Approved Plans OPW25-0057
Plans and drawings: the text below has words only, no drawings.
Very large file (20.9 MB): may take a few minutes to open.
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
-
2D
APPROVED PLAN Planting stock as per planting plan D
and schedule. Planting hole two
OPW25/0057 times wider than plant pot size 100mm mulch as per specification
NOOSA COUNCIL
100
20 AUG 2025
100
100mm depth composted organic
mulch as specified avoiding contact
with plant stem.
Topsoil laid to minimum 300mm
300
300
depth to specification. Fertiliser to
Min. 300mm Topsoil - refer to be applied to Manufacturer's
specification recommendations.
AS2303:2018-Tree Stock for
Landscape Use compliant tree Slow release fertilizer and water
150
stock with Arborist certification - retention crystals installed as per
150
refer to Specification notes. manufacturers recommendations.
Species and pot size as per Choose appropriate fertilser for
schedule. Stem taper finished flush species selection.
with finished soil level, allow for De-compacted subsoil to 150mm
settlement. depth.Ensure all garden bed areas
150mm depth ripped/cultivated and and tree pits are free draining.
38x38x1800mm Hardwood stakes ameliorated subsoil
driven into ground avoiding Existing subgrade
rootball.
Woven polyethylene based
polyfabric tree tie. 50mm width. 3 TYPICAL 300mm POT SIZE PLANTING DETAIL - General Planting Area 5 TYPICAL PLANTING AREA PROFILE - General Planting Area
Secured loosely with figure eight - Scale 1:10 L500 Scale 1:10
loop and fixed to stake with
galvanised stapes
Guying ties 2/3 up trunk
2D
100mm depth organic mulch as per D
Specification - avoiding contact with
tree stem. 100mm mulch as per specification
Excavate tree pit to the depth of
Topsoil laid to minimum 100mm
100
rootball and cultivate to a width of 2-3
times the diameter of rootball. Rip the depth to specification. Fertiliser to
be applied to Manufacturer's
100
edges of the pit and back fill with
0.5m3 topsoil as per specification recommendations.
Planting stock as per planting plan
150
and schedule. Planting hole two
Slow release fertilizer and water times wider than plant pot size and
retention crystals installed as per to the depth of the rootball. FL
manufacturers recommendations.
100
100mm depth composted organic De-compacted subsoil to 150mm
Choose appropriate fertilser for mulch as specified avoiding contact depth.Ensure all garden bed areas
species selection. with plant stem. and tree pits are free draining.
Existing subgrade
Existing subgrade
300
300mm depth topsoil - refer to
All timber products to have Forest specification
Stewardship Council® (FSC®) Chain Diameter of hole 3x Rootball width
of Custody certification
150
Place slow release fertilizer and 6 TYPICAL REVEGETATION PLANTING PROFILE - Amenity Reveg Area
1 TYPICAL ADVANCED TREE PLANTING water retention crystals installed as L500 Scale 1:10
L500 Scale 1:10 per manufacturers
recommendations. Choose
appropriate fertilser for species
selection.
150mm depth ripped/cultivated and
ameliorated subsoil
NOTES
Following laying of turf irrigate immediately until
Tree as per plans. Species and 4 TYPICAL 25L AND 300mm POT SIZE PLANTING DETAIL topsoil is moistened to full depth. Ensure irrigation
pot size as per schedule. Refer to regime is carried out until grass is fully established.
L500 Scale 1:10 Turf as specified. Grass to be laid along
Advance Tree Planting Detail contours with staggered, close butted joints so
2000
Turf to be rolled to provide an even surface free of
Turf as specified that finished turf surface is flush with adjacent depressions and bumps.
surface levels. Desirable maximum slope
gradient 1:6 (though 1:4 is acceptable where
Timber edge as specified necessary)
1500
Min. 1000
from BOK
FL
Kerb - refer to Engineer's
100
drawings Topsoil laid to minimum 100mm depth . Refer to
Road specification. Fertiliser to be applied to
Manufacturer's recommendations to top layer of
150
topsoil prior to turf being laid.
NOTE: ENSURE TREES ARE LOCATED CENTRALLY IN
PLANTING AREAS WHERE STREET TREES ARE TO BE
PLANTED BETWEEN FOOTPATH AND KERB.
Relieve sub-soil compaction to 100mm & ensure
soil is free draining
2 TYPICAL STREET TREE SETOUT PLAN
L500 Scale 1:50
7 TYPICAL TURF PROFILE
L500 Scale 1:10
Approved by: James Oliver (AILA)
Checked - JO F 03.07.2025 MCU RFI AMENDMENTS JO
Drawing title - Project - Site - Project No. 233467 Sheet No. L600
Design - JO Drawn - JO
E 17.04.2025 SPECIES CHANGE JO
LANDSCAPE DETAILS Proposed 1 into 3 Development 62 Lake MacDonald Drive, Cooroy
D 24/03/2025 UPDATED PROJECT NAME AR Digital Ref : Issue : F
C 12.03.2025 FOR APPROVAL JO
Scales - AS SHOWN B 24.09.2024 FOR APPROVAL IL 124 DUPORTH AVENUE Ph (07) 5443 7777 Client - This Document is copyright and shall not be copied
PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - FOR APPROVAL
A 31.05.2024 PRELIMINARY - FOR COORDINATION ONLY JO
MAROOCHYDORE QLD 4558 Noosa Council for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]
Document Set ID: 23931061
Version: 1, Version Date: 15/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.