Council archive · source document
Operational Works Application OPW17-0561 · OPW17/0561
Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
MYLES BALDWIN DESIGN are to be removed and the roots covered with river sand or other coarse granular fill before replacing the soil. Builder's sand is not to be used, as its high salt content can be toxic fo roots. + The advice of an Arboriculturist should be sought where underground structures present within the TPZ are/will become redundant. in general it is preferable fo leave such structures in situ and seal them off as this avoids the need for significant excavation. + All works within a TPZ must be supervised by the project Arborist and are to be carried oui according to the Australian Standard 4970-2009 and as permitted in accordance with the prior approval of the Council. Construction Work Within A TPZ * Prior fo installation of a new ground surface, existing ground cover vegetation should be killed using an appropriate herbicide e.g. Glyphosate based products. Herbicides that can leach through the soil e.g. products containing Sodium Chiorate should not be used. Once dead, the vegetation and loose organic matter should be removed from the soil surface using hand toois. * — If ground levels are fo be raised with a TPZ ihis should be achieved by use of a granular material that does not inhibit vertical gaseous diffusion e.g. gap graded fill. Depending upon the load bearing capacity of the soil it may be necessary fo install a load suspension layer such as a cellular confinement system. + Works within the TPZ may be permitted for the construction of approved works such as modified footings (e.g. pier and beam, cantilevered slab etc.), designed fo minimise the impact upon the root system of the tree. Any excavation must be carried out by hand and is to avoid damaging the proiective bark of any tree roots encountered. Should any roots over 25mm diameter be encountered, then the location of the modified footing must be adjusted as required to prevent damage to these roots. Roots smaller than 25mm diameter may be pruned back using a sharp saw or secafeurs. Where appropriaie the project Arborist may be required fo supervise excavations and consult with the project Engineer as fo the relocation of modified footings etc. + Works within the TPZ may be permitted for the construction of above grade slabs and pavements, designed fo minimise the impact upon the root system of the tree. In concentration carbon dioxide is detrimental to tree root function. Because this gas principally diffuses vertically through the soil, new impermeable surfacing within a TPZ should where possible be resiricted to a maximum width of 3m and situated tangentially to one side of a tree only, or confined to an area no greater that 10% of the TPZ. + All works within a TPZ must be supervised by the project Arborist and are to be carried out according to the Australian Standard 4970-2009 and as permitted in accordance with the prior approval of the Council. 12 PARK ROAD 1A / 357 - 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 29699 2622 12 NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW17-0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.