05
REV.
9
EC2°
SHEET:
4400-02-CE
TGM REF. No.:
NOTE: THE CONSTRUCTION CONTRACTOR IS TO BE AWARE OF AND ALSO
IMPLEMENT ALL RELEVANT PROCEDURES IN ACCORDANCE WITH
SUNSHINE COAST COUNCIL DEVELOPMENT APPROVAL DETAILS.
NOTE: THE TOTAL REQUIRED PAVEMENT THICKNESS MUST BE BASED ON THE DEPARTMENT OF MAIN ROAD'S PAVEMENT
DESIGN MANUAL USING SOAKED CBR TESTS OF THE SUBGRADE.
THE DESIGN PAVEMENT THICKNESS, TOGETHER WITH CBR TEST RESULTS MUST BE SUBMITTED TO COUNCIL’S CHIEF
EXECUTIVE OFFICER (CEO) FOR APPROVAL PRIOR TO PLACEMENT OF PAVEMENT MATERIAL
Lid Level 8.31 =
IL 5.60 Lid-tevel 8:64
: IL 6.440
NOTE: THE LOCATION OF UNDERGROUND SERVICES SHOWN ARE
INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR
CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATION OF
UNDERGROUND SERVICES PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION WORK. ANY CLASH OF WORKS WITH A SERVICE IS
TO BE REPORTED TO THE ENGINEER IMMEDIATELY. THE
CONTRACTOR SHALL ENSURE THAT ALL SERVICES ARE FULLY
PROTECTED DURING CONSTRUCTION, ANY SERVICES DAMAGED
DURING CONSTRUCTION SHALL BE REPAIRED AT THE
CONTRACTORS EXPENSE.
NOTE: ANY SERVICE THAT NEEDS TO BE ALTERED AS PART OF THE NEW
ROADWORKS SHOULD BE DONE SO IN ACCORDANCE WITH THE
SERVICE AUTHORITY GUIDELINES.
CONTRACTOR TO NOTIFY THE SERVICE AUTHORITIES PRIOR TO
ANY WORKS COMMENCING.
NOTE: REFER SHEET EC9 FOR SIGNAGE AND LINEMARKING DETAILS
NOTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS.
WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE
MINIMUM COVER
SP114181 UR
-| GEOMETRY
508
NEW FOOTPATH TO. TL
MATCH EXISTING
NOTE: ISOLATION VALVES TO BE INSTALLED ON EXISTING WATER MAINS.
COUNCIL ENGINEER, UNITY WATER AND CONTRACTOR ON SITE
POSITIONS OF ISOLATION VALVES TO BE LOCATED EITHER SIDE OF PROPOSED
ROUNDABOUT. FINAL POSITION 70 BE CO-ORDINATED WITH SUNSHINE COAST
VEGETATION CLEAR ZONE FROM OVERHEAD POWER LINES
LIMIT TREE REMOVAL IN ACCORDANCE WITH COUNCIL
INSPECTION AND IN PRINCIPAL AGREEMENT FROM SITE
MEETING ON 22/06/11
EXISTING SIDE ENTRY PIT TO BE MODIFIED.
MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL
Ni)) \\> ~~
PATTIE é
MATCH EXISTING PAVEMENT LEVEL &
fs
A
a
~ VW
~ MATCH EXISTING PAVEMENT
LEVEL & GEOMETRY
2 a i, )
PN \ ) /
.00 N ! A
S
Ves
aS wf | de Le
SY (MATCH EXISTING PAVEMENT.
{ “LEVEL & GEOMETRY a
~ MLSS —-
ep NER ; <%
Zs
A MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL
/
| -\_- PROPOSED BUNNINGS SITE
$P211687
“Z-RETAINING WALL. DESIGN BY OTHERS
REFER STRUCTURAL DRAWING
4400-01 RO1 FOR DETAIL
=€P3
¢
80
Metal storage sheds
SRN
f
26
SP151406
2
SP131406
SPN *
x we
Metal storage sheds
7
RP1355064
Street Sign
RRR
f
o ‘6 gro? :
se an
MEDIAN KERB TAPER TO MATCH
BACK TO EXTENT OF WORKS
Ta
RP222164
NEW KERB TO MEDIAN TO MATCH
A EXISTING
0
BUP 13364
foe EXISTING PAVEMENT ALONG 7
EDGE OF NEW KERB & CHANNEL, ne (03723 1 nae
DEE BUP13364
LE Zope RP 131576
co" LEGEND - PROPOSED WORKS
=== DESIGN KERB CHANNEL LEGEND - EXISTING CONDITIONS
2
—— KERB & CHANNEL TO BE REMOVED
g GLecTRiciTy TELSTRA
PIT PIT
CONCRETE PAD SUITABLE FOR A = BERB & CHANNEL "TO BE REMAIN ELECTRICITY
TELSTRA
ff COUNCIL VEHICLE. REFER LANDSCAPE SE ny MANHOLE
hk — ARHITECTS DRAWINGS FOR LOCATION. SEBS EXTENT OF PROPOSED FOOTPATH piLLaR TELSTRA
506 : SS Bouee PILLAR
= XISTING KERB ISLAND POLE TELSTRA
SP114181 oe TO BE REMOVED EXTENT OF ASPHALT PAVEMENT TO BE LIGHT © MARKER
a ey CONFIRMED WITH CBR & EXISTING POLE o FENCE
fee PA ENT TESTING ® ELectRIcITY
RELOCATED WATER MAIN (IN ACCORDANCE SEWER «TREE FIRE
E2000 Sas KERB ISLAND WITH INDICATIVE UNITYWATER PLAN) - TO BE © MANHOLE ; ® HYDRANT
MEA \ E REMOVED CONFIRMED WITH UNITY WATER @ NNspectION @ SHRUB water
] Se BUDM0109 eee PALM MARKER
a ae J jg s LIGHT 7 TREE © BOLLARD
2 t otf EXTENT OF BIKE LANE LINEMARKING y 1
awl RAFFIC BENCH
oO | ? \ @ SIGN “Sw SSIGN A MARK
= z i /
2 eo — S << LINEMARKING
= i P307631 = ———————— SUBJECT LOT BOUNDARY
Q a Zs es —————__ ADJOINING BOUNDARY
= : : can NO OVERHEAD POWER LINE
a e St vy D\ —eenemomemememenee UNDERGROUND POWER CABLE
5 ee as N 910 2 GAS LINE
S . SEWER LINE
——————_ STORMWATER LINE
& RP 150347 RP150347 STORMWATER EI
DN eee eT Oe er F*"T“€e NRK RVR Na OPTICAL FIBRE CABLE
\ —————_ WATER RETIC
EDGE OF VEGETATION
CENTRE-LINE OF GULLY
CHANGE OF GRADE
TOP OF BANK
BOTTOM OF BANK
19 FENCE LINE
3 SSS WALL
TRANSITION NEW KERB ——————_ EDGE OF BITUMEN
ALIGNMENT TO MATCH RP150347 IL OF KERB
EXISTING KERB ALIGNMENT 902 RP150347 cOMRETE
on PAVING
RP 150345 ~
\ >
\
\ P5 5S
ISSUE ISSUED FOR DATE | DRAWN | APPROVED [ISSUE ISSUED FOR DATE | DRAWN | APPROVED | DESIGNED: G MANSELL DATE: 19/01/11 GHENT: EROJECT —_—__ Nogr!
ss — i H. TROON PTY. LTD. | PROPOSED BUNNINGS ee
02. | KERB ALIGNMENT MODIFIED, ISSUED TO ENERGEX | 08/04/11] S.M SURVEY: SHEET SIZE a4 TGM GROUP Pty Ltd Bola . : .
Ballarat ALUMINIUM AND STEEL FABRIGATORS DRAWING TITLE:
03 | KERB ALIGNMENT MODIFIED, RE-ISSUED TO ENERGEX | 20/04/11] SM. CHECKED: |APEROVED: _ als Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL WAREHOUSE PROPOSED ROUNDABOUT
~ allarat,
04 | ISSUED FOR APPROVAL 24/06/11] SM Dh: (03) 5330 8888 oo Oe ee Nr tray aay EUMUNDI-NOOSA ROAD
ae valiy ISO 9004 Tel: (03) 5339 2208 - (03) 5339 3622 a
0S | ISSUED FOR APPROVAL 29so1/it] SM mi DATE: Web: tamgroup.com oss ASINZS 4801 Fax: (03) 5338 1310
() COPYRIGHT T.G.M GROUP PTY. LTD.
A.B.N. 11 125 568 461
Environment AS/NZS 14001
Email: [email protected]
PAVEMENT LAYOUT PLAN
NOOSAVILLE, QUEENSLAND
TGM REF. No. SHEET:
4400-02-CE
EC2'9
REV:
05
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.