Original source · versioned page text
OPW052025 Report - Part 2
Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.
Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance Outcomes Acceptable Outcomes Response
AO24.5
Where multiple intensive horticulture structures are proposed
they are grouped to minimise the footprint and allow separation
distance around the periphery of the site.
AO24.6
Heavy vehicles, plant equipment, machinery or other
associated tools are stored in an area that is screened from the
road or adjoining properties.
AO24.7
Where visible from the road or adjoining properties, plastic
cladding of the horticultural structures on the site are
maintained in good condition.
AO24.8
Any external lighting is designed and operated in accordance with
the Australian Standard AS4282: The control of obtrusive effects of
outdoor lighting.
Roadside Stall Table 9.3.13.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Response
Roadside Stall
PO25 AO25.1 Not applicable as no roadside stalls are proposed.
A roadside stall is limited in scale, appropriate to a rural setting The roadside stall is ancillary to a rural use conducted on the
and provides only for the sale of locally grown and manufactured same site.
goods.
AO25.2
Produce sold at the roadside stall is limited to fresh or processed
produce which is grown or produced on the site or in the
surrounding area.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.