AO1.4
Clearing of vegetation for a boundary fence does not extend
beyond 5 metres either side of the fence.
Reconfiguring a lot Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Response
Reconfiguring a lot
PO2 AO2 Not applicable as no new allotments form part of this
New lots are only created if they maintain ecological linkages and Where clearing vegetation for the purpose of Reconfiguring a Lot: application noting minimal clearing works are required.
minimise the clearing of vegetation. (a) new boundaries to lots do not transect and fragment
existing native vegetation;
(b) new lots are created to allow for suitable building
envelopes for future buildings and works to be located
within existing cleared areas or areas of low ecological
value;
(c) building envelopes are designated for each lot; and
(d) ecological linkages and ecologically important areas are
secured by environmental covenant or transferred to public
ownership or through gazettal of a nature reserve.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.