Council archive · source document
Att 1 - Engineering - RFI Reponse · MCU21/0117.01
Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
waterways , wetlands or drainage lines
either on or off the site; and
(c) temporary or permanent downpipes are ✓
connected to the stormwater system
before laying the roof; or
(d) localised erosion is avoided by directing
flow from downpipes over non-erosive
areas.
AO14.4 RO14.4
Chemical flocculants used as part of an The proposal complies. Refer to
erosion and sediment control plan do not harm ✓ RO14.1.
the environmental values within receiving
waters.
AO14.5 RO14.4
Appropriately sized litter containment areas, The proposal complies. Refer to
with provision for sorting recyclables are ✓ RO14.1.
provided for the type of litter expected to be
generated onsite.
Wastewater management and effluent disposal
PO15 AO15
Development does not discharge Wastewater (non-sewage) generated from the
wastewater unless it can be demonstrated to development is collected and contained on-
not compromise environmental values of site, and is;
waters and water quality objectives. (a) lawfully disposed to sewer; or
(b) transferred off-site for treatment/disposal
Editor’s Note—Environmental values of to an appropriately
waters and water quality objectives are licenced facility;
prescribed in Schedule 1 of the (c) reused on-site in a closed-cycle irrigation
Environmental Protection (Water) Policy scheme, industrial processes, washing or
2009. cleaning or other purpose; or N/A
(d) treated to meet the drinking water supply
environmental values prior to release.
Editor’s Note—The Plumbing and Drainage
Act 2003 sets out requirements for wastewater
1
Solution: ✓ Acceptable Solution Page 9 of 10
A/S Alternative Solution \\mcedc01\DATA\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
N/A Not applicable to this proposal Job: 23098
Rev: 1
Site Address: 5 Pearl Street, Cooroy 18/03/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1 - Engineering - RFI Reponse.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.