Council archive · source document
DOC070812 · OPW12/0255
Attached to the e-mail Development Application IDAS Forms 1 & 6.
Pep] | Integrated Development Assessment System form Application details—IDAS form 1 (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary information and documentation will result in your application not being a properly made application. For all development applications, you must: ¢ complete this form (Application details—IDAS form 1) e complete any other forms relevant to your application ¢ provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au Name/s (individual or company name in full) RAwteee TerenceS cts RgigQol For companies, contact name 4 LLISON Wie Postal address ce Sound Booly Core. ?.0.Boy 647 RDoosA WeAds ecb 4Usb7 Contact phone number eo 65413 Sy4cdo Mobile number (non-mandatory) Fax number (non-mandatory) e-mail address (non-mandatory) ali sor @ Sourdbem -comr.av Government Deu e mee me CULTS eit
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 15 pages
Page 2
C material change of use of premises [-] building work me operational work CL] reconfiguring a lot CE] Yes—complete table A and then go to question 5 Table A—name of each local government area in which the mobile and temporary ERA is proposed to operate [A street address/lot on the plan | street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in water e.g. jetty, pontoon) Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the premises Street address Lot on plan description | Local government area Unit | Street | Street name and official suburb/ | Post- Lot no. Plan type (e.g. Logan, Cairns) no. no. locality name code and plan no. 42 [Wit street Doosé HeAts | 56] Application details—IDAS form 1 Version 1.0 18 December 2009
Page 3
OOO Table C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel dredging in Moreton Bay) Coordinates Zone Datum Local government (note: place each set of coordinates in a separate row) reference area (if applicable) Easting Northing Latitude Longitude [_] eDA94 [-] wess, C] other \ tree to be remoed - as por report attached on the Loord om of Mie tennis Court. [A No LE] Yes—complete either table D, table E or table F as applicable Table D Name of owner/s of the land I/We, the above-mentioned owner/s of the land, consent to the making of this application. Signature of owner/s of the land Date 3 Application details—IDAS form 1 Version 1.0 18 December 2009
Page 4
OO Table E Name of owner/s of the land | The owner’s written consent is attached or will be provided separately to the assessment manager Table F Name of owner/s of the land | By making this application, |, the applicant, declare that the owner has given written consent to the making of the application. [iY No CJ Yes—complete table G Table G—state owned resources (provide details for each state resource in a separate table) Nature of state-owned resource Nature of evidence required (tick the applicable box and attach a copy of the [_] Evidence of an allocation of, or an entitlement to, the resource evidence to this form) C4 Evidence the chief executive of the department administering the resource is satisfied the development is consistent with an allocation of, or an entitlement to, the resource LI Evidence the chief executive of the department administering the resource is satisfied the development application may proceed in the absence of an allocation of, or an entitlement to, the resource CL] adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H C on strategic port land under the 7ransport Infrastructure Act 1994—complete table | L] in a tidal water area—complete table | Table H Name of water body, watercourse or aquifer 4 Application details—IDAS form 1 Version 1.0 18 December 2009
Page 5
OO Lot on plan description for strategic port land Table | Table ) Port authority for the lot Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable) Yes—complete table K and submit with this application the yellow local government/ private certifier’s copy of the receipted QLeave form Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B, E, Lor P) E] Yes—please provide details below Name of local government Date of written notice given by local government Reference number of written notice given by local government (if applicable) Application details—IDAS form 1 Version 1.0 18 December 2009
Page 6
Description of attachment or title of attachment Method of lodgement to assessment manager [Mey making this application, | declare that all information in this application is true and correct (note: it is unlawful to provide false or misleading information). Notes for completing this form Question 8: © Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. © Owner's consent is not required for a mobile and temporary ERA. Question 9: ° Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the application. Question 13: © The Building and Construction Industry (Portable Long Service Leave) Act 1994 prescribes when the portable long service leave levy is payable. © The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 14: © The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. ® Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au. 6 Application details—IDAS form 1 Version 1.0 18 December 2009
Page 7
OO Privacy—the information collected in this form will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required by Parliament. This information may be stored in a departmental database. The information collected will be retained as required by the Public Records Act 2002. OFFICE USE ONLY Date received NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To Reference numbers Council. | have been engaged as the private certifier for the building work referred to in this application Date of engagement Name BSA Certification license number Building classification/s QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Description of the work QLeave Project Number Amount paid ®) Date receipted form sighted by assessment manager Date paid Name of officer who sighted the form The Sustainable Planning Act 2009(SPA) is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Application details—IDAS form 1 Version 1.0 18 December 2009
Page 8
Be | Integrated Development Assessment System form Building or operational work assessable against a planning scheme—IDAS form 6 (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) This form must be completed for development applications for building works or operational work assessable against a planning scheme. You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary information and documentation will result in your application not being a properly made application. For all development applications, you must: ¢ complete Application details—IDAS form 1 © complete any other forms relevant to your application ¢ provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. This form can also be used for development on strategic port land under the 7ransport Infrastructure Act 1994. This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au [| building work—complete table A va operational work—complete table B Table A What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering, underpinning, moving or demolishing a building)? What type of approval is being sought? (if you have indicated multiple works in the above question, please use an attachment to this form to detail each approval request) C] development permit | preliminary approval Are there any current approvals associated with this application? (e.g. material change of use) List of approval reference/s Date approved Date approval lapses Government DT CRCa ACS eaten m aC UU Noes
Page 9
ooo Table B What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es) | toad works EC] stormwater im water infrastructure LC] drainage works E] earthworks C] sewerage infrastructure LE] landscaping Cj signage we clearing vegetation under the planning scheme C] other—provide details What type of approval is being sought? (if you have indicated multiple works in the above question, please use an attachment to this form to detail each approval request) wie development permit EC preliminary approval C] both—specify below Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision) a No | Yes—specify the number of lots being created Are there any current approvals associated with this application? (e.g. material change of use) No [_] Yes—provide details below List of approval reference/s Date approved Date approval lapses Confirmation of | Method of lodgement lodgement All applications for operational works site plans drawn to scale which show the following: C] confirmed © the location and site area of the land to which the application retates (relevant land) e the north point e the boundaries of the relevant land ¢ the allotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, building envelopes and existing or proposed open space (note: numbering is required for all lots) 2 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 10
LILO e any existing or proposed easements on the relevant land and their function e any access limitation strips e all existing and proposed roads and access points on the relevant land a statement about how the proposed development addresses the local [__] confirmed government's planning schemes and any other planning documents relevant to the application Applications for operational works involving earthworks (filling and excavating) drawings showing: CI confirmed e existing and proposed contours © areas to be cut and filled e the location and level of any permanent survey marks or reference stations used as datum for the works e the location of any proposed retaining walls on the relevant land and their height © the defined flood level (if applicable) the defined fill level (if applicable) Applications for operational works involving roadworks drawings showing: C] confirmed e existing and proposed contours e the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points e information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) © kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) © edge of pavement where kerb is not constructed e position and extent of channelisation © location and details of all traffic signs, guideposts, guardrail and other street furniture © pavement markings including details on raised pavement markers catchpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert crossings changes in surfacing material z Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 11
OOO Applications for operational works involving stormwater drainage drawings showing: LE] confirmed e existing and proposed contours © drainage locations, diameters and class of pipe, open drains and easements e manhole location, chainage and offset or co-ordinates and inlet and outlet invert levels inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels Applications for operational works involving water reticulation drawings showing: LC] confirmed e kerb lines or edge of pavement where kerb is not constructed e location and levels of other utility services where affected by water reticulation works e pipe diameter, type of pipe and pipe alignment © water main alignments © water supply pump station details (if applicable) © minor reservoir details (if applicable) e conduits e location of valves and fire hydrants ® location of house connections (if applicable) e location of bench marks and reference pegs Applications for operational works involving sewerage reticulation drawings showing: | confirmed © location of all existing and proposed services location of all existing and proposed sewer lines and manhole locations location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) © sewer pump station details (if applicable) Applications for operational works involving street lighting drawings showing: CO confirmed e location of all light poles and service conduits © location of all other cross road conduits e type of wattage and lighting e anytraffic calming devices © additional plans for roundabouts and major roads (if applicable) e details of any variations to normal alignment © details of lighting levels 4 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 12
OOO Applications for operational works involving public utility services drawings showing: C confirmed e any existing light poles and power poles e any existing underground services e details of proposed services e alternation to existing services Applications for operational works involving landscaping works drawings showing: a confirmed e the location of proposed plant species © aplant schedule indicating common and botanical names, pot sizes and numbers of plants ¢ planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge e the location and type of any existing trees to be retained © construction details of planter boxes, retaining walls and fences e the proposed maintenance period e irrigation system details Notes for completing this form: © This form can also be used for development applications for building works or operational works assessable against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to mean the land use plan for the airport land. Privacy—please refer to your assessment manager for further details on the use of information recorded in this form. OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. 5 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 13
Date: 27/07/2012
Client details: Barry Bladon
Tre Cc Report Site Address: 22 Miti Street
Noosa QLD 4567
Tree condition
An assessment of each tree is undertaken by a visual inspection of the tree from the ground.
The inspection is generally limited to visual examination of the subject tree from the ground without dissection, probing or coring unless otherwise
required.
Individual number assigned to each tree
Genus and/or species
Canopy spread of tree measured in meters
Height of tree measured in meters
L=low, M=medium, H=high determined by a range of factors including; rate of growth and general condition of tree
evident by visual examination
Diameter at breast height measured in millimetres(standard arboricultural measurement by which a trees primary and
critical root zones may be estimated)
l=immature, SM=semi immature, M=Mature, OM=over mature, s=senescent
Safe useful life expectancy (see table below)
The primary root zone is best described as being an area around the trunk.(the size of the area is determined by the
The critical root zone is best described as being an area around the trunk.{ the size of the area is determined by the
formula 5 x DBH)
Visual infestations or infections by pathogens or insects, structural faults, relevant size constraints and other relevant
factors noted
Safe Useful Life Expectancy (SULE)
Friske’s Tree Solutions Tree Assessment Form Version 1- 01 January 2012
Page 14
The information derived from the visual inspection of the tree is used to determine the SULE rating. This rating gives an estimate of the expected life span of the tree and takes into account age, life span of the species, local environmental conditions, location, and tree safety. The SULE rating is an assessment of the tree at the time of inspection. This rating may change due to local environmental changes or extreme occurrences such as a storm. SULE Table [1 __| Long= life span greater than 40 years Mediumz=life span from 15 to 40 years |3.___| Short=life span from 5 to 15 years [4 _| Remove= should be removed within 5 years is Small= Young or regularly pruned trees that can be readily removed or replaced Unstable Showing imminent signs of structural failure and or significant trunk damage rendering the tree structurally hazardous and or unstable in the ground and or senescent Melaleuca . Secondary pathogens present Quinquenervia Evidence of Borer Thinning of canopy Adventitious roots present Landscape Significance Rating (LSR) Friske’s Tree Solutions Tree Assessment Form Version 1- 01 January 2012
Page 15
The assessment of the landscape significance of a tree is an essentially subjective process. The landscape significance process used in this report takes into account the following factors; e Whether the tree is in a sound condition e Whether the tree is typically formed and developed for its species Whether the tree has a SULE of more than 15 years Whether the tree is one of the larger and more aesthetically valuable in its locality Whether the removal of the tree will diminish cultural or historical values Whether the removal of the tree will transform the landscape A tree may be identified as one of three categories of landscape significance; H=high, M=medium or L=low Tree Retention Rating (TRR) Based on a combination the tree assessment and the landscape significance rating, the healthiest and most significant trees are rated as a high priority for retention. Rating scale for retention; Significant trees that are worthy of retention=3, unsafe and dying trees or trees not warranting retention=1-0 Myrtaceae, Melaleuca, Quinquenervia Tree 1 has a SULE of less than 15 years and is in a senescent and unsafe condition and is not typically formed for this species Friske’s Tree Solutions Tree Assessment Form Version 1- 01 January 2012
Page 16
Recommendations After inspection of the tree my recommendation would be to remove the tree. The tree is past it’s SULE and is showing signs of stress evident by the thinning of the canopy and the presence of pathogens (fungi). There is evidence of borer and in my opinion Limitations of this report This report is to be used in its entirety only. Any written or verbal submission, report or presentation that includes statements taken from the findings, discussions, conclusions or recommendations made in this report, may only be used where the whole of the original report (or a copy) is referenced in, and directly attached to that submission, report or presentation. Care has been taken to obtain information from reliable sources. All data has been verified insofar as possible, however the author can neither guarantee nor be responsible for the accuracy of information of others. Unless stated otherwise; e Information contained within this assessment covers only the tree or trees that was/were examined and reflects the condition of the tree/trees at the time of inspection and, ¢ The inspection was limited to visual examination of the subject tree/trees either from height or ground level, without dissection, excavation, probing or coring. There is no warranty or guarantee, expressed or implied, that problems or deficiencies of the subject tree/trees may not arise in the future. Friske’s Tree Solutions Tree Assessment Form Version 1-01 January 2012
Used in these records
DOC070812.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.