Original source · versioned page text
Appendix F - Ecological Assessment Report
Very large file: it may take a few minutes
The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Ecological Assessment Report v1 NCES REF: J001050 Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain way that results in a net gain and enhancement of the overall habitat AO3.2 – No significant habitat trees for native fauna were identified within the values of Noosa Shire. AO3.2 development footprint. Habitat trees, recruitment habitat trees, and roosting, breeding and feeding areas are protected for native fauna habitat. PO4 AO4.1 AO4.1 – Due to the limited amount of vegetation clearing required minimal Development provides for effective measures during construction Vegetation is protected from disturbance or damage from construction and operation disturbance and/or damage is expected as a result of the proposed and operation to protect ecological values including: activities by: development. However, if required, a Vegetation Management Plan that details, a) avoiding disturbance to or clearing of vegetation in and within the a) clearly marking trees to be retained with flagging tape; as a minimum, the protection measures listed in AO4.1 can be produced by the vicinity of the site; b) installing protective fencing around the dripline of the vegetation and avoid filling applicant for the future Operational Works application and can be conditioned b) managing habitat disturbance and physical harm to fauna from and excavating in these fenced areas; by Council with an RoL approval. noise, vibration, dust, light, dewatering or excavating; and c) ensuring stockpiling, storage and vehicle parking occurs outside the identified c) avoiding clearing in areas where erosion or slippage could occur. vegetation areas; and d) using low impact construction techniques around vegetation. AO4.2 AO4.2 – All existing vegetation outside of the proposed development footprint Vegetation which is capable of forming or contributing to a buffer between different land will continue to form a buffer between the site and adjacent land uses. uses or a buffer against pollution, light spillage or noise is retained. AO4.3 Lighting associated with development: AO4.3 - Lighting associated with development shall comply with AO4.3 and can a) does not contribute an unacceptable level of illuminance (greater than 1 lux) for light be conditioned with an approval. sensitive species within or at the boundary of an ecologically important area; and b) does not contribute to an unacceptable level of illuminance on landward horizons b) N/A along coastal areas and known marine turtle nesting beaches. AO4.4 AO4.4 – The proposed development areas are located upslope of the identified Clearing of vegetation does not involve clearing that may cause or contribute to hillslope Ecologically Important Areas onsite. Appropriate erosion and sediment controls erosion, bank erosion, or slippage. works are expected to control the potential adverse impacts of hillslope erosion, bank erosion, or slippage on the identified Ecologically Important Areas. Civil engineering works will be designed to prevent erosion without the reliance on vegetation. Connectivity PO5 AO5 The development does not propose a significant volume of vegetation clearing. Development is designed and operated to maintain and enhance Development is designed and operated to maintain ecological linkages and maximise The vegetation impacted as a result of the development is considered low connectivity between and across ecologically important areas and opportunity for connectivity and the movement of fauna by: ecological value and does not form part of a significant ecological linkage. connecting habitat and support unimpeded and safe movement of a) ensuring protection of wildlife refuges; terrestrial and aquatic fauna. b) maintaining vegetation in patches of the greatest possible size and within the The proposed development will introduce a potential future exempt clearing smallest possible edge-to-area ratio; opportunity impacting a small protruding unit (approx. 135m2) of VC1 located c) enhancing connectivity through planting and rehabilitation works, including across external of the Vegetation Protection Covenant Area within Lot 1. Given the property boundaries, to areas of national park, state forest or reserve; protruding nature and small area of this unit it is not expected to significantly d) avoiding the creation of physical barriers and safety hazards (such as roads, impact connectivity between and across ecologically important areas and pedestrian access and instream structures) along and within the ecological linkage; connecting habitat and support unimpeded and safe movement of terrestrial e) providing mitigation measures such as wildlife movement infrastructure, fauna and aquatic fauna. exclusion and directional fencing, underpasses/overpasses and traffic calming devices, signage and lighting; and Furthermore, the existing ecological linkage (i.e. VC1) will be secured within a f) where offsets are necessary, delivering offsets that support and enhance ecological Vegetation Protection Covenant Area and rehabilitated through a Covenant linkages. Area Management Plan. Waterways and Wetlands PO6 AO6.1 AO6.1 The development does not represent potential to clear vegetation within The biodiversity and ecosystem values of waterways, drainage lines, Development and clearing of vegetation does not occur within: the following: wetlands and adjacent riparian zones are protected by: a) a riparian buffer area; a) a riparian buffer area; a) avoiding any new development in a riparian buffer area and b) a wetland area; or b) a wetland area; or wetland area; c) 10 metres either side of the centre line of other waterways identified on a c) 10 metres either side of the centre line of other waterways identified b) retaining aquatic and terrestrial habitat in riparian zones; Biodiversity, Waterways and Wetlands Overlay Map. on a Biodiversity, Waterways and Wetlands Overlay Map. c) maintaining and enhancing wildlife corridors and connectivity Note the Lot 1 BLE has been located >20m setback from the centre line of the along watercourses and drainage lines for native fauna AO6.2 waterway onsite to avoid future exempt clearing impacts. movement; Development provides for the rehabilitation of land within: d) avoiding edge effects and damage from adjacent land uses; a) a riparian buffer area; AO6.2 – A Covenant Area Management Plan is proposed of which will provide e) maintaining stream integrity and bank stability by minimising b) a wetland area; and for rehabilitation of land within a and c of AO6.2. bank erosion and slumping; c) 10 metres either side of the centre line of any other waterway identified on a f) maintaining water quality through filtering sediments, Biodiversity, Waterways and Wetlands Overlay Map. nutrients and other pollutants; and © 2022 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.