Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Operational Works Application OPW17-0561 · OPW17/0561

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Department of Infrastructure, Local Government and Planning

DA Form 1 — Development application details
Approved form (version 1.0 effective 3 July 2017) made under section 282 of the Planning Act 2016.

This form must be used to make a development application involving code assessment or impact assessment,
except when applying for development involving building work.

For a development application involving building work only, use DA Form 2 — Building work details.

For a development application involving building work associated with any other type of assessable development,
use this form (DA Form 1) and parts 4 to 6 of DA Form 2 — Building work details.

Unless stated otherwise, all parts of this form must be completed in full and all required supporting information must
accompany the development application.

One or more additional pages may be attached as a schedule to this development application if there is insufficient space
on the form to include all the necessary information.

 

This form and any other form relevant to the development application must be used to make a development application
relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994, and airport land

nder the Airport Assets (Restructuring and Disposal) Act 2008. For the purpose of assessing a development
=pplication relating to strategic port land and Brisbane core port land, any reference to a planning scheme is taken to
mean a land use plan for the strategic port land, Brisbane port land use plan for Brisbane core port land, or a land use
plan for airport land.

 

 

 

Note: All terms used in this form have the meaning given under the Planning Act 2016, the Planning Regulation 2017, or the Development
Assessment Rules (DA Rules).

PART 1 — APPLICANT DETAILS

Applicant name(s) (individual or company full name) Bartho and Son

Contact name (only applicable for companies) Max Bartho
Postal address (P.O. Box or street address) PO Box 670
Suburb Coolum
State QLD
Postcode 4573
“ountry Australia
Contact number 0412710855
Email address (non-mandatory) [email protected]
Mobile number (non-mandatory)

Fax number (non-mandatory)

Applicant's reference number(s) (if applicable)

 

 

2) Owner's consent
2.1) Is written consent of the owner required for this development application?

 

 

L Yes - the written consent of the owner(s) is attached to this development application
KX] No — proceed to 3)
Development Cc inter |

 

 

   

 
  

/ Queensland

Wy Government

    
  
Full text of the other 56 pages

Page 2

Department of Infrastructure, Local Government and Plann

 

PART 2 —LOCATION DETAILS

e 3) Location Ci the premises Cue a 4) oe Dy ae 5 ES ele)

 

Bl Street address AND lot on n plan (ail lots must be listech, or

(J Street address AND lot on plan for an adjoining or adjacent property of the premises (appropriate for development in water
but adjoining or adjacent to land e.g. jetty, pontoon; all lots must be listed).

 

 

 

 

 

 

 

Unit No. | Street No. | Street Name and Type Suburb
12 Park Road Noosa Heads
4) Postcode | Lot No. Plan Type and Number (e.g. RP, SP) Local Government Area(s)
4567 54 RP 52918 Noosa
Unit No. | StreetNo. | Street Name and Type Suburb
C ) Postcode | Lot No. Plan Type and Number (e.g. RP, SP) Local Government Area(s)

 

 

 

 

 

 
    

bse D> Coordinates of premises (appropriate ae COE enneua Miele eles ice fuel a lot orin water.not adoning Gs faecal eee ce 4
channel. Chega in Moreton Bay): :
lle mene Cee aolA eioleh ole ic! Crier (le Oy one set Cicero CE is-required for, this oe

C1 Coordinates of premises by longitude and latitude

 
   

 

 

 

 

 

 

 

 

Longitude(s) Latitude(s) Datum Local Government Area(s) (if applicable)
Owess4
1 Gpag4
(J Other:
L] Coordinates of premises by easting and northing
Easting(s} Northing(s) Zone Ref. | Datum Local Government Area(s) (if applicable)
[54 1] wess4
(55 1 Gpas4
Cs 56 oO Other:

 

 

            

 

g i) /lelitone| eases L

a Additional premises are relevant to this development application and their details have been attached in a schedule
to this application
Not required

 

 

4) identify any of the following that apply fo the premises and provide any relevant detalis_
(J In or adjacent to a water body or watercourse or in or above an aquifer

Name of water body, watercourse or aquifer:

[_] On strategic port land under the Transport Infrastructure Act 1994

 

 

 

 

Lot on plan description of strategic port land:

 

Name of port authority for the lot:
LJ Ina tidal area
Name of local government for the tidal area (if applicable):

 

 

 

 

Name of port authority for tidal area (if applicable):
1] On airport land under the Airport Assets (Restructuring and Disposal) Act 2008

Name of airport: |

CJ Listed on the Environmental Management Register (EMR) under the Environmental Protection Act 1994
EMR site identification: |

 

 

 

 

 

 

 

Page 2
DA Form 1 — Development Application details
Version 1.0—3 July 2017

Page 3

Department of Infrastructure, Local Government and Plann

 

(1 Listed on the Contaminated Land Register (CLR) under the Environmental Protection Act 1994
CLR site identification:

 

 

 

 

: )) Nee any acts CaenG OWiie the eieice

 

| Note: Easement uses vary throughout Queensland. ahd. are fo be. identified ey Elie mets ieee taelceuein ay ence and fae :
Une Elicit jigs elgeyefosscve} development, see DA: imelanilCHieles

EX] Yes — All easement locations, types and dimensions are 3 included i in plans submitted with this development
application
[No

PART 3 — DEVELOPMENT DETAILS

 

Section 1 — Aspects of development

61) Provide details about the frst development aspect

 

C a) What is the type of development? (tick only one box)

 

(CO Material change of use (_] Reconfiguring a lot Operational work (Building work
b) What is the approval type? (tick only one box)
EX] Development permit 7] Preliminary approval (J Preliminary approval that includes

a variation approval

 

c) What is the level of assessment?
Code assessment ol Impact assessment (requires public notification)

d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
lots):

Steel and Timber Terrace

 

e) Relevant plans
Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms quide:
Relevant plans,

EX] Relevant plans of the proposed development are attached to the development application
( 2) Leroy (o(s) details about ules Ceci | development aspect 2 :
a) What is the type of development? (tick only one box)

   

  
   

 

CJ Material change of use (J Reconfiguring a lot (J Operational work (J Building work

b) What is the approval type? (tick only one box)

(J Development permit C] Preliminary approval ([] Preliminary approval that includes a variation
approval

 

c) What is the level of assessment?
(] Code assessment (1 Impact assessment (requires public notification)

 

d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3 lots)

e) Relevant plans
Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide:
Relevant plans.

(1 Relevant plans of the proposed development are aitached to the development application

 

Gy 2) FG tional aspects or Ciencia

(1 Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application

C] Not required

 

 

 

Page 3
DA Form 4 ~ Development Application details
Version 1.0—~3 July 2017

Page 4

Department of Infrastructure, Local Government and Plann

Section 2 — Further development details

 

 

 

Does the proposed development applicatio olVe any of the following
Material change of use (J Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot LJ Yes — complete division 2

Operational work Yes ~ complete division 3

Building work (J Yes — complete DA Form 2 — Building work details

 

 

 

Division 1 ~ Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
Planning instrument.

8.1) Describe the proposed material Change ofuse.

  

Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use {include each definition in a new row) - units (if applicable) area (m?)
(if applicable)

 

 

 

 

 

 

 

 
   

GP) Dees ie deceit lm ilieemeciicnco
(1 Yes
XJ No

 

 

 

 

 

 

Division 2 — Reconfiguring a lot
Note; This division is only required to be completed if any part of the development application involves reconfiguring a lot.

Sep) What is the total number of existing lots making up the premises?

   

ne reconfiguration? (ick eM Eee fee

 

 

 

ml ubdivision (complete 10)) [] Dividing land into parts by agreement (complete 711)
["] Boundary realignment (complete 12)) [1] Creating or changing an easement giving access to a lot from
a construction road (complete 13))

 

 
    

| 10) Subdivision (
yi0-1) For this development, how many lots are being created and ea Seine Malia re ir o)y es fe

Commercial Industrial Other, please specify:

  

   
 

Residential

  

Intended use of lots created

  

 

   
 

 

 

Number of lots created
10.2) Will the subdivision be staged?
[_] Yes ~ provide additional details below
LI No

How many stages will the works include?

What stage(s) will this development application
apply to?

 

  
   

 

 

 

     

10) ‘Dividing land into Pate by. ou Stet many na ate Ee created and Wie iS iS ORES ieee ii
[elise | i :

Intended use of parts created

      
 

      

  

    

Residential Commercial | Industrial Other, please specify:

 

 

 

 

 

 

Number of parts created

 

Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017

Page 5

Department of Infrastructure, Local Government and Plann

 

| 12) Boundary realignment

 

Curentlot Proposed lot
Lot on plan description Area (m?) Lot on plan description Area (m2)

 

 

 

 

 

 

 

 

2 ME aS eter Sonne ete te -elene

 

 

    
 
 

  
  

43) What are the dimensions and nature of any existing Eeeoueais ey cia and/or Any proposed. easement? :
_ (attach schedule if there are more than two easements) : 2 a

Existing or Width (m) | Length (m) Purpose of the easement? (eg. : / ] T identify the land/lot(s s)
proposed? pedestrian access) benefitted by the easement

    

 

c

Division 3 — Operational work
Note: This division is only required to be completed if an

GD REIS UE eNO eile Gein ene 2 :
[_] Road work im Stormwater (J Water infrastructure

 

 

 

 

 

 

 

   
  
 

part of the development z ap, plication involves operational work.

 

   
   
  
   
  

 

 

(2 Drainage work (J Earthworks (4 Sewage infrastructure
( Landscaping [_] Signage : (1 Clearing vegetation
[x] Other — please specify: | Construction of domestic terrace

 
 
   

| C] Yes — specify number of new lots:

No

 

 

 

   

15) Identify the assessment manager(s) who will b is development application

Kerri Coyle
He) eS the local Cellnet Bees (oclealty a superseded planning ene for this development application?
EX] Yes — a copy of the decision notice is attached to this development application

-] Local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached

[No

    

 

     
       
   
   

PART 5 — REFERRAL DETAILS

  

4 oy Do: ein) eesees Gane proposed Geile elie recue! Aiele any ciel ieee :
CEES development. application wilh elin Leucine (ese lilee) UTS Planning Regulation, ANTE : :

I No, there are no referral requirements relevant to any development aspects identified i in this development
application ~ proceed to Part 6

Matters requiring referral to the chief executive of the Planning Regulation 2017:

(J Clearing native vegetation
(J Contaminated land (unexploded ordnance)

     
    
    

Page 5
DA Form 1 ~ Development Application details
Version 1.0—3 July 2017

Page 6

Department of Infrastructure, Local Government and Plann

CJ Environmentally relevant activities (ERA) (only if the ERA have not been devolved to a local government)

(1 Fisheries — aquaculture

(-] Fisheries — declared fish habitat area

(7 Fisheries — marine plants

C1] Fisheries ~ waterway barrier works

L] Hazardous chemical facilities

(J Queensland heritage place (on or near a Queensland heritage place)

(_] Infrastructure — designated premises

(C1 Infrastructure — state transport infrastructure

(1 Infrastructure — state transport corridors and future state transport corridors

(J infrastructure — state-controlled transport tunnels and future state-controlled transport tunnels

(_] Infrastructure — state-controlled roads

(7 Land within Port of Brisbane’s port limits

(] SEQ development area

(_] SEQ regional landscape and rural production area or SEQ Rural living area — community activity
~ (1 SEQ regional landscape and rural production area or SEQ Rural living area — indoor recreation
(J SEQ regional landscape and rural production area or SEQ Rural living area — residential development
(J SEQ regional landscape and rural production area or SEQ Rural living area ~ urban activity

(J Tidal works or works in a coastal management district

(J Urban design

LJ Water-related development — taking or interfering with water

( Water-related development — removing quarry material (‘rom a watercourse or lake)

(J Water-related development — referable dams

LC] Water-related development — construction of new levees or modification of existing levees (category 2 or 3 levees only)
(1) Wetland protection area

 

Matters requiring referral to the local government:

 

(J Airport land
[_] Environmentally relevant activities (ERA) (only ifthe ERA have been devolved to local government)

("] Local heritage places

 

Matters requiring referral to the chief executive of the distribution entity or transmission entity:
(1 Electricity infrastructure

 

Matters requiring referral to:
e The chief executive of the holder of the licence, if not an individual
e The holder of the licence, if the holder of the licence is an individual
C1 Oil and gas infrastructure

 

Matters requiring referral to the Brisbane City Council:
(Brisbane core port land

 

Matters requiring referral to the Minister under the Transport Infrastructure Act 1994:
(J Brisbane core port land
(J Strategic port land

 

Matters requiring referral to the relevant port operator:
(2 Brisbane core port land (below high-water mark and within port limits)

 

Matters requiring referral to the chief executive of the relevant port authority:
(Land within limits of another port

 

Matters requiring referral to the Gold Coast Waterways Authority:
(1 Tidal works, or development in a coastal management district in Gold Coast waters

 

 

Maiters requiring referral to the Queensland Fire and Emergency Service:

 

(J Tidal works, or development in a coastal management district

 

Page 6
DA Form 1 — Developmeni Application details
Version 1.0—3 July 2017

Page 7

Department of Infrastructure, Local Government and Plann

18) Has any referral agency provided a referral response for this development application?

(1 Yes — referral response(s) received and listed below are attached to this development application

[No

Referral requirement Referral agency Date of referral response

 

 

 

 

 

 

Identify and describe any changes made to the proposed development application that was the subject of the referral
response and the development application the subject of this form, or include details in a schedule to this development

application (if applicable).

 

 

 

 

PART 6 — INFORMATION REQUEST

  
 

  

19) Information request under Part 3 of the DA Rules

( [X] | agree to receive an information request if determined necessary for this development application

(J | do not agree to accept an information request for this development application

Note: By not agreeing to accept an information request |, the applicant, acknowledge:

e that this development application will be assessed and decided based on the information provided when making this development application and
the assessment manager and any referral agencies relevant to the development application are not obligated'under the DA Rules to accept any
additional information provided by the applicant for the development application unless agreed to by the relevant parties

e Part 3 of the DA Rules will still apply if the application is an application listed under section 11.3 of the DA Rules.
Further advice about information requests is contained in the DA Forms Guide.

PART 7 — FURTHER DETAILS

20) Are there any associated development applications or current approvals? (e.g. a preliminary approval)

XX] Yes — provide details below or include details in a schedule to this development application

LI No

List of approval/development Reference number Date Assessment manager
application references
C1] Approval _. 132003.221152.5 iia
( Xx] Development application

LJ Approval
(J Development application

 

 

 

 

 

 

 

21) Has the portable long service leave levy been paid? (only applicable to development applications involving building work or

 

operational work)

C1 Yes — the yellow local government/private certifier’s copy of the receipted QLeave form is attached to this
development application

(J No =1, the applicant will provide evidence that the portable long service leave levy has been paid before the
assessment manager decides the development application. | acknowledge that the assessment manager may give a
development approval only if | provide evidence that the portable long service leave levy has been paid

(Not applicable

Amount paid Date paid (dd/mm/yy) QLeave levy number (A, B or E)
$

 

 

 

 

 

 

  

22) Is this development application in response to a show cause notice or required as a result of an enforcement notice?

 

CJ Yes — show cause or enforcement notice is attached

Xx] No

 

Page 7
DA Form 1 — Development Application details
Version 1.0—3 July 2017

Page 8

Department of Infrastructure, Local Government and Plann

[CoC ene
| Environmentally relevant activities

23:1) ik this GE Veleleut- a: Evol Ele, taken to be an Ele lication for ¢ an EGlaviicelatieteintell authority for an
Environmentally ERE Aang) (ERA) under section Mee ie ENviror /

[] Yes — the required attachment (form EM941) for an application for an environmental authority accompanies this
development application, and details are provided in the table below

XX] No
Note: Application for an environmental authority can be found by searching “EM941” at www.qld.gov.au. An ERA requires an environmental authority
to operate. See www.business.qid.gov.au for further information.

Proposed ERA number: Proposed ERA threshold:
Proposed ERA name:

oO Multiple ERAs are applicable to this development application and the details have been attached in a schedule
to this development application.

 

 

 

 

 

{ application for a haza

(1 Yes — Form 69: Notification of a facility exceeding 10% of schedule 15 threshold i is attached to this development
application

—] No

Note: See www.justice. gid.gov.au for further information.

 

 

 

_Clearing native eR Celel oe a -
_28.3) Does this development application involve clearing native vegetation that requires written confirmation the chief
-executive of the Vegetation Management Act 1999 is satisti ed ue clearing is for a relevant See (inte (le section CAS
ot the Vegetation Management Act 19992 : oe

C1 Yes — this development application is accompanied by written confirmation from the chief executive of the

Vegetation Management Act 1999 (s22A determination)

x] No

Note: See www. www. gid. gov.au for further information.

Environmental offsets
23.4) Is this development application taken fo be a prescribed. activity that may have a significant residual impact ona
_ prescribed environmental matter under nvironmental Offsets Act 2014? :

[7] Yes — | acknowledge that an environmental offset must be provided for any prescribed activity assessed as having 2 a
significant residual impact on a prescribed environmental matter
EX] No

Note: The environmenial offset section of the Queensland Government's website can be accessed at www.qld.gov.au for further information on
environmental offsets.

 

   

Koala conservation :
23.5) Does this development application involve a material change of use, reconfiguring a lot or operational work within
_an assessable development area under Schedule 10, Part 10 of the Planning Regulation 20172 |

Yes
EX] No

Note: See guidance materials at www.ehp.gid.gov.au for further information.
MTEC een

23.6) Does this development application involve taking c Or eaeane ne Pe Aet CEelencarn) water, taking Ce :
-interfering with water ina watercourse; lake or spring, taking overland iM MEL ale waterway [eutls works?

(1 Yes — the relevant template is completed and attached to this development application

—] No

Note: DA templates are available from www.dilgp.gid.gov.au.

 

 

 

  
 

  

23 7) Does this application involve tak
with water in a Watercourse, lake or s

    

Page 8
DA Form 1 ~ Development Application details
Version 1.0—3 July 2017

Page 9

Department of Infrastructure, Local Government and Plann

 

(1 Yes ~ | acknowledge that a relevant water authorisation under the Water Act 2000 may be required prior to
mane development
x] No

te Contact the Department of Natural Resources and Mines at www.dnrm. ald. ov. au for further information.

  

 

Marine EMS

23. 8) Does this development Edel Involve EC ti Wiel IMAC Coo ian habitat area or removal,
CUTE eles ieee UueeUiot : ’ : : :

(1 Yes — an associated resource allocation authority is s attached to this development application, if required under the
Fisheries Act 1994

No

Note: See guidance materials at wwrw.dat.qid.gov.au for further information.

Quarry materials from a Watercourse orlake

28.9) Does this development eee Involve the removal of quarry: RECEEIG from a watercourse or fo wes
the Water Act 20002 : :

(1 Yes -1 acknowledge that a quarry material allocation notice must be obtained | prior to commencing development
—X] No

Note: Contact the Department of Natural Resources and Mines at www.dnim.qid.gov.au for further information.

Quarry materials from land under tidal waters

oe a) Does this development application involve the removal of quarry materials from.land under tidal water under. |
the Coastal Protection and Management Act 1995? co

(1 Yes — | acknowledge that a quarry material allocation notice must be obtained prior to commencing development

KK] No

Note: Contact the Department of Environment and Heritage Protection at www.ehp.qid.qov.au for further information.

CJ Yes - the Notice Accepting a Failure Impact Assessment from the chief executive administering the Water Supply
Act is attached to this development application

—X] No

Note: See guidance materials at www.dews.ald.gov.au for further information.

aah (avila or development within a coastal Renee Cintas district

23 12) Does this development application involve eel work or EAE) slriCetie Te rer tel management Celta te

 

(1 Yes — the following is included with this development application:

(J Evidence the proposal meets the code for assessable development that is prescribed tidal work (only required if
application involves prescribed tidal work)

CIA certificate of title
x] No
hate See guidance materials at www.ehp.gld.gov.au for further information.

_ Queensland and local heritage places -

   

23.13) Derg this development application propose development on or adjoining a place entered inthe eerie
_ heritage register or on a place entered in a local government's Local Heritage Register? :

(1 Yes — details of the heritage place are provided in the table below

i] No

Note: See guidance materials at www. ehp.qid.gov.au for information requirements regarding development of Queensland heritage places.

 

Name of the o Fertage place: Place ID:

 

23.44) Byers fit Cea pplication. Ie: 2 eciel ee of che for a ec :

(-] Yes - this development application demonstrates how the proposal meets the code for a development application
for a brothel under Schedule 3 of the Prostitution Regulation 2014

 

 

 

 

Page 9
DA Form 1 — Development Application details
Version 1.0—3 July 2017

Page 10

Department of Infrastructure, Local Government and Plann

 

No
‘Pieieen ffl ECiatbti Cy Cli the. Transport alii t structure Act 1994

 

ee 1c) Does dae eeiceancat application TCE! Ue on Cieneee cede toa a state-controlled ee

(J Yes - this application will be taken to be an application for a decision under section 62 of the Transport
Infrastructure Act 1994 (subject to the conditions in section 75 of the Transport Infrastructure Act 1994 being satisfied)

No
PART 8 — CHECKLIST AND APPLICANT DECLARATION

 

 

BEL, De vcleslncat application Cie. a f : S
| have identified the assessment manager i in question 15 and all relevant referral

 

 

requirement(s) in question 17 Yes
Note: See the Planning Regulation 2017 for referral requirements
|f building work is associated with the proposed development, Parts 4 to 6 of Form 2— Yes

€ ~ Building work details have been completed and attached to this development application (J Not applicable

Supporting information addressing any applicable assessment benchmarks is with
development application

Note: This is a mandatory requirement and includes any relevant templates under question 23, a planning report Yes
and any technical reports required by the relevant categorising instruments (e.g. local government planning
schemes, State Planning Policy, State Development Assessment Provisions). For further information, see DA

Forms Guide: Planning Report Template.
Relevant plans of the development are attached to this development application

 

 

Note: Relevant plans are required to be submitted for all aspects of this development application. For further X Yes

information, see DA Forms Guide: Relevant plans.

The portable long service leave levy for QLeave has been paid, or will be paid before a C] Yes
development permit is issued (see 27)) &X] Not applicable

 

 

By making this development application, | declare that all information in this development application is true and
correct

Where an email address is provided in Part 1 of this form, | consent to receive future electronic communications
from the assessment manager and any referral agency for the development application where written information is
€ required or permitted pursuant to sections 11 and 12 of the Electronic Transactions Act 2001

Note: It is unlawful to intentionally provide false or misleading information.

Privacy — Personal information collected in this form will be used by the assessment manager and/or chosen

assessment manager, any relevant referral agency and/or building certifier (including any professional advisers which

may be engaged by those entities) while processing, assessing and deciding the development application.

All information relating to this development application may be available for inspection and purchase, and/or published

on the assessment manager's and/or referral agency’s website.

Personal information will not be disclosed for a purpose unrelated to the Planning Act 2016, Planning Regulation 2017

and the DA Rules except where:

® such disclosure is in accordance with the provisions about public access to documents contained in the Planning Act
2016 and the Planning Regulation 2017, and the access rules made under the Planning Act 2016 and Planning
Regulation 2017; or

e required by other legislation (including ti the Right to Information Act 2009); 0

e otherwise required by law.

This information may be stored in relevant databases. The information collected will be retained as required by the

Public Records Act 2002.

 

 

 

 

Page 10
DA Form 1 — Development Application details
Version 1.0—3 Julv 2017

Page 11

Department of Infrastructure, Local Government and Plann

PART 9 — FOR OFFICE USE ONLY

Date received: fs Reference number(s): |

Oication: oF engagementot alterna a} fe |are(ols:

 

 

Prescribed assessment manager
Name of chosen assessment manager

 

 

Date chosen assessment manager engaged
Contact number of chosen assessment manager

Relevant licence number(s) of chosen assessment
manager

 

 

 

 

 

 

Description of the work

QLeave project number

Amount paid ($)

Date paid

Date receipted form sighted by assessment manager
Name of officer who sighted the form

 

The Planning Act 2016, the Planning Regulation 2017 and the DA Rules are administered by the Department of
Infrastructure, Local Government and Planning. This form and all other required development application materials should
be sent to the assessment manager.

Page 14
DA Form 1 — Development Application details
Version 1.0—3 July 2017

Page 12

Department of Infrastructure, Local Government and Planning

 

State

Tasmania

 

Postcode

7007

 

Contact number

0414 824 524

 

Email address (non-mandatory)

 

Mobile number (non-mandatory)

 

Fax number (non-mandatory)

 

 

15) Builder's details
_] Tick if a builder has not yet been engaged to undertake the work and proceed to 16). Othenwise provide the following

 

 

 

 

 

 

 

 

information.

Name(s) (individual or company full name) Bartho and Son
Contact name (applicable for companies) Dan Bartho
QBCC licence or owner — builder number 1280160

Postal address (P.O. Box or street address) PO Box 670
Suburb Coolum Beach
State QLD

Postcode 4573

 

Contact number

0421 968 969

 

Email address (non-mandatory)

 

Mobile number (non-mandatory)

 

 

Fax number (non-mandatory)

 

 

a) What type of approval is being sought?
[Xx] Development permit
‘LJ Preliminary approval

16) Provide details about the proposed building work

 

 

b) What is the level of assessment?

 

x] Code assessment
O Impact assessment (requires public notification)

 

{X] New building or structure

{_] Demolition

c) Nature of the proposed building work (tick all applicable boxes)

(J Change of building classification (involving building work)

C Repairs, alterations or additions
{_] Swimming pool and/or pool fence
(] Relocation or removal

 

d) Provide a description of the work below or in an attached schedule.

 

Concrete footings to steel and timber terrace

 

e) Proposed construction materials

 

 

 

 

 

 

LJ Double brick _] Steel L] Curtain glass
External walls LJ Brick veneer LJ Timber (J Aluminium
_] Stone/concrete (_] Fibre cement LJ Other
(U1 Timber L Steel (LJ Aluminium
Frame o Other
Floor L] Concrete x] Timber (LJ Other
3 LJ Slate/concrete [J Tiles (1 Fibre cement
Roof covering LJ Aluminium LJ Steel LJ Other

 

 

Page 4
DA Form 2 — Development Application details
Version 1.0—3 Julv 2017

Page 13

Department of Infrastructure, Local Government and Plannin;

 
 

)) Has the portable long service leave levy been paid? ae
(_] Yes — the yellow local government/private certifier's copy of the receipted QLeave form is attached to this
development application

{_] No — 1], the applicant will provide evidence that the portable long service leave levy has been paid before the
assessment manager decides the development application. | acknowledge that the assessment manager may give a
development approval only if | provide evidence that the portable long service leave levy has been paid

] Not applicable

Amount paid Date paid (dd/mm/yy) QlLeave levy number (A, B or E)

$

   

 

 

 

 

 

 

 
 
 
 

  

10) Is this development application in response to a show cause notice or required as a result of an enforcement notice?
(1 Yes — show cause or enforcement notice is attached

KX] No

11) Identify any of the following further legislative requirements that apply to any aspect of this development application

The proposed development is on a place entered in the Queensland heritage register or in a local
government's Local Heritage Register. See the guidance provided at www.ehp.qid.gov.au about the
requirements in relation to the development of a Queensland heritage place

    
   

 

 

 

 

 

Name of the heritage place: Place ID:

 

PART 4 — REFERRAL DETAILS

  
  

  

12) Does this development application include any building work aspects that have any referral requirements?
O Yes — the Referral checklist for building work is attached to this development application
TX] No = proceed to Part 5 .

 
  

13) Has any referral agency provided a referral response for this development application?
(J Yes = referral response(s) teceived and listed below are attached to this development application

KI No

Referral requirement Referral agency. Daie referral response

 

 

 

 

 

 

 

Identify and describe any changes made to the proposed development application that was the subject of the referral
tesponse and the development application the subject of this form, or include details in a schedule to this development

application (if applicable)

 

 

 

 

PART 5 — BUILDING WORK DETAILS

(Tick if the applicant is also the owner and proceed to 15). Otherwise, provide the following information.
Name(S) (individual or company full name) Woolly Holdings Group Pty Ltd

Contact name (applicable for companies) Greg Woolly
Postal address (P.O. Box or street address) 44 Wiamea Ave
Suburb Sandy Bay

 

Page 3
DA Form 2 — Development Application details
Version 1.0—3 Julv 2017

Page 14

MYLES BALDWIN DESIGN

 

 

12 Park Road

Noosa Heads

TREE PROTECTION PLAN

Rev B
28/09/2017

 

 

Page 15

MYLES BALDWIN DESIGN

TABLE OF CONTENTS

TABLE OF CONTENTS.

 

 

Trees proposed for retention:
RECOMMENDATIONS wocccccscscssssestesssssecsecuressenesnsensaucaeenecuesnesacsassussessuceusansassnssussussecaveeveaueseeseeseeseaetavssvcavanea 7
APPENDIX A: Tree IOCGTION PLN. esesssesessessessestesesesenessecnesnessssuesussucanssesuesucsessussetsuascarsseasenscsneavsneesves 8

APPENDIX B: Tree Protection Zone specification

 

APPENDIX C: Trunk ANd GrOUNC PrOteCtion ..vceccceccscssessssessessseesssessssssesecsesesacsessrsvsarevssescsreataevensavaves 10
APPENDIX D: All works within a Tree Protection Zone (TPZ) .ecccesccscssesssscssecsseseesessessvssscatesveseaseneesvees fi
ACCESS TAPOUGN A TPZ ceecccccecccesecscscsstssecccucecsestessersueneasuenequessresseneassnessesuespaneaesisstatsarsuseseccanavseserenenens i

Demolition Of Structures Within ATPZ .

 

Construction Work WIHNIN A TPZ .ccccsssessesssresesseseensessassneevessesuesssuesnsscsussnssussecsessesevceeseussessesutacsaneaves 12
APPENDIX E: Scaffolding location set OUt cc cccccsessssesessssssscsessscccsssssescscsesvsssssssuerssscavesseevacaeanseaees 13
APPENDIX F: Installation of piles ONG CAPPING oe eeecessesesseesssecesssstsscscseescessscsssecssssesessvecsusneavsesneavenee 15

Environmental Coniro! Plan fo prevent pollution from concreting operations during the

construction (Grouting & Pil COPS) ve cccesectceeesesesnenssessessesssesscsescsesssscsssstsnsacssssesusavsesacneeveaenenea 15

Background

Conirols:.

 

Methodology for installation of hollow bar micro-piles as deep foundation support for the

NOW TIME! DOCK. ossescececcececsssesseseeseseeseseeeesssausneenssecensaseceseassuesesneassessensusseecssssssassusacsesecsnersasacseeseers 16
REFERENCES oo. ssescecsscssssessessesseesssressesrcssccaccassassusssseucsusnusnesussucsuesnessssassvsansansavavsasasessnasesassarssesseeersueereacssuesses 17
12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 2.9699 2622

NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

Page 16

MYLES BALDWIN DESIGN

SUMMARY

 

This Tree Protection Pian provides an assessment of five (5) trees/groups of trees (the subject
irees) growing at, and adjacent fo 12 Park Road, Noosa Heads, Queensland (the site).

The subject trees are protected under the Noosa Council framework.

The development proposal for the site includes a proposed deck and supporting structure, with
associated landscape planting and soft works.

The Tree Protection Plan (TPP) includes the protection of five (5) trees growing within and
adjacent the site, and are to be protected throughout the development process. For this, Tree
Protection Zones (TPZ) are to be established for the trees and erected according to the
Australian Standard AS 4970-2009.

Tree sensitive demolition and construction methods are jo be villised to minimise construction
impacis on trees subject to development encroachments and the recommendations of this
Tree Protection Pian, where if different to those of the Australien Standard are fo be superseded
by the Australian Standard 4970-2009 and carried out as permitted in accordance with the prior
approval of the Council or its arborist.

12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622
NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

Page 17

MYLES BALDWIN DESIGN

SCOPE OF THE TREE PROTECTION PLAN

 

This Tree Protection Plan provides an assessment of five (5) trees (tne subject trees) growing ai,
and adjacent to the subject site, where the development proposal for the site includes a
proposed deck and supporting structure, with associated landscape planting and soft works

This Tree Protection Plan has been prepared to meet the following objectives:
+ Make recommendations for protection of the subject trees as appropriate.
The following plans were considered in the preparation of this plan:

*  MB_12PR_30
«+  MB_12PR_31
+ MB_12PR_32
*  MB_12PR_36
*  MB_12PR_37
+ MB_12PR_38
* MB_12PR_40
+ MB_12PR_41
*  MB_12PR_42
*  MB_12PR_43
*  MB_12PR_50

12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622
NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

Page 18

MYLES BALDWIN DESIGN

CAVEATS, LIMITATIONS, AND DEFINITIONS

 

The findings of this Tree Protection Plan are based on observations made at the time of
inspections prior to this Tree Protection Plan being prepared and from the information contained
within plans / documentation provided by the project team of consultants.

The Tree Protection Plan reflects the subject trees as found on the day of inspection. There is no
warranty or guarantee, expressed or implied, that problems or deficiencies with the site or the
subject trees may not arise in the future. Any changes to the developmen proposal or tree
management works beyond those recommended in this Tree Protection Plan may alter the
findings and recommendations of the Tree Protection Plan.

The methodology used in this Tree Protection Plan follows the procedures detailed in Australian
Standard: AS 4970—2009 Protection Of Trees On Development Sites. This Tree Protection Plan
also references the British Standard BS: 5837 (2005) Trees In Relation To Construction -
Recommendaiions. The references used in this Tree Protection Plan provides the following
information:

Tree species - botanical and common name, referenced on plan with a corresponding number.
D8H — Diameter at breast height (mm)
SRZ - Structural Root Zone radius (m)

TPZ ~ Tree protection Zone radius (m}

DBH (Diameter at Breast Height) - Stem /trunk diameter measured at 1.4m above ground level.
On sloping ground, measuremenis will be taken at the mid slope point at the base of the tree.
Where a tree stem / trunk begins to branch at a point that is less than 1.4m above ground, a
combined siem diameter is calculated using the formula: Tofal DBH = ¥ DBH2+ DBH2 + DBH2

SRZ (Structural Root Zone) — The area around the base of a tree required for the tree's stability in
the ground. The woody root growth and soil cohesions in this area are necessary to hold the tree
upright. The SRZ is nominally circular with the trunk at its centre and is expressed by ifs radius in
metres.

TPZ (Tree Protection Zone} ~ A specified area above and below ground and at a given distance
from the trunk set aside for the protection of a tree's roots and crown to provide for the viability
and stability of a tree to be retained where it is potentially subject to damage by development.

12 PARK ROAD 1A / 357 ~ 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622
NOOSA HEADS [email protected] | www.mylesbaidwin.com | ABN 68 139 176 328

Page 19

MYLES BALDWIN DESIGN

Trees proposed for retention:

 

126 Lophostemon confertus (Queensiand box)

187 Corymbia intermedia (pink bloodwood)
1177 Cryptocarya glaucescens (jackwood)
1181 Corymbia intermedia (pink bloodwood)

1271 Eucalyptus tereticoris (Queensiand blue gum)

 

 

 

 

 

 

 

 

 

 

 

 

 

Tree No | Tree Species SRZ radius | TPZ radius 10x DBH
DBH (mm) | (™) (m) radius (m)
26 Lophostemon confertus 300mm 1.35m 3.6m 3m
87 Corymbia intermedia 300mm 1.35m 3.6m, 3m
77 Cryptocarya glaucescens | 400mm 1.8m 4.8m 4m
181 Corymbia intermedia 400mm 1.8m 4.8m 4m
27) Eucalyptus tereticornis 700mm 3.15m 8.4m 7m
12 PARK ROAD 1A / 357 - 359 Cleveland Sireet, Redfern, NSW, 2016 | PH +61 29699 2622

NOOSA HEADS

[email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

 

Page 20

MYLES BALDWIN DESIGN

RECOMMENDATIONS

 

The Project Arborist shall be appointed to monitor all trees to be retained for the duration of the
project and provide compliance documentation as per Councils requiremenis.

Following tree removal, as part of site establishment works, install TPZ fencing and/or trunk and
ground protection for trees 126, 187, 1177, 1181, and 1271 (refer Appendix B - TPZ Specification
and Appendix C - Trunk & Ground Protection).

To provide developmeni access fencing may be set back. Where TPZ fencing is set back,
ground protection/tree sensitive demolition and construction methods shall be used as per
Appendix D - Working Within A TPZ.

Tree Protection measures shall be inspected and approved by the Project Arborist and
compliance documentation provided to the Principal Certifying Authority prior to the
commencement of development works. Tree protection measures shall only be removed on
completion of all construction works to provide access for soft landscape works (i.e.
turfing/planting) in the final stages of the project.

No grade alterations or excavation (including services installation) other than for approved
works shall be permitted within a TPZ area. Approved grade alferations/excavation shall be
supervised by the Project Arborist.

Where possibie all existing footings and services within a TPZ area shall be left in situ. Wnere
footings are to be removed the works shall be supervised by the Project Arborist and demolition
undertaken in small sections using hand-operated breakers only.

Pier locations shall be hand excavated to a minimum depth of 600mm and if roots greater than
25mm diameter are encountered the pier location shall be adjusted to enable the retention of
roots {unless root pruning is approved and undertaken by the Project Arborist}.

Landscape treatmenis (i.e. planting or turfing) to be undertaken within the TPZ areas shall avoid
cultivation of soils (other than light cultivation using hand tools only} to enable the retention of
roots >25mm diameter.

A temporary irrigation system shall be installed within the TPZ area of trees T26, 187, 1177, T181,
and 1271 to ensure an adequate supply of water to maintain the health of the tree. Drip lines
shall be spaced at 600mm centres and the system operated via an electronic tap timer for a
minimum of 20 minutes on a daily basis. Irrigation requirements shall be periodically reviewed
and amended as required, by the Project Arborist throughout the development period.

New irees shall be grown in accordance with AS 2303 (2015} Tree stock for landscape use.

The recommendations of this Tree Protection Plan are subject to approval by Noosa Council.

12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622
NOOSA HEADS [email protected] | www.mylesbaidwin.com | ABN 68 139 176 328

Page 21

MYLES BALDWIN DESIGN

APPENDIX A: Tree location plan

 

LEGEND

 

Refer to drawing MB_12PR_50

12 PARK ROAD 1A / 357 — 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622

NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

Page 22

O

MYLES BALDWIN DESIGN

 

APPENDIX B: Tree Protection Zone specification
es I

aig

ty i oak . Bi

od | EE dl
moo 8 Ghia
moa Toate
A a ag
3 eee ¢ ge :
Hy Gog HH

Tree Protection Fencing

 

 

12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622

NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

Page 23

MYLES BALDWIN DESIGN
Trunk and ground protection

APPENDIX C:

 

VOVI 0102 @ 146yAdoa,
8[B9S 0} JON UOD9}Oldg PUNdID pue yuNI|L ‘youesg JO sejdwiexy

 

“s0he] eye60.66e
40 yoinus yeeusepun ougey eixa}0e9

 

-seAe] aye6es66e 40 yojnw yjdep
WWOg WINUWIUIW pue WWOO, WuNWUXeYy

 

     

4

Y SK
ff. JA. —~
V4

if
“mojoq 0X6] e}e60166e 40 yojnus noua 40 UWLELZZZI

UM (Juajeainbe peroidde Jo) seyeid jee1S LLL oa ‘C=

ae

eBewep joo.

pue yoRIedwod [10s yuenaud 0} ssoUyxDIy
SIGEUNS eB JO q Pinoys Bo1nep UOADe}OId
Puno seAe; aye6es66e Jo yojnw 4800
peddeyjs e91A@p asn - UoRIB}O4g Puno‘,

 

“yUNL] @4) 0} Pay[eU JO pamasos jou
‘peddens eq 0} ase spseog “(wz wnuujw)
weq oy eGewep juenaid 0} Buipped

pue spieog esn - uoRoe}o1g YUNA,

 

“YOUBIq OY} O} PayeU JO pamesos

you ‘paddeyjs aq 0} aie spueog “yoursq
uo y1eq 0} eBewep juereid 0} Bulpped
Pue spieog esn - uoRde}O1g Yous

10
[email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

1A / 357 — 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622

12 PARK ROAD
NOOSA HEADS

Page 24

MYLES BALDWIN DESIGN

APPENDIX D: All works within a Tree Protection Zone (TPZ)

 

Access Through A TPZ

+ Where no other options exist, access is permitted within the TPZ for elements of
approved development works e.g. placement of scaffolding, demolition works, or for
the movement of machinery/materials. To minimise compaction of the soil within the
TPZ, a temporary access rouie shall be constructed fo the following specifications:

* For light use (compact machinery / pedestrian traffic} - a 100mm layer of coarse grade
mulch spread across fhe surface of the ground, over which HDPE ground mats, plywood
sheeting, scaffolding boards or similar are to be placed. The movement of compact
machinery and pedesirian traffic is to be restricted solely to these areas.

* For heavy use (any vehicles >3.5t) - a layer of geotextile fabric is to be laid across the
surface of the ground over which an approved, temporary load bearing surface e.g.
reinforced concrete slab, road base, cellular confinement system etc. is to installed. To
prevent damage fo the root system of the tree(s) the ground beneath the temporary
access route must not to be altered in level or compacted prior fo the installation of the
load-bearing surface.

* Removal of any temporary access rouie materials is to be carried out with care to
ensure thai the ground beneath the roadway is not alfered in level or compacted
during removal operations.

+ All works within a TPZ must be supervised by the project Arborist and are to be carried
out according to the Australian Standard 4970-2009 and as permitted in accordance
with the prior approval of the Council.

Demolition Of Structures Within A TPZ

+ Allplani and vehicles engaged in demolition works should either operate outside the
TPZ, or should run on either a temporary surface designed to protect the underlying soil
structure, {as detailed in points above or existing pavement surfaces. Where such
ground protection is required, if snould be installed prior fo commencement of
operations.

+ Where frees stand adjacent to struciures scheduled for demolition, it may be necessary
to undertake demolition inwards within the footprint of the existing building (often
referred fo as “top down, pull back"). Where levels of dust build-up on irees are likely, it
may be necessary to seek the advice of an Arboriculturist on remedial measures, e.g.
hose down the tree(s) immediately following any significant accumulation of dust.

« Where an existing hard surface is scheduled for removal, care should be taken not to
disturb tree roots that may be present beneath it. Hand held tools or appropriate
machinery should be used (under arboricultural supervision} to remove the existing
surface. Where roots are exposed, they are to be protected with damp hessian sacking
or a layer of muich (minimum 75mm) to prevent desiccation. Hessian sacking or muich is
to be watered regularly to ensure root coverings remain moist at all times. When
backfilling around exposed roois, temporary protection materials e.g. hessian/mulch

12 PARK ROAD 1A / 357 ~ 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622 a
NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

Page 25

MYLES BALDWIN DESIGN

are to be removed and the roots covered with river sand or other coarse granular fill
before replacing the soil. Builder's sand is not to be used, as its high salt content can be
toxic fo roots.

+ The advice of an Arboriculturist should be sought where underground structures present
within the TPZ are/will become redundant. in general it is preferable fo leave such
structures in situ and seal them off as this avoids the need for significant excavation.

+ All works within a TPZ must be supervised by the project Arborist and are to be carried
oui according to the Australian Standard 4970-2009 and as permitted in accordance
with the prior approval of the Council.

Construction Work Within A TPZ

* Prior fo installation of a new ground surface, existing ground cover vegetation should be
killed using an appropriate herbicide e.g. Glyphosate based products. Herbicides that
can leach through the soil e.g. products containing Sodium Chiorate should not be
used. Once dead, the vegetation and loose organic matter should be removed from
the soil surface using hand toois.

* — If ground levels are fo be raised with a TPZ ihis should be achieved by use of a granular
material that does not inhibit vertical gaseous diffusion e.g. gap graded fill. Depending
upon the load bearing capacity of the soil it may be necessary fo install a load
suspension layer such as a cellular confinement system.

+ Works within the TPZ may be permitted for the construction of approved works such as
modified footings (e.g. pier and beam, cantilevered slab etc.), designed fo minimise
the impact upon the root system of the tree. Any excavation must be carried out by
hand and is to avoid damaging the proiective bark of any tree roots encountered.
Should any roots over 25mm diameter be encountered, then the location of the
modified footing must be adjusted as required to prevent damage to these roots. Roots
smaller than 25mm diameter may be pruned back using a sharp saw or secafeurs.
Where appropriaie the project Arborist may be required fo supervise excavations and
consult with the project Engineer as fo the relocation of modified footings etc.

+ Works within the TPZ may be permitted for the construction of above grade slabs and
pavements, designed fo minimise the impact upon the root system of the tree. In
concentration carbon dioxide is detrimental to tree root function. Because this gas
principally diffuses vertically through the soil, new impermeable surfacing within a TPZ
should where possible be resiricted to a maximum width of 3m and situated tangentially
to one side of a tree only, or confined to an area no greater that 10% of the TPZ.

+ All works within a TPZ must be supervised by the project Arborist and are to be carried
out according to the Australian Standard 4970-2009 and as permitted in accordance
with the prior approval of the Council.

12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622 12
NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

Page 26

APPENDIX E:

 

12 PARK ROAD

NOOSA HEADS

MYLES BALDWIN DESIGN

Scaffolding location set out

AME TEAST HOCH ON
nse ctec HOH He

LEGEND

SCAFFOLD SIZE:

(B)- 1800 x 1200mm

 

1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622

[email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

Page 27

MYLES BALDWIN DESIGN

Scaffolding is to be erected within a TPZ as nominated in the above set out plan, where
adequate ground protection such as plywood sheeting or scaffolding boards is installed to
prevent compaction of soils. All boarding must be placed over a layer of muich and impervious
sheeting to prevent contamination of soils, and branches that conflict with erection of
scaffolding must not be pruned without prior approval by the relevant consent authority.
Branches that may abrade on scaffolding are to be protected with suitable padding or may be
tied back under advice from the project arborist.

The above set out plan will allow for the erection of a 5.2m x 8.6m scaffold platform erected
above the existing driveway to accommodate the hydraulic pump and facilitate the removal
of spoil through a void into a truck below. This is o be supported by the existing rock walls and
driveway. Running from this will be an elevated ramp to support pump lines and facilitate the
removal of spoil; to be erected within the property boundary and on top of existing stonewalls.
Further protective scaffold platforms at 2.4m x 1.2m will be erected fo support the drill rig and
adjacent to pile positions, 10 prevent compaction of soils by foot traffic and drilling operations.

All works within a TPZ must be carried out according to the Australian Standard 4970-2009 and as
permitted in accordance with the prior approval of the Council.

12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 2 9699 2622
NOOSA HEADS [email protected] {| www.mylesbaldwin.com | ABN 68 139 176 328

14

Page 28

MYLES BALDWIN DESIGN

APPENDIX F: Installation of piles and capping

 

Environmental Control Plan to prevent pollution from concreting operations
during the construction (Grouting & Pile Caps)

Background.

The use of concrete materials is reduced to a minimum due to the use of a micro piling system
that is fo be craned onto site.

The small volumes of concrete required allow the use of a small concrete grout pump with
reduced line size to grout piles and concrete pile caps. This system gives precise control fo the
operators making spillage and cleaning requirements negligible.

Controls:

The builder/site manager will ensure the following best practice sediment conirol measures
including a designated wash down area are in place before work starts and are adequately
maintained throughout construction.

The designated wash down area is to be located within the site on the existing paved driveway
with sediment control screening in place and an appropriate HDP waste receptacle drum will
be available to retain any sediment waste from swept up spillage or cleaning of equipment.

The recepiacle drum will be exchanged as required. fitted with a sealed lid and the contents
removed from site regularly to the concrete supplier's authorised off site recycling and disposal
facility.

The builder/site manager will ensure ail workers on the site are aware of their responsibilities to
minimise pollution including the concrete pump operator who will directly monitor equipment to
ensure leakage and spillage does not occur.

The concrete supplier will be selected on the basis that appropriate training has been provided
to their agitator truck drivers, and that they provide appropriate details and resources fo enable
them to complete a delivery without causing pollution.

The agitator truck driver who will be required to be familiar with the Concrete Safe Site Delivery
Guidelines (available from Cement Concrete & Aggregates Australia at www.concrete.net.au
under ‘A-Z Directory’) and will have sufficien? training and experience to deliver concrete to site
and then retum to the batch plant without causing environmental harm through spillage or
leakage of concrete. The driver will inspect and maintain the truck at all times and will be
instructed to raise any concerns about the pollution conirols on site with the builder/site
manager. The driver must also ensure sediment is not tracked off site. If this occurs, if will be
swept up and put back into the site sediment receptacle drum.

Where possible, the delivery of concrete will occur within the site, using small trucks, fo ensure
the risk of spillage contaminating the stormwater system is minimised, If site access is restricted
and the delivery of concrete must occur on the street, appropriate sediment controls will be in
place before pouring begins.

12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622 15
NOOSA HEADS [email protected] | www.mylesbaidwin.com | ABN 68 139 176 328

Page 29

MYLES BALDWIN DESIGN

The builder/site manager will ensure that all appropriate sediment controls are in place before
the concrete pour starts. Any spillage that does occurred during the delivery procedure will be
swept up before removing the sediment conirols and concrete spillage will not be hosed into
the stormwater system. Excess concrete will be returned back to the supplier's depot.

Chutes, barrels, wheelbarrows and other equipment will be rinsed in the site wash-down area. To
minimise the amount of wash-down water generated, excess concrete will be scraped off
equipment before it is washed. Water in the wash down area will be contained and recycled as
required and not allowed to flow into the stormwater system. The chute contenis will be washed
into the sediment receptacle drum and sealed with a lid before leaving the sife. The drum will
be secured onto the main frame of the vehicle ready for transportation, and the drum will be
secured with a bracket that is easily accessible to the operator. The drum will be removed from
the bracket and the wastewater emptied into the designated treatment facility once the truck
retums to the yard with the wastewater containing suspended solids being recycled back into
the plant. Tne vehicle will be washed down at the depoi.

Delivery vehicles will be on paved surfaces at all times and so no mud soil and or stones will be
carted off site as pollutants. An inspection of roads for any sediment that has been tracked off
site will occur and if any is present it will be sweep back on site (this will be done if there is threat
of rain and at the end of each day). A hose will not be used to wash it away).

INSTALLATION OF PILES AND CAPPING

Methodology for installation of hollow bar micro-piles as deep foundation support for the new
timber deck.

The micro-piles consist of one or more outer steel casings installed to the depths indicated on
the piling subcontractor (PCA) drawings. A central steelreinforcing element consisting of a
40/20 hollow bar is to extend to a pre-determined design depth below the casing fo form the
bond length and develop the applied load.

After checking the project drawings for the details of the micro-pile arrangement for each pile
location designed in accordance with the Tree Protection Plan, the Construction Management
Plan, and relevant environmental protection documentation and instructions, the rig will be
craned into position for the first pile onto a previously established level temporary protective
platform constructed in accordance with the tree protection plan and AS4970 - 2009.

Drilling will be carried out using a 90mm EXX drill bit Using a rotary top hammer for installation
and all installation specifications accurately recorded for this and all subsequent piles.

The piles are grouted as the work proceeds and any excess grout is collected and pumped into
storage containment for offsite disposal in accordance with the concreting operations
environmental protection plan. The process is repeated for subsequent piles.

The onsite grouting pump will be contained within its own bunded area which will be kept clean
as the work proceeds and managed in accordance with the above Environmental! Controls
Plan to prevent pollution from concreting operations during the construction.

Pile capping is to be managed in the same way as the grouting procedures.

12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 2 9699 2622 16
NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328

Page 30

MYLES BALDWIN DESIGN

REFERENCES

Australian Standard: AS 4970 - 2009 Protection of irees on development sites. Standards Australia
GPO Box 476, Sydney, NSW, 2001.

Australian Standard: AS 2303 - 2015 Tree stock for landscape use. Standards Australia GPO Box
476, Sydney, NSW, 2001.

British Standard Institution {2005}. Guide for Trees in relation to construction. BSI, 2 Park Street,
London W1A 288.

Draper B.D. and Richards P.A. (2009), Dictionary for Managing Trees in Urban Environments,
Institute of Australian Consulting Arboriculturists (ACA), CSIRO Publishing, Collingwood, Victoria,
Australia.

Harris, R.W., Clark, J.R. and Matheny, N.P. 2003. Arboriculture: Integrated Management of
Landscape Trees, Shrubs and Vines. 4th Edition. Prentice-Hall, New Jersey

Mattheck, C. and Breloer H. (1994). The Body Language of Trees. A Handbook for Failure
Analysis. HMSO, London, UK.

12 PARK ROAD 1A / 357 — 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622

NOOSA HEADS [email protected] | www.mylesbaidwin.com | ABN 68 139 176 328

Page 31

PROPOSED NEW TERRACE AT 12 PARK ROAD, NOOSA HEADS

AMENDED “CONSTRUCTION MANAGEMENT PLAN” 26 Sep 2017

1. CONSTRUCTION MANAGEMENT PLAN

This report considers the Construction Management Plan for the proposed
new suspended steel and timber terrace together with access requirements,
materials handling, clearing, worker parking, and environmental considerations.

It is proposed to utilize predominantly manual material handling to construct
the footings, steel and timber terrace and install landscaping.

All conditions of the approval are to be complied with to the reasonable
satisfaction of the Noosa Council.

SUBMISSION BY BUILDER

The Builder is to submit written acknowledgement that the building works
shall be in compliance with the 9 tonne load limit applicable to Park Road.

The Builder is to submit written acknowledgement that no vehicle greater
than 6.0m in length will be used for the removal of excavated material and
that no more than one vehicle will be allowed to stand in Park Road at any
time.

The Builder is to submit written acknowledgement that most workers vehicles
are to be parked in Allambi Rise or in the existing driveway and carport.

The Builder is to submit written acknowledgement that all the works will be
carried out in accordance with the Construction Management Plan , and the
conditions of approval to the reasonable satisfaction of the Noosa Council.

STORMWATER DRAINAGE

Stormwater will be collected by a conventional arrangement of gutters, slatted
field drains and downpipes and piped through to the Council stormwater
main in Park road. The stormwater will connect to the Council main gulley
pit to limit surcharge.

Page 32

CLEARING

The proposed development retains all the significant trees on the property.
Identified on the Tree Protection Plan Rev A 11/08/2017 prepared by Myles
Baldwin Design and in accordance with AS 4970—2009. Protection Of Trees
On Development Sites.

A number of smaller trees previously planted by the owner of No. 12 Park
Road will be removed to allow access and for construction of footings.
(Refer to Survey/Engineering Plans). On completion a similar tree will be
replanted in each original location on site and in the road reserve to provide
and effective visual barrier to the undercroft of the proposed deck

Prior to construction all trees will be clearly tagged and recorded on a survey
plan. On completion the trees will be resurveyed to ensure full compliance
with the conditions of the Development Approval.

All work on the subject site is to be undertaken in accordance with the approved
Tree Protection Plan, Development Permit for Operational works
(Landscaping), Construction Management Plan and conditions of Council
Approval.

No regarding of the slopes within the Tree Protection Zone will be permitted.
The regrading of the slopes (to improve overall long term stability) beneath
the terrace will disturb the existing vegetation. On completion it is proposed
to replant beneath the terrace with shade tolerant native species.

ACCESS AND PARKING

The access for construction materials and equipment will be from Park Road
via the existing driveway to No. 10 Park Road. The Builder is to submit
written consent for the use of this access driveway and garage from the
owner of No. 10 Park Road. Access for personnel will be via’ Allambi Rise
and Park Road. Offsite parking will be required for most construction
personnel.

Most workers vehicles shall be parked in Allambi Rise or in the existing
driveway and carport of 12 Park Road which is accessed by the 9A driveway
Allambie Rise.

All construction access is to be obtained from Allambi Rise via the existing
easement subject to the following exceptions:

a) A crane may be used for delivering prefabricated materials and the pier
digging machine to the site.

The use of the crane in Park Road is to occur on two (2) separate days only,

first for the delivery of the pier digging machine and any prefabricated

materials, the second to retrieve the pier digging machine and provide any

further prefabricated materials as required.

Traffic control is to be provided for the use of the crane in Park Road, in

Page 33

accordance with the builders Traffic Management Plan.

b) Access from Park Road to the site is to be used for the purpose of a
concrete pumping pipe to be located at the base of the rock retaining wall
on the boundary of 10 Park Road, laid upon a composted wood chip mulch
600mm wide and 150mm thick. Any mulch contaminated by concrete or
wastes shall be removed from the site. Any remaining clean mulch may be
left in situ and spread to 50mm thickness.

MATERIALS HANDLING

As previously described all prefabricated building materials will be delivered to
site via Park Road. Manual! material handling will be employed throughout the
construction to minimize construction activities and impact on the site,
especially existing vegetation.

In addition a temporary builder's hoist a temporary scaffold platforms will be
erected in the existing driveway and within the property boundaries of 10
and 12 park road including a builders hoist over the existing Driveway to
accommodate the mini concrete pump waste grout receptacles and to
facilitate the easy removal of waste without using or traversing the road
reserve.

Temporary scaffold platforms and walkways will be constructed within the
property boundaries in accordance with the Tree Protection Plan & AS 4970 to
minimize foot traffic on the slope and compaction of soils when relocating
equipment.

Building waste will be collected and removed daily in a garbage trailer or light
truck located adjacent to the garage of No.10 Park Road. In order to minimize
waste and hence its removal, most building materials will be pre- engineered
and delivered to site pre-cut to the appropriate size.

Deliveries will be by light truck (6T) in small loads which will be
manhandled to site

At this stage it is envisaged that the following elements will be
pre- engineered prior to delivery:

Micro piles

Reinforcing steel for footings
Structural steel posts and bearers
Timber joists and flooring
Scaffolding support

e@ e@ @ © @

Page 34

CONSTRUCTION PROGRAMME

The proposed Construction Program is summarized below:

 

Operation

Month 1

Month 2

Month 3

Month 4

Month 5

Month 6

 

Site Establishment

#

 

New Access Path

#

 

Construct Working Platform

 

Install Micro Piles

 

Construct Pipe Caps

 

Erect Scaffolding

 

Construct steel columns and
bearers together with timber
Joists and decking to terrace.

 

Install Stormwater Reticulation

 

 

Install Landscaping

 

 

 

 

 

tk

 

 

ENVIRONMENT MANAGEMENT PLAN

The method of construction does require the use of a crane. This offers
significant environmental advantages as summarized below:

e By utilizing micro piling to ensure the stability of footings no tracked

 

machine will be required to access the site. The piling rig can be man

handled around the site after being craned into position utilizing

protective temporary walkways and level platforms installed in

accordance with AS 4970—2009

Manual material handling will be employed throughout the construction

to minimize construction activities and impact on the site, especially

existing vegetation.

All construction and materials handling will be undertaken beneath the

tree canopy thereby avoiding potential damage to the canopy

All significant and protected trees within the work area will be fenced
and or otherwise protected during construction in accordance with the
Tree Protection Plan Rev A 11/08/2017 prepared by Myles Baldwin
Design and in accordance with AS 4970—2009

The Builder is to utilize where possible all trades and workers who

were involved in building the residence on No. 12 Park Road. This will

Page 35

ensure that all workers understand the sensitivity of the site, the
importance of preserving the vegetation and the need to minimize
noise, dust and other building activity impacts on adjacent home
owners and the public.

e The working area will be minimized to protect any significant
vegetation

REMOVAL OF BUILDING WASTE

Building waste will be collected in a garbage trailer or light truck situated
adjacent to the garage of No. 10 Park Road. Sand spoil will be lowered daily
from the terrace platform to the garbage trailer or light truck located adjacent
to the garage of No.10 Park Road.

EROSION AND SEDIMENT CONTROL

Erosion and Sediment Control is considered for both work areas as
summarised below:

e The driveway to park Road will require silt fences to be installed to the
perimeter of the works. Sand bags will be placed in the gutters during
excavation and concreting to prevent runoff into the Council storm
water system.

e Erosion and Sediment Control for the proposed terrace will require a
silt fence to the perimeter of the proposed footing excavation.

e The permanent storm water drainage system will be connected to the
Council system as an early works operation to prevent any
concentrations of runoff discharging onto the sand slope.

Environmenial Controls Plan to prevent pollution from concreting operations
during the construction (Grouting & Pile Caps)

Background.

The use of concrete materials is reduced to a minimum due to the use of a micro
piling system which is to be craned onto site.

The small volumes of concrete required allow the use of a small concrete grout
pump with reduced line size to grout piles and concrete pile caps.

This system gives precise control to the operators making spillage and cleaning
requirements negligible.

Controls:

The builder/site manager will ensure the following best practice sediment control
measures including a designated wash down area are in place before work starts
and are adequately maintained throughout construction.

e The designated wash down area is to be located within the site on the
existing paved driveway with sediment control screening in place and an
appropriate HDP waste receptacle drum will be available to retain any
sediment waste from swept up spillage or cleaning of equipment.

Page 36

The receptacle drum will be exchanged as required, fitted with a sealed lid
and the contents removed from site regularly to the concrete supplier's
authorised off site recycling and disposal facility.

The builder/site manager will ensure all workers on the site are aware of
their responsibilities to minimise pollution including the concrete pump
operator who will directly monitor equipment to ensure leakage and spillage
does not occur.

The concrete supplier will selected on the basis that appropriate training has
been provided to their agitator truck drivers, and that they provide
appropriate details and resources to enable them to complete a delivery
without causing pollution.

The agitator truck driver who will be required to be familiar with the
Concrete Safe Site Delivery Guidelines (available from Cement Concrete &
Aggregates Australia at www.concrete.net.au under ‘A-Z Directory’) and will
have sufficient training and experience to deliver concrete to site and then
return to the batch plant without causing environmental harm through
spillage or leakage of concrete.

The driver will inspect and maintain the truck at ali times and will be
instructed to raise any concerns about the pollution controls on site with the
builder/site manager.

The driver must also ensure sediment is not tracked off site. If this occurs, it
will be swept up and put back into on site sediment receptacle drum.

Where possible, the delivery of concrete will occur within the site, using
small trucks, to ensure the risk of spillage contaminating the stormwater
system is minimised.

If site access is restricted and the delivery of concrete must occur on the
Street, appropriate sediment controls will be in place before pouring begins.

The builder/site manager will ensure that all appropriate sediment controls
are in place before the concrete pour starts.

Any spillage that does occurred during the delivery procedure will be swept
up before removing the sediment controls and concrete spillage will not be
hosed into the stormwater system.

Chutes, barrels, wheelbarrows and other equipment will be rinsed in the site
wash-down area.

To minimise the amount of wash-down water generated, excess concrete
will be scraped off equipment before it is washed.

Water in the wash down area will be contained and recycled as required and
not allowed to flow into the stormwater system.

Excess concrete will be returned back to the supplier’s depot.

The chute contents will be washed into the sediment receptacle drum and
sealed with a lid before leaving the site.

Page 37

The drum will be secured onto the main frame of the vehicle ready for
transportation.

The drum will be secured with a bracket that is easily accessible to the
operator.

The drum will be removed from the bracket and the waste water emptied

into the designated treatment facility once the truck returns to the yard with
ihe the wastewater containing suspended solids being recycled back into the
plant.

e The vehicle will be washed down at the depot.

e Delivery vehicles will be on paved surfaces at all times and so no mud soil
and or stones will be carried off site as pollutants.

e Inspect roads for any sediment that has been tracked off site and sweep it
back on site.
(This will be done if there is threat of rain and at the end of each day). A
hose will not be used to wash it away.

INSTALLATION OF PILES AND CAPPING

Methodology for installation of hollow bar micropiles as deep foundation support for
the new timber deck.

The micropiles consist of one or more outers steel casings installed to the
depths indicated on the piling subcontractor (PCA) drawings. A central steel
reinforcing element consisting of a 40/20 hollow bar is to extend to a pre-
determined design depth below the casing to form the bond length and develop
the applied load.

After checking the the project drawings for the details of the micropile
arrangement for each pile location (designed in accordance with the Tree
protection plan.) the Tree protection plan, the construction management plan
and relevant environmental protection documentation and instructions the rig
will be craned into position for the first pile onto a previously established level
temporary protective platform constructed in accordance with the tree
protection plan and AS4970 - 2009.

Drilling will be carried out using a 90mm EXxX drill bit using a rotary top hammer
for installation and all installation specifications accurately recorded for this and
all subsequent piles.

The piles are grouted as the work proceeds and any excess grout is collected
and pumped into storage containment for offsite disposal in accordance with
the concreting operations environmental protection plan.

The process is repeated for subsequent piles.

The onsite grouting pump will be contained within its own bunded area which
will be kept clean as the work proceeds and managed in accordance with the
above Environmental Controls Plan to prevent pollution from concreting
operations during the construction.

Pile capping is to be managed in the same way as the grouting procedures.

Page 38

TRAFFIC MANAGEMENT

The first operation will be the installation of the micro piles and excavation
of footings. During this stage the builder shall engage the services of a
traffic management company to ensure there is no interference to the
general traffic using Park Road. Traffic controllers will be required to be
present to divert vehicles during the installation of micro piles and
excavation of footings.

Traffic controllers will divert all vehicle deliveries and departures to the site
on Park Road. The timing of deliveries shall be such that they do not
coincide with peak usage times in Park Road.

Refer to Traffic Guidance Scheme prepared by Evolution Traffic Control
for details of proposed traffic management.

The builder warrants that using the procedures nominated above the
elevated terrace can be safely constructed with minimal impact on the
environment including the protected trees.

Original Construction management plan produced by

STEFAN PRYSTUPA, B.Eng (Civil); M.I.E.Aust; C.P.Eng; RPEQ Sep 2017

JOB NO, 17543

Page 39

 

"|
"s PCA-WI-001
D C A Work Instruction - Micropiling

 

AE GUND ENGINEERING Ca

Revision No: 4

Issue Date: 5/02/16

 

 

All Printed Copies are Uncontrolled

 

Page 1 of 7

 

12 PARK ROAD, NOOSA HEADS

MICROPILING WORK INSTRUCTION

MPO001

DRAFT

 

Page 40

 

 

PCA-WI-001
iS CA Work Instruction - Micropiling

 

MUTGROUND ENGINEERING aay Revision No: 4 Issue Date: 5/02/16

 

 

 

All Printed Copies are Uncontrolled Page 2 of 7

 

1.0 INTRODUCTION

This document has been created as a work instruction for the installation of hollow bar
micropiles (Micropiles) as deep foundation support for the 12 Park Road, Noosa Heads
project.

2.0 SCOPE

In summary, the project scope is to;

e Design and certification of a micropile foundation system to support the
construction of a new timber deck.

3.0 RESPONSIBILITY

The Project Manager shall be responsible for ensuring this work instruction is understood
and adhered to by all personnel involved in the project. In addition, the Project Manager will
ensure that all workers involved in carrying out work under this Work Instruction have read
and understood the current Work Method Statement that has been issued for this project
by PCA.

4.0 PROCEDURE
There are two main procedures undertaken in the process of installing Micropiles under this

work instruction. They are;
e Micropile installation
e Proof load testing

4.1 Micropile Installation

4.1.1 Pile details

The micropiles consist of one or more outers steel casings installed to the depths
indicated on PCA’s drawings. A central steel reinforcing element consisting of a 40/20
hollow bar is to extend to a pre-determined design depth below the casing to form the
bond length and develop the applied load.

 

Page 41

 

 

PCA-WI-001
Co CA Work Instruction - Micropiling

 

AUTEGROUND ENGINEERING Ui Revision No: 4 Issue Date: 5/02/16

 

 

 

All Printed Copies are Uncontrolled Page 3 of 7

 

4.1.2 Drill bit selection

Drilling will be carried out using a 90mm EXxX drill bit using a rotary top hammer for
installation.

4.1.3 Installation Records

The installation records for production piles will divided into two individual sets and
will include a minimum of the following information;

88.9x6mm Casing Installation

e Site location
e@ Names and positions of each piling crew member
e Date of installation of each casing
e Drill bit type
° Type of casing used
e Start time of each casing
e Completion time of each casing
e Length of casing including;
© Total length of casing
o Length of casing above ground
o Length of casing below ground
e Installed casing angle
e Pile number
e Drawing number
e@ Project number
e General comments

Hollow Bar Installation

e Site location

e Names and positions of each piling crew member
© Date of installation of each casing

© Drill bit type

e Start time of drilling the bond length

© Completion time of grouting the pile

 

Page 42

 

 

PCA-WI-001
p C A Work Instruction - Micropiling

MUM GROUND ENGINEERING Uiglaaly Revision No: 4 Issue Date: 5/02/16

 

 

 

 

All Printed Copies are Uncontrolled Page 4 of 7

 

Type and length of steel elements used including;
o Overall length of hollow bar
© Length of hollow bar above the casing
o Length of hollow bar below the top of the casing
Grout quantity
Pile number
Drawing number
Project number
General comments

Changes to the installation records may be required from time to time upon

approval of the Engineering Manager.

4.1.4

Site preparation for casing and micropile installation

Check the relevant project drawings for the details the micropile
arrangement for each pile location.

Assess environmental and safety requirements for carrying out the works to
ensure the micropiles can be installed within the project requirements.

Install gantry system and ensuring the gantry legs will not interfere with the
production piling activities.

Install scaffold to enable workers to set the drill and materials in position.
Establish a bunded area for the operation of the grout plant.

4.1.5 Drilling and Installation of Micropiles

This section of the work instruction sets out the procedures to be used to ensure the

successful installation of the micropiles.

Vi.

Setup the drill in position such that the steel casing can be guided into
position.

Assess grout management procedures to ensure excess grout can be
collected and pumped into storage containment for offsite disposal.

Assess environmental controls for noise and dust are suitable and meet the
requirements of the project.

Check the finished height required for the casing

Check that the casing is at the correct angle.

Drill the casing to the required depth.

 

Page 43

 

 

PCA-WI-001
2 C A Work Instruction - Micropiling

 

 

 

 

 

AUT EROUND ENGINEERING Uy Revision No: 4 Issue Date: 5/02/16
All Printed Copies are Uncontrolled Page 5of7
Vil. Double check the target depth taking into account the required bond length
for the hollow bars.
Vill. Advance the 90mm EXx drill bit through to the required depth.
IX. Once the target depth is reached, clear the hole with grout flush and pump
excess grout into containment bins for disposal.
4.1.6 Grouting operation

Grout is to be mixed on site and supplied as required. Grout will bé mixed to provide

a water/cement ratio of 0.45:1.

The Grout Plant Operator is responsible for the following aspects of the grouting

operation;

Mixing grout in accordance with the required mix design

Supplying sufficient grout quantities as requested by the Drill Head Worker
Cleaning and maintaining the grouting equipment

Ordering the correct grade and quantity of cement

Liaising with the PCA Support Team in regard to water usage

Excess grout from the grouting operation is to be pumped by PCA into grout
containment areas onsite and disposed of as required.

The grouting process includes the following steps;

Check the installation records for the drilled depth of the pile to be grouted.
Establish a waste grout container that can be used to store any leftover
grout.

Before pumping the grout to the pile, carry out a Baroid Mud Balance Test on
a grout sample to ensure it has been batched correctly. The target density is
1.89 +/- 0.05.

Clean up the grout plant and store away equipment until required. Ensure
the grout cubes (if required) are stored and labelled appropriately.

 

Page 44

 

 

PCA-WI-001
p C A Work Instruction - Micropiling

AONGROUND ENGINEERING Yay Revision Nad Issue Date: 5/02/16

 

 

 

 

All Printed Copies are Uncontrolled Page 6 of 7

 

4.2 Proof Load Testing

Onepile will be proof load tested in tension in accordance with AS2159 A2 Method

(Tension), the test procedure to be as follows;

I.

Il.
II.

Vi.
VIL.

VIN.

Level the ground either side of the test pile to ensure the reaction system can
lay flat and the test beam can be installed at the required levels.

Allow the test pile to cure insitu for a minimum of 72 hours.

Install the test rig such that it is positioned centrally over the test pile and
supported on a reaction system that is a minimum of 3 pile diameters from the
test pile. The test beam is to be installed such that the load can be applied
axially to the pile. This is done by ensuring the test beam is level and the
appropriate shims are used between the test beam and the reaction beams to
match the angle of the test pile.

Measurements of deflection will be taken by using two LVDT Macro Sensors
fixed to an independent reference beam. The macro sensors have a deflection
range of 100mm and are accurate to within 0.01mm. The Macro Sensors will be
positioned on both sides of the jacking plate which is positioned on top of the
jack and is at the pile head.

Measurements of load will be taken using a calibrated pressure sensor which
measures the applied load by the jack. Alternatively, a load cell may be used to
measure the applied load.

The jack will be a hydraulic jack capable of producing the required test load.
Both the deflection and load will be recorded on an electronic data logger
capable of taking 10 readings per second. Deflection and load data will be
displayed in real time and all data stored on a memory card for later analysis.

A load test report including graphs of applied load versus deflection will be
provided to PCA’s Engineering Manager for review upon completion of the test.
lt is anticipated that each test will take a minimum of 4 hours to complete and
will follow the loading plan on the load test record sheet.

 

Page 45

 

PCA-WI-001
(D CA Work Instruction - Micropiling

 

MMM GROUND ENGINEERING Uy Revision No:-4 Issue Date: 5/02/16

 

 

 

All Printed Copies are Uncontrolled Page 7 of 7

 

 

TRAINING OF THE FOLLOWING PERSONNEL HAS BEEN COMPLETED AND IS ACKNOWLEDGED.

 

Project

 

Print name Signature E Print name Signature

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Names of personnel who missed training

 

 

 

 

 

 

Details of trainer

 

 

 

 

 

 

Name: Signature: Date:
Position: Qualification

(where

necessary):

 

 

 

 

 

Page 46

CRANE OPERATION TRAFFIC GUIDANCE SCHEME

LEGEND

ACCREDITED TRAFFIC CONTROLLER
with Approved Stop / Slow Bat

 

 

 

TRAFFIC CONTROL VEHICLE
with Illuminated Flashing Arrowboard

 

LATERAL HAZARD MARKER
either 75-02 (Vertical) or T5-4 (Horizontal)

 

TRAFFIC CONES
er MUTCD Clause 3.9.1

 

PROPOSED WORK AREA
as advised by Cliont

PROPOSED PARKING LANE CLOSURE

 

HOUSE

SITE DETAILS 15m, DRIVEWAY
Ordered By: DANIEL BARTHO — 5-10 m—>+=—20 nd Taper
Contact #: 421968 969,

Onsite Contact: DANIEL 1
Mobile: ASABOVE
Order / Reft:

 

 

 

7 THIS AREA TO BE CONED OFF
WHEN CRANE IS ON SITE

Term: SHORT

Road Type:

Speed Limit:

Travelled Path:

Operation: STOPISLOWHOLD & RELEASE
Workers To Traffic: <12m

Proposed Start Date: MARCH2017

Proposed Duration: TBA

Proposed Hours: —06:0- 1800

 

/JYVLUAAO LON Od

 

 

 

 

- Minimum Requirements:
2 Traffic Controller's
1 Vehicle/’s with Warning Device

 

 

 

 

NOTES
= This Traffic Guidance Scheme has been
prepared in keeping with Evolution's
and our clients’, commitment to traffic
management, reporting and reviewing,

 

 

- COMPLIES WITH THE MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES.
PART 3 VERSION 7-1st July 2016 (MUTCD)

 

 

 

 

 

 

REDUCE SPEED

 

 

 

 

aes 15m
~ It is the responsibility of the Principal

andor Contractors to ensure tha all ; : clearance
documentation and signage is checked

and that all works are conducted in
accordance with the MUTCD, (Clause 1.5)

~All Signage to be positioned where
appropriate space allows. (Clause 4.1.6)

- Existing Signs & Traffic Control Devices
which are inappropriate to, of conflict
with, the site SHALL be fully covered
or removed. (Clause 2.4.4)

~The use of hand held two way UHF radios
are to be utilised where required to
communicate between traffic control &
site vehicles. (Clause 4.10.2)

~ Pedestrians, Bicycles, Wheelchairs & Public
‘Transport access to be considered where
Necessary around work area. (Clause 4.14.4)

= Traffic Guidance Scheme to be installed by
@ person with Queensland Department of
Transport & Main Roads "Traffic
Management Implementation’ Qualification

 

 

 

 

 

 

DATE DESCRIPTION : CLIENT:

BARTHO & SON
16/03/17 | PRODUCED FOR CLIENT REVIEW

 

SIGNATURE:

 

DRAWN BY:
Ant G i
LOCATION: | PARK ROAD Come Songer Fak

ePvoO I | t POV FICROSs S71: | HASTINGS STREET CHECKED sion:
masrecomen roses? |umeooiE go | =
Ema pate ulonriconay UBD MAP REF:| 9/J41 142510 00

 

 

REVISIONS

 

 

 

 

 

 

 

NOT TO SCALE

 

 

 

 

Page 47

 

LOCATION PLAN
NTS | GOOGLE MAPS

SITE PLAN
SCALE 1:200@A1

 

 

12 Park Rd

AERIAL PHOTO
NTS | GOOGLE MAPS

 

LEGEND
* EXISTING TREE

© TREETO BE REMOVED

G) PROPOSED TREE

———— TO BE DEMOLISHED

 

EXISTING

 

PROPOSED

DRAWING SCHEDULE

MB_12PR_30 COVER PAGE
MB_I2PR.31 LANDSCAPE PLAN

MB_12PR_32 ELEVATION / SECTION

MB_12PR_36 SITE AREAS

MB_12PR_37 SEWER SETBACK DETAIL

MB_12PR.38 EXISTING PLANTS

MB_12PR_40 LANDSCAPE PLAN - LOWER GROUND LEVEL
MB_12PR_41 LOWER GROUND LEVEL PLANTING PLAN
MB_12PR_42 LOWER GROUND LEVEL STRUCTURAL PLAN
MB_I2PR_43 EQUIPMENT PHOTOS

MB_12PR_SO TREE PROTECTION PLAN

PLANT SCHEDULE

TREES

CODE BOTANIC NAME (COMMON NAME QTY SE MATURE HEIGHT
Ah Acmena hemilampra Broadleave Lilly Pilly 8 400mm 4m

Eu Eucalyptus umbra Broad Leaved White Mahogany 1 TOOL 20m

SHRUBS

CODE BOTANIC NAME COMMON NAME QTY STE MATURE HEIGHT
SI Syzygium lvehmannii Small Leaved Lilly Pilly 10 300mm Sm
PERENNIALS:

CODE BOTANIC NAME (COMMON NAME QTY SIE = MATURE HEIGHT
Ac Alpinia caerulea Native Ginger 120 200mm 0.5m

NOTE: PROPOSED PLANT MATERIAL TO BE INSTALLED IN ACCESS ZONE FOLLOWING CONSTRUCTION. ALL PLANTS TO BE SET OUT ON SITE AS

BEST SUITED TO SITE CONDITIONS.

NOTES
ALL LANDSCAPE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S AND
ADDITIONAL CONSULTANT'S DRAWINGS, SPECIFICATIONS AND REPORTS.
ALL PUBLIC UTILITY SERVICES ARE TO BE LOCATED ON SITE BY THE CONTRACTOR PRIOR TO THE
(COMMENCEMENT OF WORKS. THE LOCATION, PRESENCE AND EXTENT OF SERVICES SHOWN ARE
NOT GUARANTEED COMPLETE OR CORRECT.
NO TREES PROTECTED UNDER THE LOCAL COUNCIL'S TREE PRESERVATION ORDER ARETO BE
REMOVED UNLESS APPROVED BY DEVELOPMENT CONSENT OR PERMIT OBTAINED FROM COUNCIL.
ALL PAVING IS INDICATIVE, TO BE TO FUTURE SPECIFICATION, AND SET OUT ON SITE.
ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE LOCAL COUNCIL'S APPROVAL,
STANDARDS AND CODES.
THE CONTRACTOR IS TO ENSURE THAT ALL THE WORKS ARE CARRIED OUT IN ACCORDANCE WITH

 
   
 

ALL SPECIFICATIONS FOR THE TIMBER AND STEEL SUPPORTS TO THE DECK ARE TO BE CROSS
REFERENCED WITH THE ENGINEERS SPEC. AND DETAILS.

 
 

 

RESIDENCE AT 12 PARK RD, NOOSA HEADS

 

 

C3 MYLES BALDWIN DESIGN

 

 

ae ‘CUENT:

PENINSULAR AVIATION PTY LIMITED TRUSTE
FOR THE PENINSULA AVIATION TRUST

 

THE DESIGNER MUST BE PRESENT ON-SITE FOR THE POSITIONING OF ALL PLANTS.

CONC CATON

  

    

7 BUILDER TO CHECK AND VERIFY ALL DIMENSIONS ON SITE PRIOR TO CONSTRUCTION,

‘CONTACT DESIGNER IF DISCREPANCIES OCCUR BETWEEN LANDSCAPE AND CONSULTANTS DOCUMENTS.

DRAWING: DWG No: M8_12PR.30 CHECKED: MB
COVER PAGE SCALE: 1:200@A1 DATE: 27.09.17
DRAWN: SM. Issue

Page 48

PROPOSED GARDEN BED WITH Acmena hemilampra,

5

Syzgium lvehmannii AND Alpinia caerulea. .
REFER TO DWG 40 FOR LOWER GROUND LEVEL

PROPOSED TIMBER DECK; Im HIGH BALUSTRADE WITH
STAINLESS STEEL WIRE INFILL TO MATCH EXISTING,
ARCHITECTURE

RETAINING WALL TO BE PARTIALLY DEMOLISHED.

 
  
 
 
  
  
 

PROPOSED STONE CLAD RETAINING WALL TO MATCH.
EXISTING WALL

 

EXISTING STONE BENCH
EXISTING STONE RETAINING WALL

 

 

  
 
 
 

EXISTING STAIRS AND RETAINING WALL

 

 

 
   
  
    

  

    

 

GO

 

fs
fe
{se
PROPOSED Eucalyptus umbra as _H
EXISTING SEWER PIPE ij
i
A
fj
=
Sy i
a y
Mn
i
: tity
NOTE
ALL STRUCTURE AND RETAINING WALLS TO ENGINEERS
DETAIL.
FROIECE AMENDMENT
sites BALDWIN DESIG RESIDENCE AT 12 PARK RD, NOOSA HEADS = ne osinee ste resex osteFs ie veanouNecr AL beans D pie LR aa
Sr een che OCC EE LNOEAR so SORT DNS TANDSCAPE PLAN ac Lae oe ati

 

 

‘CuENT:

PENINSULAR AVIATION PTY LIMITED TRUSTE!
FOR THE PENINSULA AVIATION TRUST

 

 

Page 49

TREE NUMBER HEIGHT
1

SPREAD

DIAMETER TYPE

 

 

  

 

 

 

 

 

TREE NUMBER HEIGHT
35

SPREAD

DIAMETER TYPE

 

 

 

 

 

  

 

 

 

 

 

  
 
 

 

 

   

   

 

  

  

 

 

  

 

 
   

 

 

 

 

15 8 os Lophostemon confertus 130 2 0.05 Syzygium australe
2 18 25 ot Plumeria obtusa 131 4 2 0.05 Cupaniopsis anarcardi
3 25 2 ot ‘Archontophoenix alexandrae 132 25 2 0.05 Syzygium australe
4 25 2 ot Archontophoenix alexandrae 133 4 3 0.07 Macaranga tanarius
5 18 7 0.25 Endiandra sieberi 134 15 05 0.02 Acmena hemilampra XISTING Chamaed
6 5 3 ot Acronychi 135 25 15 0.03 Acronychia imperforata CNS chance ree Oo
7 4 3 ot Acronychi 136 15 15 0.07 Corymbia intermedia PROPERTY OWNER
8 5 15 0.05 Acronychi 137 3 3 4 Glochidion sumatranum
8 18 1 0.05 ‘Acmena hemilampra 138 15 1 0.01 ‘Syzygium leuhmannii EXISTING GRASSED TERRACE
10 2 8 03 Endiandra sieberi 139 2 15 0.03 Acronychia imperforata
"1 6 4 0.05 Watethousea floribunda 140 3 2 ot ‘Scheffiera actinophylla
12 2 1 0.05 Cordyline manners-suttoniae 141 2 1 0.03 ‘Acmena hemilampra
13 25 2 o4 Archontophoenix alexandrae 142 15 os 0.01 ‘Acmena hemilampra
14 6 5 o4 Acronychia imperforata 143 25 15 0.03 ‘Syzygium leuhmannii
15 8 5 o4 Cupaniopsis anarcardioides 144 25 15 0.03 Acronychia imperforata
16 5 6 0.15 Archontophoenix alexandrae 145 18 1 0.02 Acmena hemilampra
7 a 4 02 Cyathea cooperi 148 35 1 0.05 Polyscias elegans
18 18 1 0.05 ‘Syzygium ‘Cascade’ 147 3 05 0.03 Polyscias elegans
19 18 06 0.05 Cordyline manners-suttoniae 148 18 05 0.01 ‘Acmena hemilampra
20 17 o7 0.05 Cordyline manners-suttoniae 149 18 1 0.01 Acronychia imperforata
21 5 4 ot Cryptocarya glaucesens 150 1 03 0.01 Cupaniopsis anarcardioides
2 12 1 0.05 ‘Syzygium ‘Cascade’ 151 2 2 4 Polyscias elegans
23 15 1 0.05 Cordyline manners-suttoniae 152 8 8 02 ‘Cupaniopsis anarcardicides
24 2 2 0.05 Alyxia ruscifolia 153 25 25 0.05 ‘Schinus terebinthifolius
25 1 a7 0.05 Acronychia imperforata 154 3 1 0.05 Syzygium australe
26 12 10 03 Lophostemon confertus 155 25 15 0.05 Waterhousea floribunda
2 6 5 0.15 Cyathea cooperi 156 15 2 0.07 Streltzia nicolai
28 18 12 06 Endiandra sieberi 157 25 3 0.07 Alectryon coriaceous
29 1 05 0.06 Cordyline manners-suttoniae 158 25 15 0.03 Syzygium leuhmannii
30 il o7 0.05 Syzygium ‘Cascade’ 159 15 1 0.02 Polyscias elegans
3 15 1 0.07 Cordyline manners-suttoniae 160 25 2 0.03 Elaeocarpus reticulatus
32 15 15 4 Cordyline manners-suttoniae 161 1 os 0.07 Dracaena fragrans
33 2 2 03 ‘Chamaedorea cataractarum 162 1 05 0.04 Dracaena fragrans
34 6 3 ot Acronychia imperforata 163 1 05 0.04 Dracaena fragrans
35 25 2 0.05 Scheffiera actinophylla 164 45 3 0.07 Acronychia imperforata
36 6 4 ot Waterhousea floribunda 165 18 Os 0.07 Dracaena fragrans
37 6 6 015 Acronychia imperforata 166 3 2 0.03 ‘Syzygium leuhmannii
38 10 8 oz Lophostemon confertus 167 1 0s 0.03 Cordyline manners-suttoniae
39 17 1 0.02 Elaeocarpus reticulatus 168 3 2 0.05 Glochidion sumatranum
40 417 1 0.05 Waterhousea floribunda 169 3 2 0.05 Cryptocarya foetida
a 17 1 0.05 Syzygium leuhmannii 170 15 1 0.05 Cordyline manners-suttoniae
2 17 15 0.05 Waterhousea floribunda 171 1 05 0.03 ‘Acmena herilampra
a 2 2 0.07 Waterhousea floribunda 172 1 05 0.03 Cordyline manners-suttoniae
4 3 4 0.07 Acronychia imperforata 173 18 25 0.05 Chamaedorea cataractarum
45 25 25 03 Chamaedorea cataractarum 174 15 1 0.03 Costus chartaceus
48 12 os 0.02 Syzygium ‘Cascade’ 175 18 15 0.03 Endiandra sieberi
47 1 1 0.02 Chamaedorea cataractarum 176 35 2 0.05 Cryptocarya glaucesens
48 2 2 0.02 Chamaedorea cataractarum 477 18 10 04 Cryptocarya glaucesens
9 10 8 015 Acronychia imperforata 178 18 2 0.05 Chamaedorea cataractarum
20 1 08 0.03 ‘Chamaedorea cataractarum 179 25 25 o4 Pandanus tectorius
51 12 12 ot 180 4 35 o4 Archontophoenix alexandrae
52 8 4 02 181 18 5 o4 Corymbia intermedia
53 1 1 0.02 ‘Chamaedorea cataractarum 182 18 05 0.05 Dracaena fragrans
54 1 1 0.02 ‘Chamaedorea cataractarum 183 2 1 0.05 Cordyline manners-suttoniae
55 1 1 0.02 Chamaedorea cataractarum TREE REMOVED
56 1 1 0.03 Chamaedorea cataractarum 185 1 05 0.02 Acmena hemilampra
57 1 1 0.02 Chamaedorea cataractarum 186 2 2 ot Pandanus tectorius
58 15 18 0.03 Chamaedorea cataractarum 187 25 di 0.03 Acmena hemilampra
59 1 1 0.03 Chamaedorea cataractarum 188 35 15 0.05 Cupaniopsis anarcardioides
60 18 2 0.04 Chamaedorea cataractarum 189 25 15 0.03 Syzygium leuhmannii
61 4 3 0.06 Waterhousea floribunda 190 35 e 0.07 Waterhousea floribunda
62 5 2 0.08 Waterhousea floribunda 191 3 1 0.03 Acronychia imperforata
63 15 2 0.03 Chamaedorea cataractarum 192 45 2 0.05 Waterhousea floribunda
64 1 1 0.03 Chamaedorea cataractarum 193 15 0s 0.05 Actonychia imperforata
65 15 1 0.03 Chamaedorea cataractarum 194 6 35 4 Sterculia quadiifida
66 13 1 0.03 Chamaedorea cataractarum 195 3 1 0.04 ‘Acmena hemilampra
67 13 1 0.03 Chamaedorea cataractarum 196 6 45 o4 Cupaniopsis anarcardioides
68 5 3 o4 Waterhousea floribunda 197 2 2 0.07 Archontophoenix alexandrae
69 3 15 0.05 Syzygium leuhmannii 198 6 4 ot Cupaniopsis anarcardioides
70 2 13 0.05 Waterhousea floribunda 199 1 os 0.02
a 25 2 0.07 Acronychia imperforata 200 2 18 0.03
72 28 2 0.07 Acronychia imperforata 201 35 18 0.05 Waterhousea floribunda
73 2 15 0.04 ‘Syzygium leuhmannii 202 18 1 0.03 Cryptocarya glaucesens
74 4 3 0.09 Acronychia imperforata 203 18 1 0.03 Cryptocarya glaucesens
75 2 08 0.03 ‘Syzygium leuhmannii 204 4 35 0.07 Agathis robusta EXISTING GARDEN
76 3 15 0.08 ‘Syzygium leuhmannii 205 25 2 0.07 ‘Archontophoenix alexandrae
7 2 o7 0.04 ‘Acmena hemilampra 206 18 1 0.02 Syzygium jambos
78 25 2 0.05 Waterhousea floribunda 207 18 1 0.03 Acronychia imperforata
79 3 2 0.08 Syzygium leuhmanni 208 2 1 0.02 Elaeocarpus obovatus
80 3 4 ot Acronychia imperforata 209 2 1 0.02 Elaeocarpus obovatus
at 22 15 0.04 Endiandra sieberi 210 25 15 0.03 Syzygium leuhmannii
82 6 35 ot Waterhousea floribunda 24 18 1 0.03 Acronychia imperforata
83 4 2 0.06 Waterhousea floribunda 212 25 2 0.05 ‘Syzygium leuhmanni EXITING POOL
84 1 os 0.01 Viburnum odorotissimum ‘Emerald lustre’ 213 35 35 0.07 waterhousea floribunda -
85 2 15 0.03 Dypsis lutescens 214 4 25 0.04 Acronychia imperforata /
86 25 3) 0.15 Glochidion sumatranum 215 4 2 0.03, ‘Syzygium leuhmanni YY //, f
a7 18 12 o4 Corymbia intermedia 216 35 2 0.03 Acronychia imperforata / EXISTING TIMBER DECK //
3 1.6 1 0.02 Viburnum odorotissimum ‘Emerald lustre’ 217 3 25 0.02 Archontophoenix alexandrae | f //
3 22 1 0.03 Cupaniopsis anarcardioides 218 2 15 0.02 Acronychia imperforata 7
90 1 os 0.01 Cordyline manners-suttoniae 219 3 15 0.02 ‘Syzygium leuhmanni EXISTING PLANT LOCATION PLAN
31 1 1 0.02 Dypsis lutescens 220 8 5 0.06 Cupaniopsis anarcardioides SCALE 1:100@A1
92 15 1 0.02 Aomena hemilampra 221 4 35 0.03 waterhousea floribunda EXISTING PLANTS AND APPROXIMATE QUANTITIES
93 18 2 0.03 Chamaedorea cataractarum 222 2 15 0.02 ‘Acmena hemilampra inns
94 15 15 0.05 Chamaedorea cataractarum 223, 6 4 0.04 waterhousea floribunda
95 15 18 0.05 Chamaedorea cataractarum 224 4 4 0.07 ‘Archontophoenix alexandrae dee MER PRGA SPREAD) PUMETED) TPE Hibiscus fil Hibiscus) - APROX. 1 PLANT EVERY Sm?
. jarpulia pendula ibiscus tliaceus (Hibiscus) - APROX. EVERY Sm
96 18 15 0.04 Chamaedorea cataractarum 225 14 r 03 ‘Archontophoenix cunninghamiana Ca 5 3 Ge pp ae etl
97 25 15 0.05 Acronychia imperforata 226 5 3 0.04 Agathis robusta : nl pt
at : am 261 1 0s 0.01 Acronychia imperforata
98 18 1 0.04 Syzygium ‘Cascade’ 27 3 2 0.02 Acronychia imperforata PERENNIALS
aaa 262 1 0s 0.02 Acronychia imperforata IA
99 16 1 0.04 ‘chamaedorea cataractarum 228 25 1 0.02 Syzygium jambos oes 5 z Ha Sryeirneihewn .
100 18 1 0.05 Acmena hemilampra 229 45 3 0.02 Acronychia imperforata cai a 5 por yao leuhman Alpinia zerumbet (Shell Ginger)- APROX.3 PLANTS/m*
101 25 1 0.05 ‘Syzygium leuhmannii 230 8 6 ot Cryptocarya glaucesens See é 5 Bos ‘Archontophoentx alexandrae Lomandra longifolia (Mat Rush}- APROX. 3 PLANTS/m#*
102 25 1 0.05 ‘Acmena hemilampra 231 35 25 0.03 Syzygium leuhmannii pe ‘ 3 an Cpanlonel aneroar eaten
103 25 1 0.05 Waterhousea floribunda 232 6 4 0.05, Acmena hemilampra oor 18 ‘3 ae Aanene henllenmea Lomandra hystrix - APROX. 3 PLANTS/m*
104 25 1 0.05 Waterhousea floribunda 233, 6 6 0.07 Harpulia pendula See oe e a horerythialinpertorate
105 25 1 0.05, Acmena hemilampra 234 2 15 0.02 Acmena hemilampra . ; i :
108 1 0s 0.03 ‘Acmena hemilampra 235 5 3 0.03 Lophostemon confertus be ° : oe ‘Bomena hernampra
. i Pt ” 270 15 8 05 Rhodosphaera rhodanthema GROUNDCOVERS
107 25 1 0.05 236 6 4 0.05 waterhousea floribunda oy a = OF icahrinebactontt :
108 25 1 0.05 237 14 12 0.45, Lophostemon confertus : Seales tereccomis Senecio serpens (Blue Chalksticks) - APROX. 6 PLANTS/m?
‘ 272 2 2 0.08 Archontophoenix alexandrae
109 4 6 0.15 Ficus rubiginosa 238 2 18 0.03 Syzygium leuhmanni
273, 7 ES 0.06 ‘Acmena hemilampra
110 20 16 o7 Lophostemon confertus 239 7 3 0.05 Waterhousea floribunda Be é 5 oor archottophuent Clevandrae
411 3 4 0.15 Acmena hemilampra 240 15 3 0.02 ‘Cupaniopsis anarcardioides 275 6 3 002 iacmerta: hemilampra NOTE: ALL PLANTS PLANTED BY PROPERTY OWNER. PLANT MATERIAL TO BE RETAINED
112 35 15 0.07 Cupaniopsis anarcardioides 241 15 15 0.02 Syzygium leuhmanni oe Fi as ns Syzygium leuhmanni WHERE POSSIBLE AND REPLANTED AS NEEDED AT COMPLETION OF WORKS
113 35 15 0.07 Cupaniopsis anarcardioides 242 5 3 0.05 ‘Acmena hemilampra y
lopsi 4 277 5 2 0.05 ‘Acmena hemilampra
114 35 15 0.07 Cupaniopsis anarcardioides 243, 7 4 0.07 Waterhousea floribunda ds ,
: 278 35 15 0.05 ‘Syzygium leuhmannii
115 3 15 ot ‘Acmena hemilampra 244 3 2 0.03 Waterhousea floribunda i
q : 279 6 4 ot Archontophoenix alexandrae
116 2 2 0.15 Pandanus tectorius 245 8 4 0.08 Harpulia pendula :
SI : 280 25 2 0.08 ‘Acmena hemilampra
117 35 4 ot ‘Alectryon coriaceous 246 14 8 04 Corymbia trachyphloia i
i 281 2 1 0.05 Schefflera actinophylla
118 25 1 0.05 ‘Acmena hemilampra 247 4 15 0.03 ‘Syzygium leuhmanni oe 3 is a8 Foronychia eipe tenia
119 3 25 0.15 Pandanus tectorius 248 6 2 0.07 Waterhousea floribunda Sas i oS 0.07 poronictia nnertorata
120 25 2 0.05 ‘Acmena hemilampra 249 5 2 0.07 Acmena hemilampra one i 5 oop 3 in elvnannt
121 25 15 0.05 Syzygium leuhmanni 250 5 2 0.03 Aoronychia imperforata ‘i ‘bebe
ve 285 4 25 0.07 Acronychia imperforata
122 2 1 0.03 Acronychia imperforata 251 4 2 0.05 Agathis robusta one 35 Es oes Syeveum leurs
123, 25 1 0.03 252 5 4 0.07 Archontophoenix alexandrae ¥ ; Ae cf
i 287 25 15 0.04 Acmena hemilampra
124 25 18 0.05 253 3 2 0.04 ‘Syzygium leuhmani
288 2 1 0.05 Yucca elephantipes
125 18 os 0.01 254 4 2 0.03 ‘Syzygium leuhmanni :
i 289 4 4 0.07 Acronychia imperforata
126 2 2 0.05 Acronychia imperforata 255 18 1 0.01 Acronychia imperforata
230 55 45 o4 Acmena hemilampra
127 4 3 0.07 Gloc 256 15 1 0.01 ‘Acmena hemilampra
: 291 25 35 0.08 Archontophoenix alexandrae
128 35 35 0.07 Alectryon coriaceous 257 2 1 0.02 ‘Syzygium leuhmani ea ie is 003 Conk enn
129 3 4 0.12 Pandanus tectorius 258 5 2 0.05 ‘Acmena hemilampra . ponding ftranniere-sutioniae
293 1 1 02 Acronychia imperforata
PROJECT:
RESIDENCE AT 12 PARK RD, NOOSA HEADS THE DESIGNER MUST BE PRESENT ON-SITE FOR THE POSITIONING OF ALL PLANTS. DRAWING: OWGNo: MBI2R.98 CHECKED: MB
CONTACT DESIGNER if DSCREPANCIES OCCUR BETWEEN LANDSCAPE AND CONSULTANTS DOCUMENTS. EXISTING PLANTS SCALE: 1:100@A1 DATE 27.09.17
‘CUNT:
{SUILDER TO CHECK AND VERIFY ALL DIMENSIONS ON SIE PRIOR TO CONSTRUCTION. DRAWN: SM suc
PENINSULAR AVIATION PTY LIMITED TRUSTE! swsceawnicw coeur

FOR THE PENINSULA AVIATION TRUST

Page 50

RETAINING WALL TO BE PARTIALLY DEMOLISHED.

PLANTING DETAIL PLAN, REFER TO LOWER GROUND
LEVEL PLANTING PLAN ON DWG MB_12PR_41

 

STRUCTURAL PLAN, REFER TO LOWER GROUND LEVEL
‘STRUCTURAL PLAN ON DWG MB_12PR_42

 

ALL STRUCTURE TO MINIMIZE IMPACT ON TREE ROOT =
ZONES. STRUCTURE TO ENG. SPEC.) \

A

\

 

      
     

PROPOSED Eucalyptus umbra 4

 

°

/ /
U/ jo) | k
EXISTING SEWER PIPE ————~-#4 -# _e if)

9 Y
7

ay
=
>
LS
Ss

pS |
IS
=

tn

 

 

   

 

NOTE
ALL STRUCTURE AND RETAINING WALLS TO ENGINEERS.
DETAIL.
oo
POORCE, AMENDMENT

MYLES BALDWIN DESIGN RESIDENCE AT 12 PARK RD, NOOSA HEADS os ‘eevee nuuae reser OnORETEH RERUNS CRA RTITE ec phono: weiaeeo  eeexeDe as

ut ae — CONTACT DESIGNER OSCREPANCES OCCUR EETWEEN LANDSCAPE aNO CONSIATANTS DOCUMENTS LANDSCAPE PLAN - LOWER SCAI: ID@A OME 7007

fras Be MSULNG ASTON PIV LIMITED IRLSTE ULDEYTO GHEE AND VEReY AU SRABROONEON SRE MOTO COHSHRUCTN GROUND EVEL DRAIN BA ot

 

FOR THE PENINSULA AVIATION TRUST.

 

Page 51

ae

‘ALL MICRO PILES, CAP AND DECK STRUCTURE TO ENG.
SPEC.

  

EXISTING SEWER PIPE

PROPOSED Eucalyptus umbra

NOTE

ALL STRUCTURE AND RETAINING WALLS TO ENGINEERS DETAIL.

THE FINAL POSITION OF PILES, FOOTINGS AND SUBSEQUENT COLUMNS WILL BE DETERMINED IN CONSULTATION WITH
‘THE ARBORIST AND ON SITE ADVICE, WITH THE STRUCTURE AMENDED TO SUIT THE SETOUT.

 

 

 

 

—
MYLES BALDWIN DESIGN RESIDENCE AT 12 PARK RD, NOOSA HEADS ‘He DEIGNER ist asia OnsrEZOR WePoEMONNG OeALLAANTE eae ee ee
Tell Lane Ae ber Nise aan init bese ce ice ocean Tutt eam SSE, LOWER GROUND LEVEL sam ies WE Zon
EEN NLS PENINSULAR AVIATION PTY LIMITED TRUSTE! ENN INNS ; STRUCTURAL PLAN oes we

 

 

FOR THE PENINSULA AVIATION TRUST : ree onanmics common

Page 52

ALLMICRO PILES, CAP AND DECK STRUCTURE TO ENG.
SPEC.

  

9
EXISTING SEWER PIPE

PROPOSED Eucalyptus umbra

NOTE

ALL STRUCTURE AND RETAINING WALLS TO ENGINEERS DETAIL,

THE FINAL POSITION OF PILES, FOOTINGS AND SUBSEQUENT COLUMNS WILL BE DETERMINED IN CONSULTATION WITH
THE ARBORIST AND ON SITE ADVICE, WITH THE STRUCTURE AMENDED TO SUIT THE SETOUT.

 

 

 

 

—
pOCLEs BALDWIN DESICN RESIDENCE AT 12 PARK RD, NOOSA HEADS eosone sepa oseoeHeFoonner Aa a So Te a
Bee BALDWIN DESIGN. _. — CATS Dante | entice ic eve Macs aot TECcoe TOWER GROUND LEVEL Dp ee ee eee,
Pare Sm SU Ais RYIAIIGIN FEY LINIIETRUSTE sina bchetmonntatsuesouonsreton scammers Seas ae =:

FOR THE PENINSULA AVIATION TRUST Meowmicss corer

Page 53

‘ALL MICRO PILES, CAP AND DECK STRUCTURE TO ENG.
SPEC,

EXISTING SEWER PIPE

PROPOSED Eucalyptus umbra

NOTE

ALL STRUCTURE AND RETAINING WALLS TO ENGINEERS DETAIL,

THE FINAL POSITION OF PILES, FOOTINGS AND SUBSEQUENT COLUMNS WILL BE DETERMINED IN CONSULTATION WITH
‘THE ARBORIST AND ON SITE ADVICE, WITH THE STRUCTURE AMENDED TO SUIT THE SETOUT.

 

 

 

 

ace
sites RARETRIN DETER RESIDENCE AT 12 PARK RD, NOOSA HEADS ee ooame: Dict: mse EOD:

Fr bebe a lavancall Rrra Fas Ni 38 cen HRDETOCHECKARDVERTFAL HORONSONSIEMERTOCORIUCIOL POWER GROUND TEVEL D o_o
PHASER Tauren PENINSULAR AVIATION PTY LIMITED TRUSTE STRUCTURAL PLAN “ms ssn scorn

FOR THE PENINSULA AVIATION TRUST

 

Page 54

 

SIGNIFICANT TREE LIST

TREE NUMBER HEIGHT SPREAD DIAMETER
26 12

10 03
87 18 12 04
177 18 10 04
181 18 5 04
an 20 12 o7
LEGEND

DIAMETER AT BREAST HEIGHT (DBH)

TREE PROTECTION ZONE (TPZ)

 

‘STRUCTURAL ROOT ZONE (SRZ)

TYPE

Lophostemon confertus
Corymbia intermedia
Cryptocarya glaucesens
Corymbia intermedia
Eucalyptus tereticornis

 

 

 

 

/ - oN
it \ 10x 08H
\ 1
\ /
—
J
RS
ah
9
Uff yy Yj /
Yj
Y//f
i]
Wy / NOTE
ALL STRUCTURE AND RETAINING WALLS TO ENGINEERS
DETAIL.
RESIDENCE AT 12 PARK RD, NOOSA HEADS| 2220" se oesone sere ovsteton erosion cea re ee
MYLES BALDWIN DESIGN - yoactoseteerbscteines coz eves aoseats nn oxsutANs SSCUNENS TREE PROTECTION PLAN dd) SAE 1eea © oe pari?
SERNSULAR AVIATION PIY LINTED TRUSTE SSE ESS eee moose ee ee a

FOR THE PENINSULA AVIATION TRUST

 

Page 55

— ee

  

ef) NOOSA COUNCII

  

   

4

INTERNAL MEMO For Action (For Information

Ste coors s
Date 25.09.2017 ECM Ref: = 132003.221152.5 & Case/3814/2016
To: Wakefield Sykes
From: Kerri Coyle

Subject 132003.221152.5 & CASE / 3814/2016 - PLANNING & ENVIRONMENT COURT
APPEAL 3184 OF 2016 - CHANGE TO AN EXISTING APPROVAL FOR MCU FORA
DWELLING TO INCLUDE AN UNROOFED DECK AND RETAINING WALL AT 12 PARK
RD, NOOSA HEADS

 

Council note the report by the Manager, Development Assessment to the Planning & Environment Committee
Meeting dated 12 September 2017 regarding Planning & Environment Court Appeal 3184 of 2016 and agree
to settle the appeai generally in accordance with the following conditions:

Additional Conditions (Deck and Terrace Area)

4, Development undertaken in accordance with this approval must comply with the following plans as
amended by these conditions.

 

MB_12PR_30 i | . Cover Sheet, prepared by Myles Baldwin Design i 10/08/17
MB_ 12PR_ 31 dscape Plan, prepared by Myles Baldwin | Design : 10/08/17

   

    

 

‘MB 12PR_, 32 : Elevation / Section, prepared by Myles Baldwin Design : 0/08/17 4

“MB_1 12PR_36 £ Site Areas, prepared by Myles Baldwin Design “40/08/17

MB_ 42PR_. 37H Sewer Setback Detail, prepared by Myles Baldwin “40/08/17
Design

MB_ 12PR 38 BO “Existing F Plants, prepared by Myles Baldwin Design 21/02/17

“MB.1 12PR 40 1 Landscape Plan — Lower Ground Level, prepared by 10/08/17

Myles Baldwin Design

“MB_12PR_41. E Lower Ground Level Planting Plan, prepared by Myles 10/08/17
Baldwin Design

MB_12PR_42 E _ ‘Lower ¢ Ground Level Structural Plan, prepared by Myles 10/08/17
| Baldwin Design

MB_ 12PR 43 ; AL ~_ Equipment Photos, prepared by Myles Baldwin Design / 20/03/17

MB 12PR_ “50 Cc Tree Protection Plan, prepared by Myles Baldwin / 40/08/17
_ Design — |

2. The following amendments are required to the plans for the development and are to be submitted for
approval prior to obtaining a development permit for operational work (landscaping):

a. MB_12PR_30 — Cover Sheet, the notes are to be updated to reflect the timber and steel support
construction being proposed for the deck and terrace area. The blue fine showing a pedestrian
construction access is to be removed. The trees shown in red signifying they are to be removed
from the road reserve are to be shown black signifying they are to be retained;

b. MB_12PR_31 — Landscape Plan, is to be amended with the trees shown in red signifying they
are to be removed from the road reserve to be shown black signifying they are to be retained.
The note referring to the temporary construction access and the associated blue line is to be
removed;

v1 9/1/2014

Page 56

 

M1

vo eo

c. MB_12PR_38 — Existing Plants, the notes referring to the existing plants planted in the road
reserve by the owner are to be removed. All trees shown in red signifying they are to be removed
from the road reserve are to be shown black signifying they are to be retained:

d. MB_12PR_40 — Landscape Plan — Lower Ground Level, the note referring to the temporary
construction access and the associated blue line is to be removed;

e. MB_12PR_41 — Lower Ground Level Planting Plan, the note referring to the temporary
construction access and the associated blue line is to be removed. All trees shown in red
signifying they are to be removed from the road reserve are to be shown black signifying they are
to be retained. The notes are to be removed and replaced with a note that states — A/l work on
the subject site is be undertaken strictly in accordance with the approved Tree Protection Plan,
Development Permit for Operational Works (Landscaping), Construction Management Plan and
conditions of approval;

f. MB_12PR_42 — Lower Ground Level Structural Plan, the note referring to the temporary
construction access and the associated blue line is to be removed. All trees shown in red
signifying they are to be removed from the road reserve are to be shown black signifying they are
to be retained;

g. MB_12PR_50 — Tree Protection Plan, the blue line which refers to the temporary construction
access is to be removed from the plan.

The north western edge of the deck is to be located not less than 1m from the property boundary
adjoining Park Road, and located not less than 2.6m from the north eastern boundary, and not less thee,
5.3m from the south western boundary, as shown on the approved plans of development. he

 

The deck is to be designed so that ail piers are located clear of the Tree Protection Zone (TPZ) of the
following trees 26, 87, 177 and 181, as shown on Drawing No. MB_12PR_50 — Tree Protection Plan.
No works or access to the TPZ of these trees is permitted without approval from the Council or its
arborist. Tree number 184, being Ficus macrophylla has been removed and can be deleted from the
approved plans, with any references to this tree deleted from the associated management plans referred
to in the conditions.

The Appellant is to amend the Tree Protection Plan, Revision A, dated 11 August 2017 to address the
following:

a. the location and size of any scaffolding that is to be erected for the construction of the deck in
relation to the Tree Protection Zone (TPZ);

b. details of the work required (if any) to be undertaken within the Tree Protection Zone (TPZ),
having regard to the intent of the Tree Protection Plan, to prevent any damage being caused to
the trees identified in the plan;

c. remove all reference to removal of trees. Reference to any works within the TPZ or access through
a TPZ to be stated as only permitted in accordance with the prior approval of the Council or its
arborist; em
; my

a
d. the TPZ shall be protected as per the requirements of AS 4970 — 2009, including the use of fenced”
to prevent entry into the TPZ, and composted mulches to minimise soil and root damage; and

e. the Tree Protection Plan is to outline the specific tree procedures (i.e. dimensional data, species
and methods for protection and minimization of detrimental effects) to be compliant with AS 4970-
2009. The document should contain the methodology for pile installation, grouting and capping
processes.

The proposed deck and terrace area is to be constructed of light weight building elements including a
timber decking system, 1m high balustrading with stainless steel wire infill, supported on a suspended
steel structure, with the retaining walls being stone cladded, in accordance with the approved plans of
development.

The 1m setback area and the area beneath the deck, shall be densely landscaped to screen the deck
from view off site. The development is to be landscaped generally in accordance with Drawing No.
MB_12PR_40 — Landscape Plan Lower Ground Level and Drawing No. MB_12PR_41 — Lower Ground
Level Planting Plan. The applicant is required to obtain a development permit for operation works
(landscaping) prior to the removal of any vegetation from the site area affected by the development.

Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted
to Council, to secure performance of all conditions of this approval, prior to the issue of a development
permit for operational work (landscaping). The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect of enforcing

9/1/2014

Page 57

moe oe

10.

41.

12.

13.

performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.

The works must comply with the terms of Easements A & B on RP 177551 located within the subject
land and 9A Allambi Rise, Noosa Heads.

All construction access is to be obtained from Allambi Rise via the existing easement subject to the
following exceptions:

a. a crane may be used for delivering prefabricated materials and the pier digging machine to the
site. The use of the crane in Park Road is to occur on two (2) separate days only, first for the
delivery of the pier digging machine and any prefabricated materials, the second to retrieve the
pier digging machine and provide any further prefabricated materials as required;

b. traffic contro! is to be provided for the use of the crane in Park Road, in accordance with the
Appellant's Traffic Management Plan, prepared by Evolution Traffic Control, Drawing No. 142510,
Revision 00, dated 16 March 2017;

c. access from Park Road to the site is permitted for the purpose of a concrete pumping pipe to be
located at the base of the rock retaining wall on the boundary of 10 Park Road, laid upon a
composted wood chip mulch 600mm wide and 150mm thick. Any mulch contaminated by concrete
or wastes shall be removed from the site. Any remaining clean mulch may be left in situ and
spread to 50mm thickness; and

d. the Appellant is able to use the driveway at 10 Park Road for the removal of waste material from
the site. All waste from the site is to be loaded into the vehicle parked in the driveway from within
10 Park Road and not by using the road reserve.

The works must be carried out in accordance with an approved Construction Management Plan for the
development. The Construction Management Plan dated 74!h August 2017 is to be amended to address
the conditions of approval to the reasonable satisfaction of the Council. The Appellant shall submit an
amended Construction Management Plan for approval with the development application for operational
works (landscaping).

The Appellant shall meet the reasonable costs of inspection by the Council’s arborist of the location of
the footings for the deck which shall be to his reasonable satisfaction prior to the work proceeding. The
Appellant shall also meet the Council’s reasonable costs of its arborist inspecting the works to ensure
compliance with the conditions of approval.

No trees are to be removed from the site other than those shown in red on the approved plans signifying
they are to be removed. No trees are to be removed from the road reserve as part of the development.

Can you piease take the necessary action.

Kerri Coyle
Manager Development Assessment

v1

9/1/2014

Used in these records

About this file

File size
26.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW17-0561.pdf · 26.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.