Original source · versioned page text
RFI - Attachment 7 - Updated SWMP
List of Tables
Table 1-1: Catchment Split .............................................................................. 6
Table 2-1: Catchment %Impervious fractions .............................................. 7
Table 3-1: Site Stormwater Quality and protection of receiving waters
(Operational Phase) ......................................................................................... 8
Table 3-2: Industrial (Split Source Nodes) - Pollutant Export Parameters10
Table 3-3: MUSIC Runoff Generation Parameters ..................................... 10
Table 3-4: Catchment Areas and corresponding Impervious values ....... 11
Table 3-5: Rainwater Tank Parameters used for MUSIC Modelling ......... 12
Table 3-6: Bioretention and Raingarden Design Parameters ................... 14
Table 3-7: MUSIC Results – Load Based Pollutant Outputs ...................... 14
List of Figures
Figure 1-1: Site Location .................................................................................... 5
Figure 1-2: Proposed Development Architectural Masterplan (left)
Nearmap representation (right) ..................................................................... 6
Figure 3-1: Strategy .......................................................................................... 9
Figure 3-2: MUSIC Model Layout .................................................................. 11
Figure 3-3: A raingarden (City of Sydney, 2019) ......................................... 13
Appendices
Appendix A Architectural Masterplan
21-0211SMP01V1 | Stormwater Management Plan | Good Shepherd Lutheran College Arts Centre
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.