Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Operational Works Application OPW17-0561 · OPW17/0561

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Department of Infrastructure, Local Government and Plann

Section 2 — Further development details

 

 

 

Does the proposed development applicatio olVe any of the following
Material change of use (J Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot LJ Yes — complete division 2

Operational work Yes ~ complete division 3

Building work (J Yes — complete DA Form 2 — Building work details

 

 

 

Division 1 ~ Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
Planning instrument.

8.1) Describe the proposed material Change ofuse.

  

Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use {include each definition in a new row) - units (if applicable) area (m?)
(if applicable)

 

 

 

 

 

 

 

 
   

GP) Dees ie deceit lm ilieemeciicnco
(1 Yes
XJ No

 

 

 

 

 

 

Division 2 — Reconfiguring a lot
Note; This division is only required to be completed if any part of the development application involves reconfiguring a lot.

Sep) What is the total number of existing lots making up the premises?

   

ne reconfiguration? (ick eM Eee fee

 

 

 

ml ubdivision (complete 10)) [] Dividing land into parts by agreement (complete 711)
["] Boundary realignment (complete 12)) [1] Creating or changing an easement giving access to a lot from
a construction road (complete 13))

 

 
    

| 10) Subdivision (
yi0-1) For this development, how many lots are being created and ea Seine Malia re ir o)y es fe

Commercial Industrial Other, please specify:

  

   
 

Residential

  

Intended use of lots created

  

 

   
 

 

 

Number of lots created
10.2) Will the subdivision be staged?
[_] Yes ~ provide additional details below
LI No

How many stages will the works include?

What stage(s) will this development application
apply to?

 

  
   

 

 

 

     

10) ‘Dividing land into Pate by. ou Stet many na ate Ee created and Wie iS iS ORES ieee ii
[elise | i :

Intended use of parts created

      
 

      

  

    

Residential Commercial | Industrial Other, please specify:

 

 

 

 

 

 

Number of parts created

 

Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017

Used in these records

About this file

File size
26.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW17-0561.pdf · 26.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.