Original source · versioned page text
RFI - Attachment 7 - Updated SWMP
2. Hydrologic Analysis
In accordance with the Queensland Urban Drainage Manual 2017, peak stormwater flows are calculated
based on impervious fractions. As shown in Table 2-1 the impervious fraction between the existing and
proposed (renovated) areas does not significantly change. This indicates that there will not be any
significant changes to peak flows, and as such, detention is not required.
Table 2-1: Catchment %Impervious fractions
Existing Surface- Existing (m2) %Impervious Proposed (Split) %Impervious Proposed (m2)
Split
Arts Centre 100 1,219
A 2591.336 90
Ground 90 1,372
B 944.35 60 Ground 60 944.35
C 3524.78 90 Ground 90 3524.78
Total (m2) 7060.466 7060.466
21-0211SMP01V1 | Stormwater Management Plan | Good Shepherd Lutheran College Arts Centre Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.