Item 4: Provide an updated SWMP which contains additional detail plus revised modelling (as
necessary) to address the following:
i. Revise the pervious initial losses used in the XPSTORM model to be consistent
with ARR DataHUB burst losses.
ii. Provide a figure showing the XPSTORM model layout and describe how surface
areas have been modelled as bypassing the detention tanks in all events and
how flows in excess of Q20 from roof areas bypass the tanks
iii. Undertake an assessment for the 1%AEP event at year 2100 by increasing the
1%AEP rainfall intensities by 20%
Response: The amended stormwater detention design has been remodelled in the Watercom
DRAINS detention modelling program using the Initial Loss Continuing Loss (IL-CL)
hydrological model. Based on ARR DataHUB’s burst losses, the pervious area initial
loss (mm) and the pervious area continuing loss (mm/hr) values used in the model are
32 and 2.6, respectively.
Refer to the updated Site Based Stormwater Management Plan (23098 – SBSMP – Rev
4) showing the post-development mitigated model. With the addition of the 20%
increase in rainfall intensities to address climate change considerations, the updated
modelling has been completed to ensure all flows will be mitigated in the tanks up
to a Q100 storm event.
Please contact me if you have any further queries on (07) 3369 8411.
Yours faithfully,
MORGAN CONSULTING ENGINEERS PTY LTD
Henry Morgan MIEAust CPEng RPEQ 11950
Enclosed: 23098 – SBSMP – Rev 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1 - Engineering - RFI Reponse.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.