Original source · versioned page text
Information response - GEOTECH REPORT
LANDSLIDE RISK MANAGEMENT ADVICE. GEOTECHNICAL ASSESSMENT PLANNING SITE PLANNING [ APPENDIX J AGS SUB-COMMITTEE SOME GUIDELINES FOR HILLSIDE CONSTRUCTION GOOD ENGINEERING PRACTICE Obtain advice from a qualified, experienced geotechnical consultant at early stage of planning and before site works. Having obtained geotechnical advice, plan the development with the risk arising from the identified hazards and consequences in mind. DESIGN AND CONSTRUCTION POOR ENGINEERING PRACTICE Prepare detailed plan and start site works before geotechnical advice. Plan development without regard for the Risk] HOUSE DESIGN Use flexible structures which incorporate properly designed brickwork, timber or stecl frames, timber or patel cladding. Consider use of split levels, Use decks for recreational areas where appropriate, Floor plans which require extensive cutting and filling, Movement intolerant structures, SITE CLEARING Retain natural vegetation wherever practicable, Indiscriminately clear the site. ACCESS & DRIVEWAYS Satisfy requirements below for cuts, fills, retaining walls and drainage. Council specifications for grades may need to be modified. Driveways and parking areas may need to be fully supported on piers, Excavate and fill for site access before geotechnical advice, EARTHWORKS Retain natural contours wherever possible. Indiscriminant bulk earthworks. curs Minimise depth. Support with engincered retaining walls or batter to appropriate slope, Provide drainage measures and erosion control. Large scale euts and benching, Unsupported cuts, Ignore drainage requirements Fis Minimiss height, Strip vegetation and topsoil and key into natural slopes prior to Alling. Use clean £1] materials and compuct to engineering standards. Batter to appropriate slope or support with engineered retaining wall, Provide sucface drainage aud appropriate subsurface drainage. Loose or poorly compacted fill, which if it fails, may flow a considerable distance including onto property below, Block natural drainage lines, Fill over existing vegetation and topsoil, Include stumps, trees, vegetation, topsoil, boulders, building rubble etc in fill. ROCK OUTCROPS & BOULDERS RETAINING WALLS Remove or stabilise boulders which may have unacceptable risk. Support rock faces where necessary. Disturb or undercut detached blocks or boulders, Engineer design to resist applicd soil and water forces. Tound on rock where practicable, Provide subsurface drainage within wall backfill and surface drainage on slope above. Construct wall as soon as possible after cut/fill operation. FOOTINGS Construct @ structurally inadequate wall such as sandstone flagging, brick or unreinforced blockwork, Lack of subsurface drains and weepholes. Found within rock where practicable, Use rows of piers or strip footings oriented up and down slope. Design for lateral creep pressures ifnecessary, Backfill footing excavations to oxclude ingress of surface water. SWIMMING POOLS Found on topsoil, loose fill, detached boulders. or undercut cliffs. Engineer designed. Support on piers ta rock where practicable, Provide with under-drainage and gravity drain outlet where practicable, Design for high soil pressures which may develop on uphill side whilst there DRAINAGE. SURFACE may be little or no lateral support on downhill side. Provide at tops of cut and fill slopes. Discharge to street drainage or natural water courses, Provide general falls to prevent blockage by siltation and incorporate silt traps. Line to minimise infiltration and make flexible where possible. Special structurcs to dissipate cnerpy at changes of slope and/or direction. Discharge at top of fills and cuts. Allow water to pond on bench areas, SUBSURFACE Provide filter around subsurface drain. Provide drain behind retaining walls. Use flexible pipelines with access for maintenance, Prevent inflow of suzface water. Discharge roof runoff into absorption trenches, Seetic & SULLAGE Usvaily requires pump-out or mains sewer systems, absorption trenches may be possible in some areas if risk is acceptable. Storage tanks should be water-tight and adequately founded. Discharge suillage directly ovto and into slopes. Use absorption trenches without consideration of landslide risk, EROSION CONTROL & LANDSCAPING Control erosion as this may lead to instability. Revegetate cleared area. Failure to observe earthworks and dramage recommendations when fandscaping. DRAWINGS AND SITE VISITS DURING CONSTRUCTION DRAWINGS Building Application: drawings should be -yiewed by geotechnical consultant _| SITE VISITS. INSPECTION AND MAINTENANCE BY:OWNER Site Visits by consultant may be appropriate during construction/ OWNER'S RESPONSIBILITY Clean drainage systems; repair broken joints in drains and leaks in supply pipes. Where structural distress is evident see advice, [f seopage observed. determine causcs ar seck advice on consequences, Australian Geomechanics — March 2900 91
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.