Council archive · source document
RFI - Attachment B - Stormwater management Report · MCU20/0026
Original PDF page 47, section 1. The text section number identifies this passage in the reader.
4 3 2 1
5440 1980 2660
2500 2500
site boundary
site boundary
setback setback
e
ground lin
e natural
12m abov
existing ridge
RL33.460
Ens Robe
Level 03
RL29.500
height above build stair at high point
2700
neighbouring
3330
building
11105
garage Garage
RL26.800 Lobby
630
RL26.170
Level 02
neighbouring
building
3330
Guest Bed Family e
nd lin
natural grou
Level 01
RL22.840
3330
basement
4070
Level 1 Gym
RL19.510
740
RL18.770
ground
red hatch area complies with
"basement" definition according
to the code therefore does not
constitute as a level
1 Proposed building section 06
050.02 1 : 100
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV
PROJECT NO 0309
DL
DL
A
B
13.05.20
08.06.20
Council RFI
Revised Council Submission
40 Park Crescent, Asha & Sandeep Building Section SD 400.05 B SCALE 1 : 100
Sunshine Beach Biswas
A3
Proposed building section 06
schematic design
1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.