Att 1 - Engineering - RFI Reponse · MCU21/0117.01
23098 - SBSMP/4
Page 13
Figure 5.3 – Post-Development Mitigated Model
5.3.7 Comparison of Peak Flows at Lawful Point of Discharge
The pre-development and post-development mitigated peak flow rates were compared for the
catchment and are shown in Table 5-6 and Table 5-7 below.
Table 5-6 - Comparison of Peak Flows
Pre-Development Peak Flows Post-Development Peak Flows Post-Development Peak Flows
Property State (Un-Mitigated) (Un-Mitigated) (Mitigated)
(m3/s) (m3/s) (m3/s)
50% AEP
(m3/s)
0.035 0.055 0.034
20% AEP
(m3/s)
0.058 0.084 0.048
10% AEP
(m3/s)
0.065 0.094 0.056
5% AEP (m3/s) 0.084 0.110 0.064
2% AEP (m3/s) 0.102 0.135 0.089
1% AEP (m3/s) 0.115 0.155 0.087
Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1 - Engineering - RFI Reponse.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.