Original source · versioned page text
OPW052025 Report - Part 2
Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.
Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Sunshine Coast Laboratory
11/1 Metier Linkway
Birtinya QLD 4575
Report No: MDD:S25SC-00167
Maximum Dry Density Report
Issue No: 1
Accredited for compliance with ISO/IEC 17025
Client: Tectonic Geotechnical Pty Ltd – Testing
Address: 924 David Low Way
Marcoola QLD 4564
Project: Middle Creek Rd, Federal
Project No.: 1098406
Accreditation Number: Approved Signatory: A. Collier
Order No.: CG Request No.: 12719 (Discipline Manager QLD)
TRN: 25050 Lot No.: Site Number: 25425 Date of Issue: 3/04/2025
THIS DOCUMENT SHALL NOT BE REPRODUCED EXCEPT IN FULL
Sample Details
Location: Middle Creek Rd, Federal
Sample ID: S25SC-00167 Date Sampled: 13/03/2025
Sampling Method: As Received
Source: In-Situ Material: CLAY trace sand and gravel, brown, high
plasticity
Specification:
Location: TP3, 0.30 - 0.80m
Date Tested: 25/03/2025
Dry Density - Moisture Content Relationship Test Results
AS 1289.5.1.1
Standard MDD (t/m³): 1.50
Standard OMC (%): 28.0
Retained Sieve (mm): 19.0
Oversize Material (%): 0
Curing Time (h): 168
LL Method: Visual / Tactile
Comments
These results apply to the sample as received.
Form No: 18995, Report No: MDD:S25SC-00167 © 2000-2025 QESTLab by SpectraQEST.com Page 1 of 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.