Performance Outcomes Acceptable Outcomes Response
PO8 AO8.1
Water quality treatment infrastructure to be dedicated as Detailed life cycle costing is provided for the entire treatment train Not applicable as no water quality treatment infrastructure is
public assets are proven to be suitable for its use and of a system including replacement costs of asset parts. proposed.
cost effective and efficient standard.
AO8.2 Treatment systems dedicated as public assets are
designed to minimise maintenance, renewal and adaption costs
and the requirement for specialised equipment, material or
maintenance techniques.
AO8.3
Vegetated stormwater management systems to be dedicated as
public assets are established and maintained during the
maintenance period to ensure optimal vegetated growth and that the
functional elements of the system achieve the design function at the
end of the maintenance period.
PO9 AO9.1
Treatment systems are designed to eliminate or minimise health, Free draining inlets and outlets are provided to ensure that waters Not applicable as no water quality treatment infrastructure is
safety and aesthetic hazards, including risks associated with insect do not pond for more than 24 hours. proposed.
breeding, odour and public safety.
AO9.2
Developments are designed to eliminate retaining walls in excess of
0.8m for any water quality treatment device.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.