THE LOCATION OF UNDERGROUND SERVICES
SHOWN ARE INDICATIVE ONLY. THE
CONTRACTOR IS RESPONSIBLE FOR
CONTACTING ALL AUTHORITIES TO
DETERMINE THE LOCATION OF UNDERGROUND
SERVICES PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION WORK. ANY CLASH OF
WORKS WITH A SERVICE IS TO BE REPORTED
TO THE ENGINEER IMMEDIATELY. THE
CONTRACTOR SHALL ENSURE THAT ALL
SERVICES ARE FULLY PROTECTED DURING
CONSTRUCTION, ANY SERVICES DAMAGED
DURING CONSTRUCTION SHALL BE REPAIRED
AT THE CONTRACTORS EXPENSE.
THE TERM “ENGINEER” SHALL MEAN A
REGISTERED PROFESSIONAL
ENGINEER QUEENSLAND
CONCRETE NOTES
ALL CONCRETE AND CONCRETE PRACTICE SHALL BE GENERALLY
IN ACCORDANCE WITH AS 3600 CONCRETE STRUCTURES CODE.
ALL INSITU CONCRETE SHALL HAVE A CHARACTERISTIC
STRENGTH AT 28 DAYS (F’c) OF 25 MPa UNLESS NOTED
OTHERWISE.
CONCRETE ELEMENTS SHOWN ON THESE DRAWINGS MUST NOT
BE REDUCED IN ANY WAY WITHOUT THE ENGINEER’S
APPROVAL. NO HOLES, CHASES, OR EMBEDMENTS, OTHER
THAN THOSE SHOWN WILL BE PERMITTED IN ANY CONCRETE
ELEMENTS WITHOUT THE ENGINEER’S APPROVAL.
REINFORCEMENT NOTATION
R - DENOTES STRUCTURAL GRADE PLAIN ROUND
BARS TO AS 1302
N - DENOTES HOT ROLLED DEFORMED BARS TO
AS 1302 (410Y)
SL72 - DENOTES REINFORCEMENT FABRIC TO AS 1304
(12 DENOTES SIZE OF FABRIC)
LAPPING REINFORCEMENT 5 50
MESH = = ° “= = a
TRENCH MESH 500mm FULL WIDTH AT INTERSECTION
BAR SIZE TOP BARS OTHER BARS
(300mm OR MORE
CONCRETE BELOW}
Ni2 300
N16 700 400
N20 600
COVER
CLEAR COVER TO REINFORCEMENT SHALL BE AS NOTED
ON THE DRAWINGS.
CONCRETE COVER SHALL BE MAINTAINED BY THE USE
OF APPROVED CHAIRS AND/OR CONCRETE BLOCKS.
CONDUITS, PIPES ETC. ARE NOT T0.BE PLACED IN
CONCRETE COVER.
THE SLUMP OF ALL CONCRETE AT THE TIME OF PLACING AT
THE JOB SHALL BE 75mm +/- 15mm TOLERANCE U.N.O.
ALL CONCRETE PLACED IN POSITION SHALL BE ADEQUATELY
VIBRATED.
ALL CONCRETE SHALL BE CURED TO THE APPROVAL OF
THE ENGINEER.
ALL PIPEWORK CAST INTO CONCRETE IS TO BE SLEEVED
OR LAGGED WITH APPROPRIATE COMPRESSIBLE
MATERIAL FOR THE FULL LENGTH OF EMBEDMENT.
CIVIL NOTES
ALL DIMENSIONS ARE IN MILLIMETRES UNLESS SHOWN
OTHERWISE. ALL LEVELS SHOWN ARE TO AUSTRALIAN HEIGHT
DATUM (TBM) AS NOTED ON THE PLANS. ALL SET-OUT
CO-ORDINATES ARE BASED ON AN ARBITRARY CO-ORDINATE
SYSTEM AS NOTED.
UNLESS OTHERWISE SPECIFIED OR APPROVED BY THE ENGINEER,
LAYING OF ALL PIPES OR CULVERTS SHALL COMMENCE AT THE
DOWNSTREAM END.
PRIOR TO ANY WORKS COMMENCING THE CONTRACTOR SHALL
COMPLETE A CHECK OF ANY EXISTING CONNECTING STORMWATER
DETAILS, INCLUDING INVERTS, DIAMETERS, DEPTHS, MATERIAL
ETC, TO CONFIRM ANY EXISTING DETAILS SHOWN ON THE
DRAWINGS. ANY DISCREPANCY SHALL BE REPORTED TO THE
ENGINEER.
STORMWATER DRAINS ARE TO BE PVC SEWER QUALITY PIPES
OR REINFORCED CONCRETE AS NOTED.
RC PIPES ARE TO BE RUBBER RING JOINT.ED CLASS 3 UNDER
VEHICLE PAVEMENTS. ALL RC PIPES ELSEWHERE ARE TO BE
CLASS 2 WITHOUT RUBBER RING JOINTS.
DRAINAGE PIPES MUST BE BEDDED IN ACCORDANCE WITH THESE
DRAWINGS.
DRAINAGE, SERVICES AND CONDUIT TRENCHES UNDER
PAVEMENTS, FOOTPATHS AND PAVING ARE TO BE BACKFILLED
TO THE UNDERSIDE OF THE PAVEMENT WITH AN APPROVED
CONSOLIDATED MATERIAL IN ACCORDANCE WITH THE RELEVANT
MUNICIPALITIES CONDITIONS. :
THE LOCATION OF EXISTING UNDERGROUND SERVICES SHOWN IS
INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR
CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATIONS
OF UNDERGROUND SERVICES AND OTHER ASSOCIATED WORKS,
ANY CLASH OF THE WORKS WITH A SERVICE IS TO BE REPORTED
TO THE ENGINEER IMMEDIATELY. THE CONTRACTOR SHALL
ENSURE THAT SERVICES ARE FULLY PROTECTED DURING
CONSTRUCTION. ANY SERVICES DAMAGED DURING CONSTRUCTION
SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.
SERVICES OTHER THAN THOSE SHOWN ON THE DRAWINGS MAY
EXIST. THE CONTRACTOR IS TO ALLOW FOR THE ALTERATION TO
SERVICES WITHIN THE SITE, INCLUDING THE ADJUSTMENT OF PIT
COVER LEVELS AND. THE REMOVAL AND SEALING OF UNWANTED
SERVICES & ASSOCIATED PITS & FITTINGS.
EXPOSED SUBGRADE AREAS SHALL BE PROOF ROLLED UNDER
THE SUPERVISION OF THE ENGINEER USING A 10 TONNE AXLE
LOAD, SOFT AREAS DETECTED SHALL BE EXCAVATED AND
BACKFILLED AS DIRECTED BY THE ENGINEER.
THE PAVEMENT SUB-BASE COURSE IS TO BE COMPACTED TO
97% MODIFIED MAXIMUM DRY DENSITY COMPACTION. THE
PAVEMENT BASE COURSE TO 98% MODIFIED MAXIMUM DRY
DENSITY.
ALL WORKS ADJACENT TO THE SITE ARE TO BE APPROVED
INSPECTED BY SUNSHINE COAST REGIONAL COUNCIL.
THE ORIENTATION OF ALL STORMWATER DRAINAGE ACCESS
COVERS & GRATES ARE SHOWN INDICATIVELY AND ARE TO BE
MANUFACTURED & INSTALLED IN ACCORDANCE WITH
AS3996-2006.
COUNCIL HOLD POINTS
IN ACCORDANCE WITH HOLD POINTS SPECIFIED IN PRE-START
DOCUMENTATION. ALL HOLD POINTS TO BE CERTIFIED BY A RPEQ
ENGINEER.
PROVIDE TOOLED JOINTS IN KERBS, KERB AND CHANNEL AT 2.0m
MAXIMUM CENTRES.
SAWCUT EXISTING KERBS & PAVEMENTS WHERE REQUIRED FOR
INSTALLATION OF NEW KERBS AND WHERE NEW WORK IS TO
MATCH EXISTING.
THE CONTRACTOR SHALL AT ALL TIMES DURING THE CURRENCY
OF THE WORK PROTECT THE PUBLIC FROM THE WORKS, PLANT,
TRENCHES ETC. OCCASIONED BY THE WORKS BY THE USE OF
APPROVED BARRICADES AND BARRIERS. SUCH PROTECTIVE
MEASURES WILL BE SUBJECT TO THE APPROVAL OF THE
ENGINEER AND A REPRESENTATIVE FROM SUNSHINE COAST
REGIONAL COUNCIL. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY DAMAGE OR INJURY ARISING FROM THE NEGLECT OR
INSUFFICIENCY OF SUCH PRECAUTIONS.
THE CONTRACTOR IS ADVISED THAT THE MINES (TRENCHES)
REGULATIONS 1982 WILL APPLY TO THIS PROJECT. THE
CONTRACTOR IS REQUIRED TO SATISFY AND/OR PUT INTO
EFFECT ALL REQUIREMENTS. OF THOSE REGULATIONS AND THOSE
OF THE OFFICE OF MINERALS AND ENERGY.
THE WORKS SHOWN HEREIN ARE SUBJECT To THE SUPERVISION
OF THE PRINCIPAL’S APPOINTED SUPERINTENDENT.
CARE IS TO BE TAKEN TO PROTECT EXISTING FENCES, BUILDINGS,
FITTINGS, SERVICES, FURNITURE, SIGNAGE, TREES AND OTHER
ITEMS TO BE RETAINED FROM ANY DAMAGE.
UNWANTED PITS, PIPES SERVICES ECT. IN PAVEMENT AREAS ARE
TO BE REMOVED AND THE HOLE BACKFILLED WITH AN APPROVED
CONSOLIDATED MATERIAL IN ACCORDANCE WITH THE RELEVANT
MUNICIPALITIES CONDITIONS.
THE CONTRACTOR SHALL INSPECT THE SITE AND DETERMINE THE
EXISTING ASPHALT PAVING, PITS, PIPES, SERVICES, TREES,
KERBS, DRAINS, BUILDINGS, FITTINGS, FURNITURE, SIGNAGE, ETC.
THAT ARE TO BE REMOVED AND HE SHALL ALLOW IN HIS TENDER
PRICE FOR ALL COSTS ASSOCIATED WITH THE NECESSARY
REMOVAL.
IN AREAS WHERE THERE IS TO BE FILLING UNDER PAVEMENT
AREAS, THE SUBGRADE SHALL BE CLEARED OF ANY ROOT
MATTER AND LOOSE MATERIAL TO THE DESIGN LEVELS. THE
SUBGRADE AREA SHALL BE PROOF ROLLED UNDER THE
ENGINEERS SUPIVISION USING A 10 TONNE AXLE LOAD TO
LOCATE ANY SOFT SPOTS. ANY SOFT SPOTS SHALL BE
EXCAVATED AND REPLACED WITH AN APPROVED MATERIAL IN
150mm COMPACTED LAYERS TO A MODIFIED DRY DENSITY OF 95%
COMPACTION.
THE CONTRACTOR SHALL ALLOW TO PROVIDE TEMPORARY
SHUTTERS FOR ALL TRENCHES AS NECESSARY.
SURPLUS SPOIL NOT REQUIRED BY THE DEVELOPER SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE
REMOVED FROM THE SITE, TC THE MUNICIPAL TIP OR A SITE
APPROVED UNDER THE COUNCIL PLANNING & ENVIRONMENT ACT
AND THE EPA ACT.
THE CONTRACTOR SHALL DEVELOP AND ENSURE THE STRICT
IMPLEMENTATION OF AN APPROVED SITE ENVIRONMENT
MANAGEMENT SYSTEM GENERALLY IN ACCORDANCE WITH THE
RELEVANT EPA QUEENSLAND REGULATIONS.
FOR APPROVAL
EC10F 9 | GENERAL NOTES & DRAWING INDEX
EC2 OF 9 | PROPOSED ROUNDABOUT PAVEMENT LAYOUT PLAN
EC3 OF 9 | GATEWAY DRIVE CROSS SECTIONS
ECh OF 9 | EUMUNDI EAST CROSS SECTIONS
ECS OF 9 | EUMUNDI WEST CROSS SECTIONS
ECé OF 9 | KERB SETOUT CO-ORDINATES AND LEVELS
EC7 OF 9 | GATEWAY DRIVE LONGITUDINAL SECTION
EC8 OF 9 | DRAINAGE LONGITUDINAL SECTIONS
EC9OF9 | LINEMARKING PLAN
= maa een
02
ISSUED FOR APPROVAL
24/06/11} SM.
SURVEY:
SHEET SIZE: y4
CHECKED:
APPROVED:
DATE:
DATE:
©) COPYRIGHT T.G.M GROUP PTY, LTD.
& —— J
TG
TGM GROUP Pty Ltd BSlax
Ballarat @
1315 Sturt Street ©
Ballarat, VIC 3350
Ph: (03) 5330 8888 ——auawiso. 00!
Web: tgmgroup.com —_—ougs ASINZS 4804
A.B.N. 11.125 568 461 — emironmexASINZS 14004
CLIENT:
H. TROON PTY. LTD.
ALUMINIUM AND STEEL FABRICATORS
BUILDERS - COMMERCIAL AND INDUSTRIAL
P.O. BOX 84, WENDOUREE, 3355.
Tel: {03} $339 2208 ~ (03) 5339 3622
Fax: (03) 5338 1310
Email: [email protected]
PROJECT:
PROPOSED BUNNINGS
WAREHOUSE
EUMUNDI-NOOSA ROAD
NOOSAVILLE, QUEENSLAND
CIVIL DRAWING
DRAWING TITLE:
GENERAL NOTES & DRAWING INDEX
TGM REF. No.: SHEET:
4400-02-CE
ECi'9
REV:
02
Page 37
NOTE: THE CONSTRUCTION CONTRACTOR IS TO BE AWARE OF AND ALSO IMPLEMENT ALL RELEVANT PROCEDURES IN ACCORDANCE WITH SUNSHINE COAST COUNCIL DEVELOPMENT APPROVAL DETAILS. Metal storage sheds OTE: THE TOTAL REQUIRED PAVEMENT THICKNESS MUST BE BASED ON THE DEPARTMENT OF MAIN ROAD'S PAVEMENT DESIGN MANUAL USING SOAKED CBR TESTS OF THE SUBGRADE. THE DESIGN PAVEMENT THICKNESS, TOGETHER WITH CBR TEST RESULTS MUST BE SUBMITTED TO COUNCIL'S CHIEF EXECUTIVE OFFICER (CEO) FOR APPROVAL PBIOR TO PLACEMENT OF PAVEMENT MATERIAL. 2 \\ me he : 26 RP222164 SP151406 HA é MATCH EXISTING PAVEMENT LEVEL & . al : " \ -| GEOMETRY Lid Level 8.34 | iii IL 5.60 2 Ye Ss SP131406 //JTIK Footpath FOR INTERNAL = / - ° ; _ wee j “ API) ACCESS To BUNNINGS an Z| i | ~ J — 50 NOTE: THE LOCATION OF UNDERGROUND SERVICES SHOWN ARE nar - EXISTING SIDE ENTRY PITS TO BE MODIFIED. INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR /MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL SP?1 | ee me PMveyyay yyy oe a “ He ene ~ : CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATION OF mae A VA\\\\' NS cee a AL / ff me 1 UNDERGROUND SERVICES PRIOR TO THE COMMENCEMENT OF J Li} NN _p | NG i Ai ¢ ; : . CONSTRUCTION WORK. ANY CLASH OF WORKS WITH A SERVICE IS . JETER PR OPOSED BUNNINGS SITE EAL / “ ue _ RP135064 TO BE REPORTED TO THE ENGINEER IMMEDIATELY. THE Hi oS a SI CONTRACTOR SHALL ENSURE THAT ALL SERVICES ARE FULLY (i . PROTECTED DURING CONSTRUCTION, ANY SERVICES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. TGM REF. No. 4400-02-CE Metal storage sheds LO 3 oh MEDIAN KERB TAPER TO MATCH ° = oe @BACK TO EXTENT OF WORKS a / a RETAINING WALL. DESIGN BY OTHERS 71) oom es a eef Z NOTE: ANY SERVICE THAT NEEDS TO BE ALTERED AS PART OF THE NEW 308 a REFER STRUCTURAL DRAWING ROADWORKS SHOULD BE DONE SO IN ACCORDANCE WITH THE _— / 4400-01 RO1 FOR DETAIL SERVICE AUTHORITY GUIDELINES. SP114181 - ; CONTRACTOR TO NOTIFY THE SERVICE AUTHORITIES PRIOR TO ANY WORKS COMMENCING. NEW FOOTPATH TO MATCH EXISTING NOTE: REFER SHEET EC9 FOR SIGNAGE AND LINEMARKING DETAILS NEW KERB TO MEDIAN TO MATCH EXISTING - Ze Cae - 0 : CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE. A it eee ~ MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS. 4 EGS , BUP 13364 WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE 5 ‘ J MINIMUM COVER. : / ; x Zep Toba : ISOLATION VALVES TO BE INSTALLED ON EXISTING WATER MAINS. | “ . . , ; ao POSITIONS OF ISOLATION VALVES TO BE LOCATED EITHER SIDE OF PROPOSED / at flan oN / ROUNDABOUT. FINAL POSITION TO BE CO-ORDINATED WITH SUNSHINE COAST . : | MATCH EXISTING PAVEMENT COUNCIL ENGINEER, UNITY WATER AND CONTRACTOR ON SITE : “LEVEL & GEOMETRY OS SAWCUT EXISTING PAVEMENT ALONG. 7 VEGETATION CLEAR ZONE FROM OVERHEAD POWER LINES. ‘ . DICE EDGE OF NEW KERB & CHANNEL 3793 1 LIMIT TREE REMOVAL IN ACCORDANCE WITH COUNCIL 2 00: - | Za 1 INSPECTION AND IN PRINCIPAL AGREEMENT FROM SITE 4] \ Oe ES MEETING ON 22/06/11 : = : “ BUP 13364 or RP131576 ek “e EXISTING SIDE ENTRY PIT TO BE MODIFIED. ag WW POP LEGEND - PROPOSED WORKS MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL f 5 - . / arch eee = ; | : , EN ; GA astro “LEVEL & GEOMETRY 2 z CK wl Ss DESIGN KERB & CHANNEL LEGEND - EXISTING CONDITIONS KERB & CHANNEL TO BE REMOVED Le 2 KERB & CHANNEL TO BE REMAIN CONCRETE PAD SUITABLE FOR A FLECTRICTY «TELSTRA ES fe? COUNCIL VEHICLE. REFER LANDSCAPE 506 MANHOLE 7 “7 ARHITECTS DRAWINGS FOR LOCATION. EXTENT OF PROPOSED ATH Buse © Tease oS ao . STING KERB ISLAND POWER SP114181 ; OE: POLE TELSTRA ow WA -TO BE REMOVED EXTENT OF LT PAVEMENT TO BE LIGHT © MARKER METER CONFI WITH CBR & EXISTING POLE 6 FENCE @ TAP P. TESTING & ELECTRICITY WATER MARKER P453000 EXISTING KERB ISLAND RELOCATED WATER MAIN (IN ACCORDANCE ELECTRICTY TELSTRA STORMWA B oir PIT MANHOL %, PS VALVE @ SEWER | )TREE @ FIRE <I WITH INDICATIVE UNITYWATER PLAN) ~ TO BE MANHOLE Na HYDRANT TO BE REMOVED CONFIRMED WITH UNITY WATER @ Nspection © SHRUB water BUPYO109 g earric SZ Pa MARE id BOLLARD EXTENT OF BIKE LANE LINEMARKING LIGHT . TRAFFIC BENCH @ SIGN “S SIGN A MARK LINEMARKING P307631 SUBJECT LOT BOUNDARY —————_ ADJOINING BOUNDARY OVERHEAD POWER LINE UNDERGROUND POWER CABLE 910 2 —————_ GAS LINE BN SEWER LINE : ———————— STORMWATER LINE RP150347 > a RP150347 TELSTRA CABLE OPTICAL FIBRE CABLE WATER RETIC EDGE OF VEGETATION CENTRE-LINE OF GULLY CHANGE OF GRADE ~ ———-—— TOP OF BANK | . — BOTTOM OF BANK 19 P94612 ane os TRANSITION NEW KERB ALIGNMENT TO MATCH FENCE LINE 3 RP150347 EXISTING KERB ALIGNMENT. EXTENT OF PAVEMENT WORKS WALL Qe EDGE OF BITUMEN 902 a a bacr'or Kere we \es / ~ RP1SO547 = = CONCRETE RP 150345 A <\ PAVING FOR APPROVAL ISSUED FOR DATE | DRAWN | APPROVED fiSSUE ISSUED FOR SYS oN IP533 DATE | DRAWN | APPROVED} DESIGNED: G MANSELL DATE: 19/04/11 ISSUED FOR INFORMATION ss/ownt| SM. CLIENT: PROJECT: DRAWN: S. MANTERFIELD SCALE: 4500 KERB ALIGNMENT MODIFIED, ISSUED TO ENERGEX | | 08/04/11 SM. CIVIL DRAWING 0 SURVEY: _ SHEET SIZE: y 4 TGM GROUP Pty Ltd BSlax H. TROON PTY. LTD. PROPOSED BUNNINGS i KERB ALIGNMENT MODIFIED, RE-ISSUED TO ENERGEX | 20/04/11] SM. CHECKED: APPROVED: — ee © ALUMINIUM AND STEEL FABRICATORS 1315 Sturt Street ISSUED FOR APPROVAL 26/06/11) SM. DRAWING TITLE: puilarae, urt Street po. Box au wenoouret “TT INDUSTRIAL WAREHOUSE PROPOSED ROUN DABOUT aE TG M hs (03) $330 8868 ounls0 0 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA RCAD ISSUED FOR APPROVAL 29/07/11 SM. = = o onas. Fax: (03) 5338 1310 A.B.N. 11.125 568 461 Environment AS/NZS 14001 PAVEMENT LAYOUT PLAN Email: [email protected] NOOSAVILLE, QU EENSLAND ane =< = () COPYRIGHT T.G.M GROUP PTY. LTD, Now: 4400-02-CE EG2 9 0
Page 38
05
REV.
9
EC2°
SHEET:
4400-02-CE
TGM REF. No.:
NOTE: THE CONSTRUCTION CONTRACTOR IS TO BE AWARE OF AND ALSO
IMPLEMENT ALL RELEVANT PROCEDURES IN ACCORDANCE WITH
SUNSHINE COAST COUNCIL DEVELOPMENT APPROVAL DETAILS.
NOTE: THE TOTAL REQUIRED PAVEMENT THICKNESS MUST BE BASED ON THE DEPARTMENT OF MAIN ROAD'S PAVEMENT
DESIGN MANUAL USING SOAKED CBR TESTS OF THE SUBGRADE.
THE DESIGN PAVEMENT THICKNESS, TOGETHER WITH CBR TEST RESULTS MUST BE SUBMITTED TO COUNCIL’S CHIEF
EXECUTIVE OFFICER (CEO) FOR APPROVAL PRIOR TO PLACEMENT OF PAVEMENT MATERIAL
Lid Level 8.31 =
IL 5.60 Lid-tevel 8:64
: IL 6.440
NOTE: THE LOCATION OF UNDERGROUND SERVICES SHOWN ARE
INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR
CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATION OF
UNDERGROUND SERVICES PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION WORK. ANY CLASH OF WORKS WITH A SERVICE IS
TO BE REPORTED TO THE ENGINEER IMMEDIATELY. THE
CONTRACTOR SHALL ENSURE THAT ALL SERVICES ARE FULLY
PROTECTED DURING CONSTRUCTION, ANY SERVICES DAMAGED
DURING CONSTRUCTION SHALL BE REPAIRED AT THE
CONTRACTORS EXPENSE.
NOTE: ANY SERVICE THAT NEEDS TO BE ALTERED AS PART OF THE NEW
ROADWORKS SHOULD BE DONE SO IN ACCORDANCE WITH THE
SERVICE AUTHORITY GUIDELINES.
CONTRACTOR TO NOTIFY THE SERVICE AUTHORITIES PRIOR TO
ANY WORKS COMMENCING.
NOTE: REFER SHEET EC9 FOR SIGNAGE AND LINEMARKING DETAILS
NOTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS.
WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE
MINIMUM COVER
SP114181 UR
-| GEOMETRY
508
NEW FOOTPATH TO. TL
MATCH EXISTING
NOTE: ISOLATION VALVES TO BE INSTALLED ON EXISTING WATER MAINS.
COUNCIL ENGINEER, UNITY WATER AND CONTRACTOR ON SITE
POSITIONS OF ISOLATION VALVES TO BE LOCATED EITHER SIDE OF PROPOSED
ROUNDABOUT. FINAL POSITION 70 BE CO-ORDINATED WITH SUNSHINE COAST
VEGETATION CLEAR ZONE FROM OVERHEAD POWER LINES
LIMIT TREE REMOVAL IN ACCORDANCE WITH COUNCIL
INSPECTION AND IN PRINCIPAL AGREEMENT FROM SITE
MEETING ON 22/06/11
EXISTING SIDE ENTRY PIT TO BE MODIFIED.
MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL
Ni)) \\> ~~
PATTIE é
MATCH EXISTING PAVEMENT LEVEL &
fs
A
a
~ VW
~ MATCH EXISTING PAVEMENT
LEVEL & GEOMETRY
2 a i, )
PN \ ) /
.00 N ! A
S
Ves
aS wf | de Le
SY (MATCH EXISTING PAVEMENT.
{ “LEVEL & GEOMETRY a
~ MLSS —-
ep NER ; <%
Zs
A MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL
/
| -\_- PROPOSED BUNNINGS SITE
$P211687
“Z-RETAINING WALL. DESIGN BY OTHERS
REFER STRUCTURAL DRAWING
4400-01 RO1 FOR DETAIL
=€P3
¢
80
Metal storage sheds
SRN
f
26
SP151406
2
SP131406
SPN *
x we
Metal storage sheds
7
RP1355064
Street Sign
RRR
f
o ‘6 gro? :
se an
MEDIAN KERB TAPER TO MATCH
BACK TO EXTENT OF WORKS
Ta
RP222164
NEW KERB TO MEDIAN TO MATCH
A EXISTING
0
BUP 13364
foe EXISTING PAVEMENT ALONG 7
EDGE OF NEW KERB & CHANNEL, ne (03723 1 nae
DEE BUP13364
LE Zope RP 131576
co" LEGEND - PROPOSED WORKS
=== DESIGN KERB CHANNEL LEGEND - EXISTING CONDITIONS
2
—— KERB & CHANNEL TO BE REMOVED
g GLecTRiciTy TELSTRA
PIT PIT
CONCRETE PAD SUITABLE FOR A = BERB & CHANNEL "TO BE REMAIN ELECTRICITY
TELSTRA
ff COUNCIL VEHICLE. REFER LANDSCAPE SE ny MANHOLE
hk — ARHITECTS DRAWINGS FOR LOCATION. SEBS EXTENT OF PROPOSED FOOTPATH piLLaR TELSTRA
506 : SS Bouee PILLAR
= XISTING KERB ISLAND POLE TELSTRA
SP114181 oe TO BE REMOVED EXTENT OF ASPHALT PAVEMENT TO BE LIGHT © MARKER
a ey CONFIRMED WITH CBR & EXISTING POLE o FENCE
fee PA ENT TESTING ® ELectRIcITY
RELOCATED WATER MAIN (IN ACCORDANCE SEWER «TREE FIRE
E2000 Sas KERB ISLAND WITH INDICATIVE UNITYWATER PLAN) - TO BE © MANHOLE ; ® HYDRANT
MEA \ E REMOVED CONFIRMED WITH UNITY WATER @ NNspectION @ SHRUB water
] Se BUDM0109 eee PALM MARKER
a ae J jg s LIGHT 7 TREE © BOLLARD
2 t otf EXTENT OF BIKE LANE LINEMARKING y 1
awl RAFFIC BENCH
oO | ? \ @ SIGN “Sw SSIGN A MARK
= z i /
2 eo — S << LINEMARKING
= i P307631 = ———————— SUBJECT LOT BOUNDARY
Q a Zs es —————__ ADJOINING BOUNDARY
= : : can NO OVERHEAD POWER LINE
a e St vy D\ —eenemomemememenee UNDERGROUND POWER CABLE
5 ee as N 910 2 GAS LINE
S . SEWER LINE
——————_ STORMWATER LINE
& RP 150347 RP150347 STORMWATER EI
DN eee eT Oe er F*"T“€e NRK RVR Na OPTICAL FIBRE CABLE
\ —————_ WATER RETIC
EDGE OF VEGETATION
CENTRE-LINE OF GULLY
CHANGE OF GRADE
TOP OF BANK
BOTTOM OF BANK
19 FENCE LINE
3 SSS WALL
TRANSITION NEW KERB ——————_ EDGE OF BITUMEN
ALIGNMENT TO MATCH RP150347 IL OF KERB
EXISTING KERB ALIGNMENT 902 RP150347 cOMRETE
on PAVING
RP 150345 ~
\ >
\
\ P5 5S
ISSUE ISSUED FOR DATE | DRAWN | APPROVED [ISSUE ISSUED FOR DATE | DRAWN | APPROVED | DESIGNED: G MANSELL DATE: 19/01/11 GHENT: EROJECT —_—__ Nogr!
ss — i H. TROON PTY. LTD. | PROPOSED BUNNINGS ee
02. | KERB ALIGNMENT MODIFIED, ISSUED TO ENERGEX | 08/04/11] S.M SURVEY: SHEET SIZE a4 TGM GROUP Pty Ltd Bola . : .
Ballarat ALUMINIUM AND STEEL FABRIGATORS DRAWING TITLE:
03 | KERB ALIGNMENT MODIFIED, RE-ISSUED TO ENERGEX | 20/04/11] SM. CHECKED: |APEROVED: _ als Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL WAREHOUSE PROPOSED ROUNDABOUT
~ allarat,
04 | ISSUED FOR APPROVAL 24/06/11] SM Dh: (03) 5330 8888 oo Oe ee Nr tray aay EUMUNDI-NOOSA ROAD
ae valiy ISO 9004 Tel: (03) 5339 2208 - (03) 5339 3622 a
0S | ISSUED FOR APPROVAL 29so1/it] SM mi DATE: Web: tamgroup.com oss ASINZS 4801 Fax: (03) 5338 1310
() COPYRIGHT T.G.M GROUP PTY. LTD.
A.B.N. 11 125 568 461
Environment AS/NZS 14001
Email: [email protected]
PAVEMENT LAYOUT PLAN
NOOSAVILLE, QUEENSLAND
TGM REF. No. SHEET:
4400-02-CE
EC2'9
REV:
05
Page 39
N l |
So "
s
cs NOTE: THE CONSTRUCTION CONTRACTOR IS TO ENSURE THAT ALL EXISTING
STREET SIGNS THAT ARE AFFECTED BY THE EXTERNAL WORKS ARE I
oS TO RE-INSTALLED IN ACCORDANCE WITH COUNCIL ENGINEERING
5 CONSTRUCTION OFFICER
8 CHANGED
O TRAFFIC
CONDITIONS
Ww AHEAD
a NEW
we ROUNDABOUT
AHEAD
NOTE: ALL PROPOSED PATHWAYS ARE 2.0m WIDE AND ARE LOCATED 1.65m
FROM BACK OF PROPOSED KERB UNLESS NOTED OTHERWISE.
REFER SHEETS EC3-EC5 FOR CROSS SECTIONS.
O
a
N
Te
S NOTE: ALL LINEMARKING & RAISED REFLECTIVE PAVEMENT MARKING SHALL
x BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC.
REFER SCRC STANDARD & MUTCD FOR ACTUAL POSITION OF SIGNS ss
= Kx
2 1%
ie Kee
2 xo
S 4
e xo.
xx
Bee
BI
eI
Be
BS
Kee)
BSA ™
&
~
x
an mM
S Z
So
S
SSIES PROPOSED COLOURED (GREEN) er \
SSSR oe rN BIKE LANE - 35m MINIMUM YP
LENGTH FROM INTERSECTION AA
PROPOSED COLOURED (GREEN) B OA
BIKE LANE - 40m MINIMUM Qin A A
LENGTH FROM INTERSECTIO j CHANGED
3, TRAFFIC
ERY = aria
m
NEW
a reaeea
CHANGED ~
TRAFFIC
CONDITIONS. a «
AHEAD
To, w By L xm
a Es PROPOSED COLOURED (GREEN) x
ow Bs BIKE LANE - 85m MINIMUM .
QO BS LENGTH FROM INTERSECTION
> BS
S$ PROPOSED COLOURED (GREEM
BIKE LANE - 55m MNP
LL LENGTH FROMINTERSECTION
x
C1
[ PROPOSED COLOURED (GREEN)
CHANGED BIKE LANE - 40m MINIMUM
TRAFFIC LENGTH FROM INTERSECTION LEGEND - PROPOSED WORKS
CONDITIONS
AHEAD
NEW
ROUNDABOUT 4 SSS DESIGN KERB & CHANNEL
LESH
AHEAD Sy
: x 8 ses]
g eR SEER EXTENT OF PROPOSED FOOTPATH
— Oe :
= : : : EXTENT OF ASPHALT PAVEMENT TO BE
: em CONFIRMED WITH CBR & EXISTING
: a PAVEMENT TESTING
: SE
ea = PROPOSED COLOURED (GREEN)
= : eS BIKE LANE - 35m MINIMUM
a — LENGTHLFROM INTERSECTION a EXTENT OF BIKE LANE LINEMARKING
TBE << LINEMARKING
Pn
< SOS Ss
NE SS y
Itesteceatas RS
Sy PROPOSED COLOURED (GREEN)
BN BIKE LANE - 40m MINIMUM
Re LENGTH FROM INTERSECTION
ey
CHANGED Ry
TRAFFIC WS
CONDITIONS EOL
AHEAD
a \ FOR APPROVAL
ROUNDABOUT
AHEAD .
DESIGNED: DATE: CLIENT: PROJECT:
ISSUE ISSUED FOR DATE | DRAWN | APPROVED fISSUE ISSUED FOR DATE | DRAWN | APPROVED G. MANSELL 19/01/11 NORTI
DRAWN: SCALE: CIVIL DRAWING
01 | ISSUED FOR APPROVAL 24/06/11) S.M. S. MANTERFIELD 1:500
Wai) isSueb Fon APPROVAL soroI tem. SURVEY: SHEET SIZE: a4 TGM GROUP wih BSl a H : T R O O N Pry. LTD ° PROPOSED BU N N l N GS NTE
CHECKED: APPROVED: BUILDERS - COMMERCIAL AND INDUSTRIAL WAR E iH oO U S =
1315 Sturt Street
~ Seas no. ox as, wewounte, 3 COMUNEI:NOGSAROAD PROPOSED LINEMARKING AND
T Ph: (03) 5330 8888 vty 30 9001 Tel: (03) 5339 2208 - (03) 5339 3622 =
DATE: DATE: GM ane: tongue ons Fax: (03) 5338 1310 NOOSAVILLE QUEENSLAND DIM ENSION PLAN
steele EaviennectASINZS. (4 Email: [email protected]
9
©) COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF. No.: 4400 02 CE "ECO OF 9 “02
Page 40
Sewer M/H
1ess\,
lid Level RL =
“RETAINING WALL
RETAINING WALL RW1
SCALE 1.200
a
wu
ca
CQ
n
w
Le
a.
2
o
w
ANION YON
OTH
N
LE
TO BE CONFIRMED
ON SITE.
NN ACTUA
NN
SU
—
a
i & Iwi 20 GNI
E53 oso] slif Ovi] vee] evs
-— 5 ee] OCP TEL) VEG 0006
a a ce
ae aso] 40% ose
x
ao OL “az'6i| 00'S
“eee eee
4 “erg f 60°08
3
x
= Se
z ove | aSte
a
a [a _
e ““erel| G0'SE
= arall eee
ee L Qo ed anderen |
2 OSH} —BTT] «OOTY BOG] 90'OL
i
ae a ~ ~ Jee fe
-— oo} Sz} SSL} OGL] OS L9
j
a rs i rT eSel LSE] DOG) 00 S9
es. nan. _ J erennsacseeen — 7 —f ef ee
oo] sszf ays} seer] 059
Qo - “| “oos:| ssz] veR} zee} 009)
Ss
iz
3 ee | “ors! O92] een] Bee] OF1S
2
S ———3. | ene err
2 ez very G9'Ss
Ss
oO
a FR le —— woe}
— ovst| 98z] sar} seat] as‘zs
— ee P ol'sh] 99 eo] FLT ONS]
- Pe POrsiy Teeth eee] ors] OSLA
>
a
are vod — — a a
ws Ors Lez Sé°St svaL} 00's”
3
<=
Ue
cen see cen wee ff
> ory Lz) w'sk} ES} OSz4
2
~ —_— [rs on ors] Bz] ess] Zr'elt oeo4|
a
og} 962] esi] exe] asee
4
= oon] aE, BAP WAL ease
seventeen on 3 Sou he nen an neem fn ener
= i ov] ze] Vea) oui” ose
on co | eae
woe
~ — ornT yezt eon] ese] os‘ez
~ a Porat ice tsa
Qa
—_——— {——-—n. peer arene eed tee te ere fm --|
-— oat eszp ost soul oszz
a =" . . |
-—— ova VE, CFG Es OL} d00z
we eee nee ere fee ane a &. a wrenend a nyt ce rend ee nme ow we
-— Orel Fey EET 9S
————h one fo fp ef
a over! sez} seat] 62 9if O'S:
~ = are) eet] arn} wap eee
ao 3 | - —
-—— i Orel GOO
ce pe |
-—— { sve] ost) tee, avail ose
©
cen narra nn _—-———. 4 a
ed sve} vt oes
ween ;——-—N. ~ — ef fe ] ] -.
a over] DEL USL] eB] Ose
=
TF , oer] ITY OSE] Say 0
TVA 40 LUVES ve * :
= a
olztletlalta
f & z 5 5 ~ 8
# E;a]2ials
> ¢ e/sie/s)2|2
f 2 > a a a = Ss
\ Y e Ww = ao uw uo
S = 4 3 = x= oS “4
if oa Zz a ~ 2 a z
\ Z/sSs]{[a,]zZz2 3] s
\ = & c ic e =
SCAL
420
— NA Ps
a
”
RETAINING WALL ELEVATION RW1
ALE 1200
SC
ISSUED FOR APPROVAL
STRUCTURAL DRAWING
‘NoRTI
Oo
80 TITLE:
RETAINING WALL RW1 DETAILS
ORAW
ISSUE: 0. 4
SHRET: RO1
4400-01
IGNREF. No:
PROPOSED BUNNINGS
WAREHOUSE
EUMUNDI-NOOSA ROAD
NOOSAVILLE
QUEENSLAND
a
~ 2
YE
mt gs
b+ Be
486
heel 3g
48
bei 58
es
$=
. 8s
<6
Ex 38
5a
fy 28
23
35
7, ws
Z, 8
QO
aR
Os
#8 3
= :
Mm Seek
gRxas
E Agee
ZRES
. sane
a2oR
Suze
may Og EE
5
Bato _
3 E
5588 26%
PEG? Zan
asl Gee
a2 HL EEE
> of SES
Go S88 eP"r
& “8S ese
oO Deg
= <
6
rE
APRIL 2011
AS SHOWN
B
DATE:
SCALE:
i
Ze
SHEET S!
DATE:
K. BENNETT
T.FINLAYSON
© 2G 1
0A
G) COPYRIGHT TGH GROUP PTY. LT
OATE T baaw APPROVED UESSONED:
ISSUED FOR
| CRAWH [APPROVED] ISSUE
T
DATE
oRcett |
|
120611
3.05.1
25.071
g
ws
@| es
&|s
Ble
By
Z
SS,
PRELIMARY DRAWINGS
ISSUE
a
ea
03
0
Page 41
03
REV:
9
EC4"
SHEET:
4400-02-CE
TGM REF. Nox
NOTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS.
WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE
MINIMUM COVER.
EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m
FOOTPATH (TYPICAL)
/ -3% —
|
|
~—
I
F
DATUM RL_ 20.0 !
DESIGN
20.704
20.875
EXISTING LEVEL
21.148 [20.950
21.003 [21.025
21.005 [20.875
21.004 {21.025
21.006 421.006
OFFSET
-15.083]20.808 [20.808
-15.029|20.806 120.754
-13.029|20.711
-11.529 {20.569 120.667
-11.419 [20.554 |20.667
-11.079 ]20.553 20.597
-1.645 |20.916 |21.025
-1.580 [20.919 }21.025
-1.805 {20.911
0.000
1.679
1744
1.904
2.035
CH 94.049
EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m
25% -3% sa
|
|
|
[|
|
|
|
|
|
DATUM RL_ 20.0 d
DESIGN
20.906
21.333
EXISTING LEVEL
21.224 [21.258
21.087 {21.333
21.088 {21.333
21.090 421.183
21.093 [21.093
OFFSET
-15.295]20.929 120.929
-15.025]20.909 121.064
~13.025]20.753 121.014
-11.525 |20.592 |20.976
-11.415 [20.575 120.976
-11.075 [20.581
-1.829 [20.991 }21.183
-1.669 [20.998 [21.333
-1.604 [21.001
0.000
1.663
1.128
1.888
2.069
CH 80.000
EXISTING WATER MAIN
EXISTING WATER MAIN
[es COVER UNDER ROAD 1.2m MINIMUM COVER UNDER ROAD 1.2m
2 2% y= ee oof
DATUM RL 20.0 | 2
infen|]} ee at St Sta [st [St] DO ]O1CO}D hola
DESIGN SIS]E] Seto HIZISINIZa|e oo for on feR [S/S
cfHK]o] Clol|o Sele [|| | DICOlOlK}—
MINI NN NUIANIN SII IN JON IONIC GUANA IAN INN
urln|S] Glieia QIS Isis lele|s RBIOININ
EXISTING LEVEL SOIR) Shela B\A|SIRIS|S|S =Eleles\s
cle ]o] Clol|o DOlK JK JK [eK |e efele fe [Kl
GYAN TN SIAN NINN IN IAIIAIN GUN IN IN IN IN
Ia |
OFFSET wlalm| LISI SIRBISSISks SIRBIRAIS
SYS) S=|S|= HlHl—|e ols jo SIE ISA
tPada tpada PrP pr fol ele J ee ee
EXISTING WATER MAIN EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m MINIMUM COVER UNDER ROAD 1.2m
—_— — — SL 31% —2 8% — ),——
25% Bet yp 25%
DATUM _RL_ 19.0 8 2
DESIGN Rial AL SS | ColealesIe| = Slats PAS eS [oa foe
SIS] ao] Ofolo slololo slolo Slololololo
NIN ON MINN GISION IGN ASIAN GIN IOIONIN ION
Him} co] Ajulio X10 |m In {un tal lun mela lar|m ro
EXISTING LEVEL Rie] Bl RR SERS) sige ARBRE
DIO] S| GDJolo DIolo|o clJ—| Sele l[K lola
SINT NS NIN INS NUNIANIN NISIN GUN IAIN IN IAS
Blin} unt Wluniin
SIS! Sl Figie mimlSlo —|ro}.0 BS\Sieieieh
OFFSET Slal ml alle emis] SIS ATR [bela |™
She S| wilaifai SPIRE
ISSUE ISSUED FOR DATE | DRAWN | APPROVED JISSUE ISSUED FOR DATE | DRAWN | APPROVED] CESIGNEO: G MANSELL DATE: 19/01/11 CLIENT: PROJECT: CIVIL DRAWING
DRAWN: SCALE:
01 | ISSUED FOR INFORMATION 1/0} SM S. MANTERFIELD HOR 1: 200, VER 1:100
02 | ISSUED FOR APPROVAL 26/06/11 SM. SURVEY: _ SHEET SIZE 44 TGM GROUP Pty Ltd ESN H. TROON PTY. LTD. PROPOSED BUNNINGS
CHECKED aDPROVED Ballarat G ALUMINIUM AND STEEL FABRIGATORS WAREHOUSE DRAWING TITLE:
03 | ISSUED FOR APPROVAL 29/07/11] SM. ° & . - 1315 Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL
& ~ ISS no. oox se, wewoutt, 20 EUMUNDI EAST CROSS SECTIONS
Ph: (03) 5330 8888 g.awiso.g0ot Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD
DATE: DATE: Web: tgmgroup.com ons ASINZS 4801 Fax: (03) 5338 1310
A.B.N. 11.125 568 461 EnicnretASINZS 14001 Email: [email protected] NOOSAVILLE, QUEENSLAND
C) COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF. No.: 4400 02 CE “"EC4 oF 9 REV:
Page 42
03 REV: EC5 9 SHEET: 4400-02-CE TGM REF. No.: EXISTING WATER MAIN MINIMUM COVER UNDER ROAD 1.2m EXISTING WATER MAIN UNDER ROAD 1.2m EXISTING WATER MAIN MINIMUM COVER UNDER ROAD 1.2m — MINIMUM COVER 3.3% 3.3% \ nee TS 3% gosh) 33% a SN _ DATUM RL_ 18.0 x | a+] mie |e ma|mimfoo| mimiar 0 |00 Joo | \O —_ mir |Oo BOIMIMILN COIN | CO oO |mt Jt [r~ Sar} KK] Alain DIRNIRIN| Kalo Dlx lor lox Qe} SS] Hefei cfefel[e}| jefe Sle lH le oOl|— .o} alti olol~l|o ~ rm |un | Min} MA] BSlialm =I\>t a EXISTING LEVEL Im) A] Siele Seiele| Sle SSIS [5 ala] Saale e\elele| siele ao} |e MIa S| olClo NA, AL AMIS DyjoO|n Sloln|~ OFFSET Se ey Seis Amials| SSS sear eI] a) sate wlslale| Slaps aleale ! 1 1 ! ! ! 1 ! tio MIO IN i | | ho 33% 133% \ 2% = as Sp I - SS SSS ~ 5 DATUM RL_ 18.0 L DESIGN ~]S) SC} AAI Rjejefes| alate tal alg] ¢] eigic gie|ele) eigie gle PIB! MI alailo OInIOlsF} miolst 00 |o. No QAIiQ|eS a MIN EXISTING LEVEL =a] &] SIE RJefa]S] 53 es |63 GIS QI} S} SISIQ ASISIR]} sieje a|e O(S} 2] o|(Plo olola OFFSET mis] <6) LSIR Seis] xigis RR Ro) al aad sd (sc) Alas] SAIe Se | yim [iA ciled 1 t ! 1 1 1 1 t jo GIN IN —\|— EXISTING WATER MAIN MINIMUM COVER UNDER ROAD 1.2m CO Oo > Oo Oo FOOTPATH (TYPICAL) OTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS. WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE MINIMUM COVER. i ee EXISTING WATER MAIN 25% > Le BK MINIMUM COVER UNDER ROAD 1.2m EXISTING WATER MAIN MINIMUM COVER UNDER ROAD 1.2m 338k 33% EXISTING WATER MAIN — 3% 3.3% N aa 25%/ 22% 3 3% 7.5% / MINIMUM COVER UNDER ROAD 12m — ry = = DATUM RL_15.0 . < HtIOP OS] NIN C9 JOO|OO Irn] O10 lao © lq a9 |\0 JO = o|o o|o (LIS DESIGN mie] S] SIR Blaise] Slee Ao foe IR DATUM RL_17.0 faoe) DIO alZ] F<} sigie FAIS] SAIS Sejejejz —-| el alele clelolial clelo alslSlesleo oO ML AIAN Soir} wins WIAA |ia|o EXISTING LEVEL mlx] S] Rial ANNO] RRR SEIAIR IR X} a] Klar} a|S|sle} sisi Box }os oxox SIS] SF] aiala SISleSle] alala Bax ]or Joo |r Sie] B] Sisis SISlKlo} ulelo Slalo lee EXISTING LEVEL ~| SEIS foo |eo|ao] AEN AIRIRIRIN OFFSET wha] a] Aisle alias} SAR oe a] SIRS e\e\e\e| siecle e\e|e\ele ft ' ee thr rfol alnln AIA fe S S| o|\Sle SIJOly wt [st Je | OFFSET * ep IS AIMINIS! m|+t1o SISITISIS CH 60.000 ES Hse Sale he shes EXISTING WATER MAIN ~—— ___| MINIMUM COVER UNDER ROAD 1.2m CH 140.000 _ 25% 2.3% EXISTING WATER MAIN EXISTING WATER MAIN 25% ~— — ——_=3% = pS —— 3% 2.5% _/ MINIMUM COVER UNDER ROAD 1.2m MINIMUM COVER UNDER ROAD 1.2m 4 ey __ EXISTING WATER MAIN ™ — 3,39 % MINIMUM COVER UNDER ROAD 1.2m > 25% > 3 a =< ee ° N\ =_—_— Oo ° ° ~~ 4 — DATUM RL_ 16.0 DATUM RL_ 17.0 TIS] SO] NININ NIN |] > NINIS MIM | |o [oO C\a SI mlmImM AIM [t) AID] Rn a DESIGN SIS} &] SIR Sleeis aIF\8 SICK DESIGN tals] SB] Shela HIRIS (S| Kiel a alc] ¢} eiele glS|s/S SIS|S eieieie\e az} ef] igi eeiele| sels z sl} wt] SIS po Darla] ro tlolx= ON] lin Colm] st} Sit fis mle—ImIa} m}—|io - LISIS] eS |e = ~ > Ox EXISTING LEVEL he} FS] Sisis AINA] Sle|s Rlaleeols EXISTING LEVEL infal MAIS Slalape| oxfelx a s|o] 3] slolo Slololo slo|o alala laos ojo} S| Solo DBIBIAR|R| Wlax}ox a NIN NS GNI MII | ON NIN IN — |] [| NIN N NINN [|| —|[—|— =_ olof oS] olelo ole! of olSelo SIS} 2] Slain Solon MICU Talon NIA} Wy Alt So sjsik N OFFSET MIA AP Sfoojin QISlalS lala AMS OFFSET impo} se) els Alalale| LISls A eye} a] ales lala] 2 enjoy iin slog hs los ein) A QA AlAA|e} NI qi thrift oapafa thiftilo mm jon Sa Ie Ie a ee eee rrp rio} AN |N — ISSUE ISSUED FOR DATE | DRAWN | APPROVED JISSUE ISSUED FOR DATE | DRAWN | APPROVED] DESIGNED: G MANSELL DATE: 19/01/11 CUENT: PROJECT: DRAWN: SCALE CIVIL DRAWING 01 | ISSUED FOR INFORMATION 19/01/11] SM S. MANTERFIELD HOR 1:200, VER 1:100 02 | ISSUED FOR APPROVAL 24/06/11] SM SURVEY: SHEET SIZE: 44 TGM GROUP Pty Ltd BSlay H. TROON PTY. LTD. PROPOSED BUNNINGS — CHECKED: APPROVED - Ballarat ALUMINIUM AND STEEL FABRICATORS WAREH OUSE DRAWING TITLE: 03 | ISSUED FOR APPROVAL avom/] SM. : y y ee 1315 Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL Susans va. nox os wewouree 22 EUMUNDI! WEST CROSS SECTIONS Ph: (03) 53308888 a.swig0 9001 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD DATE: OATE: Web: tgmgroup.com onss ASINZS 4801 Fax: (03) 5338 1310 A.B.N. 11125 568 461 — EntounertASINZS 14001 ©) COPYRIGHT T.G.M GROUP PTY. LTD. Email: [email protected] NOOSAVILLE, QUEENSLAND TGM REF. No.: 4400-02-CE SHEET: EC5'9 REV: 03
Page 43
Ww
©]|} PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL
= :
M 4858.14 1080.13 11.54 Ft 4.76780 912.84 ME. Gat 4827.69 932.68 19.12 K1 4854.86 1097.24 ME ul 4853.67 1028.17 14.58 M1 4937.63 969.69 20.40
|| a2 4857.27 1068.09 11.89 E2 4179.15 913.82 ME. ® G2 4827.30 931.44 19.32 K2 4854.23 1096.39 ME. L2 4853.77 1028.84 14.52 M2 494356 970.87 20.45
% AB 4856.40 1056.05 12.44 53 4.79050 914.81 ME. @ G3 4828.45, 930.86 19.49 K3 4853.18 1096.58 ME. L3 4854.43 1029.00 14.57 M3 4949.49 969.69 20.45
Cc] | a4 4857.19 1043.80 43.33 El 4801.86 915.79 49.95 @ Gu 4839.25 933.39 19.50 K4 4851.93 1098.42 ME. L& 4857.24 1027.34 14.88 M4 4954.52 966.33 20.61
©] as 4861.28 1032.21 14.53 ES 4813-19 916.78 19.84 ® G5 4850.05 935.91 19.49 K5 4851.59 1100.61 ME. LS 4859.36 1024.86 15.18 MS 4957.88 961.30 20.59
Uy} | 46 4868.34 1022.16 15.16 FG 4824.54 917,76 19.68 G6 4850.77 936.57 19.39 K6 4851.95 1105.48 ME. L6 4864.65 1017.63 16.02 M6 4959.06 955.37 20.66
5 Al 4877.85 1014.39 16.98 E7 1835.89 918-75 49.58 ® G7 4850.58 937.53 19.28 K7 4852.04 1106.96 M.E. u7 4871.09 1011.40 16.86 M7 4957.88 949.63 20.65
a AB 4889.11 1009.49 17.96 Fg 4839.43 919.12 49.55 K8 4852.19 1108.19 ME. L8 4878.49 1006.36 17.61 MB 4954.52 944.41 20.55
Ag 4901.28 1007.81 18.52 E9 4842.96 919.62 19.53 © SETOUT CO-ORDINATES & LEVELS K9 4852.49 1109.40 ME. L9 4886.65 1002.65 18.19 M9 4949.49 941,05 20.51
A10 4920.22 1007.81 18.86 E10 4846.47 920.25 19.52 © NOTE: SETOUT POINTS ARE TO LIP OF KERB K10 4854.53 1115.86 ME. L10 4895.31 1000.38 18.59 M10 4943.56 939.87 20.49
AN 4928.58 1006.70 19.00 EN 4849.95 921.00 19.53 © Kt 4855.19 1116.27 ME, Ln 4904.24 999.61 18.83 M11 4,937.63 941.05 20.48
. . .E. 4916. 61 . . .
a 9030)=««9826 RE po 49s f5 924751983 oe PT No, EASTING NORTHING — RL SST HST ME is asz0)=«« 9980830 My 90924 «$943 BO
Aly 4948.10 991.52 19.42 EtG 4816.03 904.73 19.61 Lu K14 4855.64 1108.90 ME. L14, 4929.24 996.16 19.47 M14 4928.06 955.37 20.40
AMS 4950.21 987.78 19.64 E45 1813.33 904.54 49.68 > Ht 4855.03 944,34 ME. K15 4855.44 1105.23 ME. LS 4934.50 992.06 19.63 M15 4929.24 961.30 20.44
Ud) | ats 4954.68 983.19 20.11 E16 4810.62 904.58 ME. we H2 4862.35 940.27 19.48 L16 4,938.52 986.73 19.80 M16 4932.60 966,33 20.33
Oo ANT 4,960.83 981.42 20.20 E47 4193.88 905.98 ME. O HB 4870.71 940.84 19.47 SETOUT CO-ORDINATES & LEVELS | w 4.939.041 985.15 19.85
ey | 48 4968.28 981.72 20.28 E18 4186.23 906.31 ME. S fe aeons jean tp NOTE: SETOUT POINTS ARE TO LIP OF KERB tne 1940.08 78599 19.88 SETOUT CO-ORDINATES & LEVELS
|| 49 4975.64 982,93 20.41 E19 4778.58 $06.03 ME. Hs 4892.3 347.44 19.59 L19 4940.11 983.42 19.89 NOTE. SETOUT POINTS ARE TO LIP OF KERB
° 21 1989 60 98800 078 a £768.42 20.24 me. S HT 4904.82 952.44 19.73 it tyre sada 1098
eo ' H8 4909.65 956.10 19.83 PT No. EASTING NORTHING = RL : :
A22 5000.57 993.55 20.97 _ F . . 0. L22 4925.53 976.79 19.86
+ A23 501151 999.10 20.89 SETOUT CO-ORDINATES & LEVELS ju H9 4913.88 960.43 19.89 123 4924.58 976.60 19.83
A24 5022.44 1004.65 20.63 NOTE: SETOUT POINTS ARE TO LIP OF KERB <x H10 4917.47 967.20 19.81 N 4852.30 1002.10 . L24 4923.92 977.30 19.80
3 A2S 5033.38 1010.21 H11 4917.97 974.84 19.61 N2 4851 nN 1001 64 . L25 4921.27 983.72 19.57
= || a26 5040.08 1013.49 PT No. EASTING NORTHING = RL O H12 4915.31 982.02 19.35 MS feeno7 toon ’ 126 4916.98 989.17 19.34
= ® H13 4909.94 987.48 18.96 No 4850.08 1002.19 . L27 4911.37 993.26 19.11
—+ SETOUT CO-ORDINATES & LEVELS | » 4161.96 og me taeee, coven feos NS 4849.59 1002.80 - 138 i30t 86 39466 re.
NOTE: SETOUT POINTS ARE TO LIP OF KERB f2 4773.51 32.16 HI6 4883.85 995.29 17.96 "e poten eee, . 130 4,883.18 100106 18.01
F3 4,783.08 912.19 . . . N7 4852.43 1007.57 - ; S .
FA 1186.65 911.73 HIT 4878.00 997.59 17.58 NB igss74 wont - 31 4875.71 4004.57 11.42
PT No. EASTING NORTHING RL re i79081 on121 Ht18 4872.42 1000.50 17.18 No 4856.48 1011.78 . L32 4868.97 1009.15 16.72
6 4:195.00 ott27 49.97 H19 4867.17 1003.97 16.76 N10 188737 1912.10 : 133 4862.93 1014.69 16.00
Bt 5113.93 1038.78 M.E. E7 419799 91152 19.95 H20 4862.64 1005.16 15.68 Nu 4858.22 101169 - L34 4857.19 1021.08 15.30
‘ . , 58.55 1002.89 15.39 ‘ "
B2 5098.96 1031.51 MAE. F8 4814.92 913.87 19.88 Ha 48 N12 4858.58 101130 -
B3 5083.99 1024.23 MAE. F9 4829.02 916.21 19.84 ne teeny eran we NB 4858.90 4010.41 - SETOUT CO-ORDINATES & LEVELS
Ba 5069.03 1016.95 we F10 4830.70 916.52 19.83 - - — N14 4858.50 1009.56 - NOTE: SETOUT POINTS ARE TO LIP OF KERB
BS 5054.06 1009.67 E. FM 4832.37 916.88 19.83 _ N15 4857.77 1008.89 -
Be £039.09 4002.39 Me - een oie 73 SETOUT CO-ORDINATES & LEVELS Nig ere O08 71 ° ©
B7 5024.12 995.12 M.E. FB 4873.94 926.61 19.19 NOTE: SETOUT POINTS ARE TO LIP OF KERB
B8 5013.91 989.95 28 Ftd 4894.72 931.48 19.89 SETOUT CO-ORDINATES & LEVELS
B9 5003.79 984.84 1,22 FAIS 4915.51 936.34 20.10
B10 1,993.68 979.73 21.07 6 1.920% a 215 NOTE: SETOUT POINTS ARE TO LIP OF KERB
Bil 4987.21 976.86 20.89 FAT 4,926.07 938.03 20.21
Bt2 4980.48 974.66 20.71 F18 4926.92 938.67 20.22
B13 4973.56 973.15 20.58 FA9 4926.11 939.71 20.23
B14 4966.52 972.35 20.51 F20 4,923.14 944.78 20.26
B15 4961.67 972.04 20.48 F2i 4921.06 950.62 20.25
B16 4960.81 971.43 20.48 F22 4920.35 951.38 20.24
B17 4960.98 910.39 20.46 F23 4919.21 950.95 20.22
B18 4964.20 965.53 20.45 F24 4913.81 945.99 20.13
B19 4966.09 960.01 20.47 F25 4907.75 941.86 20.03
B20 4966.83 959.24 20.48 F26 4901.14 938.67 19.95
B24 4967.84 959.58 20.48 F27 4894.14 936.48 19.88
B22 4972.29 963.99 20.52 F28 4878.41 932.79 19.83
B23 4977.55 967.39 20.60 F29 4,862.68 929.11 19.80
B24 4988.95 973.16 20.89 F30 4846.96 925.43 _ 19.78
B25 5000.34 978.92 21.15 F34 4831.23 921.75 19.81
B26 5011.74 984.69 21.23 F32 4829.12 921.42 19.81
B27 5025.8 991.81 ME. F33 4828.20 921.15 19.82
B28 5040.48 999.45 ME. F34 4814.17 918.81 19.88
B29 5055.15 1007.09 ME. F35 4197.44 916.49 19.95 Lw
B30 5069.83 1014.74 ME. F36 4782.57 915.25 20.02 >
B31 5084.50 1022.38 M.E. F37 4167.11 914.01 20.08 ~
B32 5099.17 1030.03 M.E. ow
ps3 sas 05767 SETOUT CO-ORDINATES & LEVELS
SETOUT CO-ORDINATES & LEVELS Nove: setout Points ARE To LIP OF KERB 2
NOTE: SETOUT POINTS ARE TO LIP OF KERB = py PT No. EASTING NORTHING RL
PT No. EASTING NORTHING RL Lu or " 4841.65 995.73 ME.
x 2 4844.52 1003.87 15.46
ct 5007.67 972.69 20.95 Oo I. peice ‘oieee 5.41
(2 5001.09 968.83 20.82 +5 016.68 15.17
C3 4994.51 964.98 20.65 Q 5 4850.40 1022.63 14.69
Ch 498753 96113 20.46 _I 16 4847.82 1028.16 14.23
cs 4981.35 957.28 20.27 oO 1 4845.93 1033.98 13.75
ise igh 5 warms
C7 4974.60 950.64 20.17 : : :
C8 4973.00 948.01 20.13
09 4,969.98 941.25 SETOUT CO-ORDINATES & LEVELS
C10 4968.75 933.96 PT No. EASTING NORTHING RL NOTE: SETOUT POINTS ARE TO LIP OF KERB
cn 4969.37 926.59
C12 4971.80 919.60 D1 4,965.04 92159 - PT No. EASTING NORTHING RL
D2 4964.73 920.85 -
SETOUT CO-ORDINATES & LEVELS D3 4963.97 921.07 - yn 4848.25 1053.82 M.E
NOTE: SETOUT POINTS ARE TO LIP OF KERB D4 4960.60 925.63 - J2 4848.30 1054.28 M.E.
DS 4956.64 929.69 - 3 4848.44 1054.73 ME.
D6 4956.44 930.21 - Jk 4851.08 1061.16 M.E.
D7 4956.75 930.67 - JS 4851.78 1061.52 ME,
® neoooctre— 08 4959.02 932.02 - Jé 4852.24 1060.89 ME.
=— @— b9 4961.14 933.57 - J7 4852.07 1058.64 ME.
ag D10 4962.13 933.73 - 38 4852.01 1058.25 M.E.
on 4962.76 932.95 - 39 4851.89 1057.87 ME.
fa b12 4963.64 927.32 - J10 4849.38 4051.75 M.E.
SS ss
@ ® OOO D13 4964.22 924.42 mM 4848.70 1051.39 ME.
NOTE: PEDESTRIAN RAMPS TO BE CONSTRUCTED AT A GRADE OF 1 in 14 AND PROVIDED Jt 4848.22 1051.99 ME.
WITH BLACK COLOURED WARNING TACTILES (300x300x40 CONCRETE PAVER) CAST SETOUT CO-ORDINATES & LEVELS
TN PeRFeTBiAte Caneaine SOINTS WITHIN THE WEBlaNe ASL AMES Must BE NOTE: SETOUT POINTS ARE TO LIP OF KERB SETOUT CO-ORDINATES & LEVELS
CONSTRUCTED AT ROAD SURFACE LEVEL NOTE: SETOUT POINTS ARE TO LIP OF KERB
a y)
| }
i} . a . |
| FOR 1]
| ST | i
i
& a
ISSUE ISSUED FOR DATE | DRAWN | APPROVED ISSUE ISSUED FOR DATE | DRAWN | APPROVED] DESIGNED: ~G MANSELL DATE 19/01/11 CLIENT: PROJECT: NoRT
DRAWN: SCALE: CIVIL DRAWING
01 | ISSUED FOR INFORMATION 19/01/11] SM. S. MANTERFIELD 4:500
02 | ISSUED FOR APPROVAL 24/06/11] SM. SURVEY: SHEET SIZE: 4 4 TGM GROUP Pty Ltd BSlex H. TROON PTY. LTD. PROPOSED BUNNINGS
— TEED. APPROVED p Ballarat © ALUMINIUM AND STEEL FABRIGATORS WAREHOU SE ORAWING TITLE:
03 | ISSUED FOR APPROVAL 29/07/11) S.M. * & ; 1315 Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL
—~ Ballarat, VIC 3350 P.0. BOX 84, WENDOUREE, 3355 EUMUNDI NOOSA ROAD KERB SETO UT CO-ORDINATES
T Ph: (03) 5330 8888 a Tel: (03) 5339 2208 - (03) 5339 3622 -
DATE DATE: G M A BIN 1 t3e oe ae onary Fax: (03) $338 1310 NOOSAVILLE QUEENSLAND AND LEVELS
eBANe Ervirormeet Email: [email protected]
9
(c) COPYRIGHT 7.G.M GROUP PTY. LTO. TGM REF. No.: 4400 02. CE "ECE OF 9 “03
Page 44
“O4 a ™~ oO Us uu Q 8 } Se z — we ha STORMWATERER1-EP6 A \ CH 53\76m re?) RL. 17/64m | N ~~ fo Lk —~. STORMWATEREP2-EP7 GH 98.36m Yy VERT RL. MQ.44m N\ — NK N ~~ a = oe IP ELEV = 18.261F STA =83.00 IP ELEY = 12.0SIP} STA =150.00 | GRADE CHANGE = -0.32 K] =4.79 K =6.54 30m N.C. 50m_V.C. -3.0% -9.3% -1.6% DATUM _10.00 CUT + 5 5 x sO a 2 al 2 | 8 5 2 o a on FILL - 9 7 ¢ 5 4 a a7 a F F F 9 a 3s a DESIGN TOP OF KERB 2 2 wl al 2 foo (LEFT SIDE) ca 2 2 2 =| = 4 4 DESIGN PAVEMENT “ ‘A goog as 5) al a 2 a 3 4} 3 % LEVEL - CENTRELINE & g gy x x Z| 2 o| = | a 4 cs} oc = DESIGN TOP OF KERB ~ x wl lo =| 2 2 2 a (RIGHT SIDE) 2 2 e = 4 2 =| = 2 3 = EXISTING SURFACE o eS x x a of x a] 2 s| 2 ra = on al oon _ LEVEL g x 4 2 4 2 2 a a S a = es} = = LONGITUDINAL SECTION GATEWAY HORIZONTAL SCALE 1:500 VERTICAL SCALE 1:50 ( | '} | OR APP | 'e - a J ISSUE ISSUED FOR pate | oRAWN | APPROVED [ISSUE ISSUED FOR pate | orawN | APPROVED] OESIGNED: G MANSELL DATE: 19/01/11 CLIENT PROJECT 26/06/i| SM, DRAWN: ¢” MANTERFIELD SCALE HOR 1: 500, VER 1:50 CIVIL DRAWING 01 | ISSUED FOR INFORMATION 41 SURVEY: SHEET SIZE: a4 —=. TGM GROUP Pty Ltd 6) H. TROON PTY. LTD. PROPOSED BUNNINGS Ballarat ALUMINIUM AND STEEL FABRICATORS ORAWING TITLE: CHECKED: ‘APPROVED: Ge, urt Stree BUILDERS - COMMERCIAL AND INDUSTRIAL nT @ vo soc e vetoomts 22 WAREHOUSE GATEWAY DRIVE LONGITUDINAL Ph: (03) 53308888 —ganisocoot Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD DATE: DATE: Web: tgmgroup.com ‘Hts ASINZS 4801 Fax: (03) 5338 1310 SECTION () COPYRIGHT T.G.M GROUP PTY. LTD. A.B.N. 11.125 568 461 — Enivonmort ASINZS 14001 Email: [email protected] NOOSAVILLE, QUEENSLAND TGM REF. No.: ‘SHEET: 4400-02-CE EC7'9 REV: 01
Page 45
01 REV: 9 EC8~ SHEET: 4400-02-CE TGM REF. No.: ot DATUM 11.00 10.00 3008RCP 3006RCP 300¢RCP 300BRCP RRJ 300RCP RRJ PIPE SIZE AND GRADE G=10% 1 in 10 G=10.27% 1 in 9.73 G=2.05% 1 in 48.78 G=1.69% 1 in $9.17 G=2% 1 in SO tANA B/S QS S|S % 3/8 & |= |= s|o |< = =|- = DEPTH TO INVERT a|z RIS SIA xz S ale S DESIGN INVERT LEVEL = *|> =|2 ele BIE 2 aa o 4 tm 5 g g a S * wy 3 2° s 3 3 DESIGN SURFACE LEVEL “~ . - © & 2 ~ 3 * a & 6 8 B CHAINAGE & LENGTH “ 30.31 & 20.64 R 18.97 % 52.69 S 16.83 “ — — i 1 | } | | ISSUE ISSUED FOR DATE | DRAWN | APPROVED |ISSUE ISSUED FOR DATE | DRAWN | APPROVED | [ESIGNED: G MANSELL DATE: 19/01/11 CUENT: PROJECT: aaa NoRt 01 | ISSUED FOR APPROVAL 24/06/11] SM. DRAWN: ¢ MANTERFIELD SCALE: HOR 1:500, VER 1:50 CIVIL DRAWING save FETS TGM GROUP Pty Ltd H. TROON PTY. LTD. | PROPOSED BUNNINGS —_ BSI : Ballarat G ALUMINIUM AND STEEL FABRICATORS DRAWING TITLE: CHECKED: APPROVED: Ge ~~ oe . BUILDERS - COMMERCIAL AND INDUSTRIAL , Sut susie © na pox ot, wewoee, 2 WAREHOUSE DRAINAGE LONGITUDINAL SECTIONS TGM Ph: (03) 5330 8888 aaa 80 901 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD Web: tgmgroup.com oss AS/NZS 4801 Fax: (03) 5338 1310 A.B.N. 11.125 568 461 emvtonmertAS/NZS 14001 Email: [email protected] NOOSAVILLE, QUEENSLAND — DATE: DATE: () COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF. No.: 4400-02-CE "ECB OF 9 01
Used in these records
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.