Council archive · source document
Att 1 - Engineering - RFI Reponse · MCU21/0117.01
Page 2
Table of Contents
1 INTRODUCTION .......................................................................................... 3
2 GENERAL .................................................................................................. 3
3 RESPONSIBILITY FOR INSPECTION ..................................................................... 3
4 DATA COLLECTION / STORAGE REQUIREMENTS ..................................................... 3
5 MAINTENANCE PROCEDURE............................................................................. 3
5.1 General .............................................................................................. 3
5.2 Inspections .......................................................................................... 4
5.3 Watering ............................................................................................ 5
5.4 Vegetation Management and Weed Control .................................................... 6
5.5 Validation Water Quality Testing ................................................................ 6
5.6 Equipment Needs .................................................................................. 6
5.7 Occupational Health and Safety ................................................................. 6
5.8 Public Safety ........................................................................................ 7
5.9 Disposal Requirements ............................................................................ 7
5.10 Access Issues ........................................................................................ 7
5.11 Bio-Retention Basin Resetting .................................................................... 7
Appendix A BIO-RETENTION BASIN MAINTENANCE CHECKLIST ..................................... 8
Bio-Retention Basin Operational Management and Maintenance Guideline
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1 - Engineering - RFI Reponse.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.