Council archive · source document
Operational Works Application OPW17-0561 · OPW17/0561
Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
moe oe 10. 41. 12. 13. performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. The works must comply with the terms of Easements A & B on RP 177551 located within the subject land and 9A Allambi Rise, Noosa Heads. All construction access is to be obtained from Allambi Rise via the existing easement subject to the following exceptions: a. a crane may be used for delivering prefabricated materials and the pier digging machine to the site. The use of the crane in Park Road is to occur on two (2) separate days only, first for the delivery of the pier digging machine and any prefabricated materials, the second to retrieve the pier digging machine and provide any further prefabricated materials as required; b. traffic contro! is to be provided for the use of the crane in Park Road, in accordance with the Appellant's Traffic Management Plan, prepared by Evolution Traffic Control, Drawing No. 142510, Revision 00, dated 16 March 2017; c. access from Park Road to the site is permitted for the purpose of a concrete pumping pipe to be located at the base of the rock retaining wall on the boundary of 10 Park Road, laid upon a composted wood chip mulch 600mm wide and 150mm thick. Any mulch contaminated by concrete or wastes shall be removed from the site. Any remaining clean mulch may be left in situ and spread to 50mm thickness; and d. the Appellant is able to use the driveway at 10 Park Road for the removal of waste material from the site. All waste from the site is to be loaded into the vehicle parked in the driveway from within 10 Park Road and not by using the road reserve. The works must be carried out in accordance with an approved Construction Management Plan for the development. The Construction Management Plan dated 74!h August 2017 is to be amended to address the conditions of approval to the reasonable satisfaction of the Council. The Appellant shall submit an amended Construction Management Plan for approval with the development application for operational works (landscaping). The Appellant shall meet the reasonable costs of inspection by the Council’s arborist of the location of the footings for the deck which shall be to his reasonable satisfaction prior to the work proceeding. The Appellant shall also meet the Council’s reasonable costs of its arborist inspecting the works to ensure compliance with the conditions of approval. No trees are to be removed from the site other than those shown in red on the approved plans signifying they are to be removed. No trees are to be removed from the road reserve as part of the development. Can you piease take the necessary action. Kerri Coyle Manager Development Assessment v1 9/1/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW17-0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.