Skip to the record
Search everything, all in one place.

Original source · versioned page text

RFI - Attachment 7 - Updated SWMP

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Commercial in Confidence
This document is commercial-in-confidence. The recipient of this document agrees to hold all information
presented within as confidential and agree not to use or disclose or allow to use or disclosure of the said
information to unauthorized parties, directly or indirectly, irrespective of the acceptance or rejection of the
presentation or at any time before, during or after an agreement has been reached, without prior written
consent.

This report is prepared by Colliers | Engineering & Design for exclusive use by its client only. No
responsibility is accepted for the use of or reliance upon this report in whole or in part by any third party.




Limitations
The sole purpose of this report and the associated services performed by Colliers | Engineering & Design is
to display information in accordance with the scope of services set out in the contract/quotation between
Colliers | Engineering & Design and its client. The scope of works and services were defined by the
requests of the client, by the time and budgetary constraints imposed by the client, and by the availability
of access to site/s and information.

This report is prepared with information supplied by the client and possibly others which is presumed to be
accurate and complete. No responsibility is accepted for information that is withheld, incorrect or that is
inaccurate, nor for changes to the conditions over the passage of time or from latent circumstance or
conditions. No warranty or guarantee is made in relation to the data, findings and conclusions expressed in
this report.

This report has been compiled at the level of detail specified in the report and no responsibility is accepted
for interpretations made at more detailed levels than so indicated.


Report Contact:

Name:             Kelly McKendry
Position          Technical Director - Water & Environment
Phone:            (07) 3532 1300




Document Control
21-0211SMP01V1

 Version       Date          Details       Prepared          Checked   Approved       Signed         RPEQ

     1       27/02/24        For Issue         IM              KM        KM                          09298




21-0211SMP01V1 | Stormwater Management Plan | Good Shepherd Lutheran College Arts Centre
Log in to download the original file

RFI - Attachment 7 - Updated SWMP.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.