Council archive · source document
Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239
Plans and drawings: the text below has words only, no drawings.
mcnab construction
Construction Management Plan
for Infinity Apartments
6. ENVIRONMENT
The management of environmental impacts will be undertaken in accordance with McNab’s
Environmental Management Plan. Construction can have the potential to disturb flora and fauna,
generate nuisance air and noise emissions and generate general and hazardous waste. McNab will
ensure the below Environmental Procedures are followed to ensure the risk is minimised or eliminated:
Site Establishment / Prestart Environmental Briefing
Community Consultation
Site Management
Erosion and Sediment Control
Flora Protection
Fauna Protection
Noise and Vibrations
Air Emissions
Waste Minimisation and Management
Concreting
Storage of Hazardous Substances
Contaminated Land
Acid Sulphate Soils
Water Quality
Fire Ants
Interaction with local community
Heritage protection
05-DOC-001 Rev 0 - Construction Management Plan p11 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.