Original source · versioned page text
OPW052025 Report - Part 2
Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.
Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes Acceptable Outcomes Response
AO3.2
Driveways are located so they abut existing driveways of adjoining
development where practicable and reciprocal easements are
created to reduce the sealed driveway width.
PO4 AO4
Vehicular access does not adversely impact on the capacity, Footpath and kerb crossings are located clear of existing The proposed driveway is to be placed at the location of the
operations and maintenance of the existing infrastructure. stormwater inlet structures, water and sewerage infrastructure existing driveway for the allotment which is clear of existing
fittings, any other exiting utility infrastructure, existing landscaping utility infrastructure and existing landscape/vegetation. PO4
and vegetation. and acceptable outcome AO4 will be met.
PO5 AO5
Vehicular access does not adversely impact on the health and Vehicular access avoids disturbance to the tree protection zone of The proposed driveway is to be placed at the location of the
integrity of existing landscaping or native vegetation, where trees on public land. existing driveway for the allotment. PO5 and acceptable
possible. outcome AO5 will be met.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.