RFI - Engineering Plans · MCU26/0001

of 20

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

DATE PLOTTED: Wednesday, 20 May 2026 3:10:50 PM BY : CHANELLE STRYDOM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       PHASING OF WORKS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       1. ESTABLISH CONSTRUCTION SITE;
                                                                                                                                                                                                                                                                                                   DISTURBED AREA                                                                                                                                                                      2. SET UP PHASE 1 ESC MEASURES;
                                                                                                                                                                                              SAG KERB INLET SEDIMENT TRAP                                                                                                                                                                                                                                                             3. EARTHWORKS AND BASEMENT EARLY WORKS;
                                                                                                                                                                                              IN ACCORDANCE WITH IECA STD                                                                                                 DIRECTION OF                                                                                                                                                 4. SET UP PHASE 2 ESC MEASURES;
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       5. INITIAL BUILDING WORKS & RECONNECT SITE DRAINAGE;
                                                                                                                                                                                              SA-01                                                                                                                           FLOW     1.5 M STAR PICKETS AT                                                                                                                           6. DEMOLISH & RECONSTRUCT DRIVEWAY & VERGE. CONNECT ALL SERVICES TO SITE, REMOVE GRID &

                                                                                                                  FILTER SOCKS MAY NEED TO FULLY SURROUND                                                                                                                                                                              MAX. 2.0 m CENTRES                                                                                                                              FILL IN SUMP;
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       7. COVER ALL REMAINDER EARTH AREAS WITH TURF OR CONCRETE BLINDING LAYER IF TURF WILL
                                                                                                                  THE INLET TO INTERCEPT SEDIMENT RUNOFF                                                                                                                                                                                                                                                                                                                               DAMAGE;
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       8. SET UP PHASE 3 ESC MEASURES;
                                                                                                                  FROM THE ROAD AND VERGE                                                                                                                                                                                                               *       IF FENCE LOCATED ALONG                                                                                                 9. CONTINUE & COMPLETE BUILDING WORKS. ESTABLISH PERMANENT, NON-ERODIBLE GROUND COVER;
                                                                                                                                                                                                                                                                                  UNDISTURBED AREA                                                              THE CONTOUR, OTHERWISE                                                                                                 10. REMOVE KERB INLET PROTECTION & SEDIMENT FENCE WHEN SITE EROSION IS NO LONGER AN
                                                                                                                                                                                                                                                                                                                                                                5-10m DEPENDS ON SLOPE                                                                                                 ISSUE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ESC MEASURES:
                                                                                                 TYPICAL LIP-IN-LINE SAG INLET                                                                                                                                                                                                          20 M MAX.*                                                                                                                                     ACCESS: CATTLE GRID INSTALLED IN EXISTING DRIVEWAY SLIGHTLY RAISED. CUT IN 300MM DEEP SUMP
                                                                                                                                                                                                                                                                                                                                                     MP/ESCP)
                                                                                                                                                                                                                                                                                                                             ST A TED OTHERWISE ON SW                                                                                                                                  UNDER FOR COLLECTION OF SEDIMENT.
                                                                                                                                                    EK
                                                                                                                                                                                                                                                                                                                     (UNLESS                                                                                                                                                           FENCE: INSTALL GEOFABRIC SEDIMENT FENCE TO DOWNSTREAM (FRONT BOUNDARY). ANCHOR BOTTOM
                                                                                                                                             T O CRE                                                                                                                                                                                        FLOW                                                                                                                                       OF FENCE MESH AGAINST LIFTING.
                                                                                                                                           S
                                                                                                                                       FLOW                                                                                                                                                                                                                                                                                                                                            DRAINAGE: INSTALL FILTER SOCKS AND GEOFABRIC MESH AROUND KERB INLETS. TEMPORARILY CAP OR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SEAL ANY DRAINAGE PIPES AND FIELD INLETS ON SITE.
                                                                                                                               E-                                              SIDE INLET REMAINS OPEN                                                                                                                                                                                                                                                                                 STREET: CARRY OUT REGULAR STREET SWEEPING DURING EARTHWORKS AND INITIAL BUILDING WORKS
                                                                                                                           WAST                                                                                                                                                                                                                                                                                                                                                        PHASES, WHEN THERE IS HIGHER RISK OF SEDIMENT BEING TRACKED ONTO STREET/ROAD.
                                                                                                                      P NO                                                                                                                                                                               MIN. 1.5 M                  STAR PICKETS AT
                                                                                                                DUM                                                                                                                                                                                                                                                                                                                                                                    CONTRACTOR TO ARRANGE STREET SWEEPING WHEN NECESSARY
                                                                                                                                                                                                                                                                                                                                     MAXIMUM 2.0 m SPACINGS                                                                                                                            ESC MAINTENANCE
                                                                                                                                                                               GULLY GRATE WRAPPED IN
                                                                                                                                                                               NON-WOVEN FILTER FABRIC                                                                                                                                                                                                                                                                                 ACCESS: CHECK GRID SUMP EVERY SECOND DAY & AFTER RAIN EVENTS FOR SEDIMENT BUILD-UP.
                                                                                                                                                                               (MINIMUM, BIDIM A34 OR                                                                                                                                                                                                                                                                                  VACUUM EXCAVATE IF FULL.

                                                                                                                                                                               EQUIVALENT)
                                                                                                                                                                                                                                                                       SEDIMENT FENCE                                                                                                                                                                                                  FENCE: CHECK INSTALLATION OF FENCE DAILY & BEFORE ALL RAINFALL EVENTS. PARTICULARLY AROUND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       THE BASE AND FOR ADEQUATE EMBEDMENT OF POSTS.
                                                                                                                                                                                                                                                                        N.T.S.                                                                                                                                                                                                         DRAINAGE: CHECK FILTER MEASURES AROUND KERB INLET DAILY & BEFORE RAINFALL EVENTS, AS WITH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FENCE.

                                                                                                                                    PROVIDE SAND FILLED 100Ø SLOTTED AG DRAIN, WRAPPED IN
                                                                                                                                                                                                                                                                                                                                                                                                                   1000 mm                                                             WATER QUALITY
                                                                                                                                    GEOFABRIC, or APPROVED EQUIVALENT,                                                                                                                                                                                                                                                                                TYPICAL 50 X 100 mm
                                                                                                                                    TO FRONT OF CHAMBER                                                                                                                                                                          1000 mm                                                                           (max)                              TIMBER CROSS MEMBERS             CONSTRUCTION PHASE RUNOFF SHALL EITHER BE:
                                                                                                                                                                                                                                                                                                                                                                TYPICAL 50 X 100 MM TIMBER                                                                                              1.      COLLECTED IN THE BASEMENT EXCAVATION AND REMOVED FROM SITE VIA PUMP SYSTEM TO
                                                                                                                                                                                                                                                                                                                                 (max)                          CROSS MEMBERS.                                                                                                                  THE ESC BASIN FOR TREATMENT, OR VACUUM TRUCK AND DISPOSED OF IN ACCORDANCE WITH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                THE TRUCK OPERATORS ENVIRONMENTAL POLICY, SCC REQUIREMENTS AND EPA GUIDELINES.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        2. DISCHARGED TO THE STORMWATER SYSTEM PROVIDED THAT THE WATER IS TREATED TO THE
                                                                                                              SAG KERB INLET SEDIMENT TRAP                                                                                                                                                                                                                                     STAKES                                                                                                           BELOW REQUIREMETNS (IN ACCORDANCE WITH THE EPA) AND TESTED TO CONFIRM PRIOR TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                DISCHARGE:
                                                                                                                                                              NTS                                                                                                                                                                                                                               SEDIMENT                                                                                   2.1.      <50mg/L TSS
                                                                                                                                                                                                                                                                                                                                                                                                FENCE                                                                                      2.2.     pH BETWEEN 6.5 AND 8.5
                                                                                                                                                                                                                                                                                                                                                                                                FABRIC                                                                                     2.3.     NTU LESS <10% ABOVE BACKGROUND

                                                                                                                                                                                                                                                                                                                                                                                                                                                                       300 mm
                                                                                                   SANDBAGS OVERLAP                                                                                                                                                                                                                                                             300 mm                                                                                 (min)
                                                                                                                                                                                                                                                                                                                    DROP INLET                                                  (min)                                                                                                 SEDIMENT & EROSION CONTROL PROGRAM
                                                                                                   ONTO KERB
                                                                                                                                                              4.0 m (min)
                                                                                                                                                                                                                                                                                                                    COVER                                                                                                                                                              OBJECTIVE/TARGET           THE CONTRACTOR MUST COMPLY WITH ALL STATUTORY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FABRIC
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  REGULATIONS AND MAINTAIN THEM DURING EARTHWORKS/
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       BURIED 200mm                               CONSTRUCTION. ALL PROVISIONS AND SPECIFICATIONS
                                                                                               Sediment                                                                                                                                                                                                                                                                                                                                                                                                           OUTLINED WITH THE APPROVED ENVIRONMENTAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  MANAGEMENT PLAN MUST BE ADHERED TO, ALONG WITH
                                                                                               pond                                                                                                                                                                                                                                                                                                                                                                                                               ALL EROSION AND SEDIMENT CONTROL MEASURES
                                                                                                                                                                                                                                                                                                                                                                        SPILL-THROUGH WEIR                                                                                                                        PRESCRIBED WITHIN THESE DRAWINGS BY THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SITE ENGINEER
                                                                                                                                                                         1M




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       MANAGEMENT                 THE SITE FOREMAN IS TO IDENTIFY AND CHECK THE
                                                                                                                                                                          (M




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       STRATEGY                   DIRECTION OF STORMWATER FLOWS AS SHOWN ON PLAN.
                                                                                                                                                                              AX




                                                                                         Run-off                                                SPILLWAY                                                                                                                                                             SUPPORT FRAME WITH SPILL                                                     FABRIC DROP INLET PROTECTION                                                                                    PROVIDE BARRIERS AND OTHER MEASURES SHOWN ON
                                                                                                                                                                               )O




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  PLAN TO PREVENT STORMWATER FLOWS OVER
                                                                                                                                                                                   N




                                                                                                                                                                                                                                                                                                                     - THROUGH WIER                                                               WITH SPILL - THROUGH WEIR                                                                                       EMBANKMENTS, AND SEDIMENT INTO GULLY PITS
                                                                                                                                                                                     PU
                                                                                                                                                                                        B
                                                                                                                                                                                       LIC




                                                                                                                                                                                                                                                                                                                      NOT TO SCALE                                                                NOT TO SCALE                                                                         TASKS / ACTIONS            ERECT SEDIMENTATION BARRIERS AS DETAILED.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  STRATEGICALLY PLACE CHECK DAMS
                                                                                                                                                                                            RD




                                                                                                                                                                                                                   ON GRADE KERB INLET SEDIMENT TRAP                                                                                                                                                                                                                                                              AROUND GULLY PITS
                                                                                                                                                     BYPASS FLOW                                                   IN ACCORDANCE WITH IECA STD OG-01
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       PERFORMANCE                THE SITE FOREMAN IS TO CHECK FOR EROSION AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       INDICATORS                 SEDIMENT FLOWS AT THE BASE OF EMBANKMENTS AFTER
                                                                                                                                           THREE LAYERS OF SANDBAGS                                                                                                                                                                                                                                                                                                                                               SIGNIFICANT RAINFALL AND SHOULD ASCERTAIN THE
                                                                                                                                           WITH ENDS OVERLAPPED.                                                                                                                                                                                                                                                                                                                                                  WORKING EFFECTIVENESS OF CHECK DAMS DURING
                                                                                                                                                                                                                                                                                                                                                                                                                                             FLOW CONTROL BERM INCORPORATED INTO                                  THIS WET WEATHER
                                                                                                                                                                                                                                                                                                                                                                                                                                             THE ROCK PAD IF THE PAD RECEIVES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FREQUENCY /                SITE FOREMAN TO MONITOR PERFORMANCE AFTER
                                                                                                                                                                                                                                                                                                                                                                                MINIMU                                                       RUNOFF FROM THE BUILDING SITE             DEADLINE                   EVERY HEAVY DOWNFALL
                                                                                                                                                                                                                                                                                                         40 − 75 mm                                                                      M LENG                                              (LOCATION MAY VARY)
                                                                                                                                                                                                                                                                                                                                                                                               TH 10 m
                                                                                                              ON GRADE KERB INLET SEDIMENT TRAP                                                                                                                                                          CRUSHED ROCK                                                                                    (MIN)                                                                         RESPONSIBILITY             THE SITE FOREMAN IS RESPONSIBLE FOR ALL INSPECTIONS
                                                                                                                                                                                                                                                                                                                                                                      300 mm (min)                                                                                                     REPORTING REVIEW           SITE WORKMEN ARE TO ADVISE THE FOREMAN IF ANY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SEDIMENT & EROSION CONTROL DEVICES ARE FAILING

                                                                                                                                                                                                                                                                                                                                           150 − 200 mm                                                                                                                                CORRECTIVE ACTIONS         THE SITE FOREMAN IS TO REPORT AND ORDER THROUGH
                                                                                                                          SPACING VARIES WITH SLOPE                                              4 m (min)                                                                                                                                                                                                                                                                                                        SUPERVISOR, EXTRA BARRIER OR CHECK DAMS AS
                                                                                                                                                                                                                                           SIDE-ENTRY                                                                                                                                                                                                                                                             REQUIRED
                                                                                                                                                                                            WHEREVER PRACTICAL                             INLET                                                                                                                                                                                 ry                                        KERB
                                                                                                                                                                                                                                                                                                                                                                                        Width 2.0 m (min)                   n da
                                                                                                                                                                                                                                                                                                                                                                                                                          u
                                                                                                VERGE                                       SEDIMENT                                                                                                            GRATE                                                                                                                                               y   bo
                                                                                                                                                                                                                                                                                                                                                                                                                ert                                                                    NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                              op                  Footpath
                                                                                                                                                                                                                                                                                                   UP-SLOPE RUNOFF                                                                                       Pr                                                                            EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN
                                                                                                                                    OVERFLOW                                                                                                                                                       DIRECTED TO AN                                                                                                                                                                      DESIGNED AND PROVIDED IN ACCORDANCE WITH:
                                                                                                                                                                                                                   ON-GRADE KERB INLET                                                             APPROPRIATE                                                                                                                                               Roadway                    -    THE INTERNATIONAL EROSION CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             ASSOCIATION (AUSTRALASIA) 2025'S "BEST
                                                                                                                                                                                                                                                                                                   SEDIMENT TRAP                                                                                                                                                                            PRACTICE EROSION AND SEDIMENT CONTROL FOR
                                                                                                                                                                                                 ROADWAY                                                                                                                                                                                                                                                                                    BUILDING AND CONSTRUCTION SITE.
                                                                                                                                                                                                                                                                                                                                                                                          MAKE SAFE FOR
                                                                                                                                                                                                                                                                                                                                     GEOTEXTILE FILTER CLOTH                              PEDESTRIAN TRAFFIC                                                                            -   SEDIMENT MANAGEMENT ON CONSTRUCTION SITES
                                                                                                                                                                                                                                                                                                                                     (MANDATORY WHEN WORKING                                                                                                                                - COMPLYING WITH THE SPP (2017) BY HEALTHY
                                                                                                               SANDBAG SEDIMENT TRAP                                                                                                                                                                                                                                                                                                                                                        LAND AND WATER
                                                                                                                                                                                                                                                                                                                                     ON CLAYEY SOILS)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        -   STATE PLANNING POLICY (2017) - APPENDIX 2
 p:\2613-17 bottlebrush ave, noosa heads\02 design\acad\c510 esc details.dwg




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            (STORMWATER MANAGEMENT DESIGN OBJECTIVES)
                                                                                               TYPICAL LAYOUT OF ON - GRADE KERB INLET SEDIMENT TRAP                                                                                                                                                                                         TEMPORARY CONSTRUCTION ENTRY / EXIT
                                                                                                                                                                                                                                                                                                                                             NOT TO SCALE
                                                                                                                                                                                                                                                                                                                                             ROCK PAD FOR BUILDING SITES REFER TO IECA STD Exit -03                                                                                    CAUTION - EXISTING SERVICES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       THE CONTRACTOR IS TO DETERMINE THE EXACT LOCATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       OF ALL EXISTING SERVICES IN THE VICINITY OF THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       PROPOSED WORKS PRIOR TO THE START OF ANY

                                                                                    CONCEPT ONLY                                                                                                                                                                                                                                                                                                                                                                                       CONSTRUCTION. THE COST OF ANY RECTIFICATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       WORKS DUE TO DAMAGE OF EXISTING SERVICES SHALL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       BE BORNE BY THE CONTRACTOR.


                                                                                                                                                                                                                                                                                                                                                                                                                                                      PROJECT:                                                                                                JOB NUMBER
                                                                               REV DATE DESCRIPTION                                                      BY      CHKD                  DETAILS                                                       SCALE                                                                    APPROVED                                                                                                                PROPOSED MULTIPLE DWELLING DEVELOPMENT
                                                                                A   15.05.26   FOR APPROVAL                                              GS         CS
                                                                                                                                                                                                                                                                                                                                                                                                                        Barlow Shelley Pty Ltd
                                                                                                                                                                                                                                                                                                                                                                                                                        ABN 29 679 702 599
                                                                                                                                                                                                                                                                                                                                                                                                                                                      AT 17 BOTTLEBRUSH AVE, NOOSA HEADS                                                                        2613
                                                                                                                                                                              DATUM                   AHD

                                                                                                                                                                              DESIGN                   CS
                                                                                                                                                                                                                                                                                                                           .................                                                                            07 5443 8285                  FOR MADE ONE PTY LTD
                                                                                                                                                                                                                                                                                                                                                                                                                        PO Box 899
                                                                                                                                                                              DRAWN                    GS
                                                                                                                                                                                                                                            NOT TO SCALE                                                                    Director: TIM BURKE                                                                         Maroochydore 4558             DRAWING TITLE:                                                                                   DRAWING NUMBER               REV
                                                                                                                                                                                                                                                                                                                               (RPEQ 25245)                                                                             [email protected]   EROSION & SEDIMENT DETAILS
                                                                                                                                                                              DESIGN CHECK             TB
                                                                                                                                                                                                                                                                                                                       DRAWING STATUS
                                                                                                                                                                                                                                                                                                                                                                                                                        barlowshelley.com.au                                                                                                                C510                    A
                                                                                                                                                                              DATE                  MAY 2026   This drawing is not to be copied or amended without written permission from Barlow Shelley Pty Ltd
                                                                                                                                                                                                                                                                                                                             FOR APPROVAL

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Engineering Plans.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.