Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                         mcnab construction
                                                                                                                          07-DOC-003 Rev 4




Contents
1  Introduction .................................................................................................................................... 4
 1.1    Company Information ............................................................................................................. 4
 1.2    Environmental Policy .............................................................................................................. 5
 1.3    Purpose of Environment Management Plan........................................................................... 6
2 EMP application and authorisation................................................................................................. 7
 2.1    Client / project specific requirements .................................................................................... 7
 2.2    Application .............................................................................................................................. 7
 2.3    EMP Authorisation .................................................................................................................. 7
 2.4    Distribution ............................................................................................................................. 7
 2.5    Revision ................................................................................................................................... 7
 2.6    Legislation Requirements........................................................................................................ 8
3 Project Scope of works and site location. ..................................................................................... 10
 3.1    Site location .......................................................................................................................... 10
 3.2    Project Scope ........................................................................................................................ 10
4 Roles and responsibilities ............................................................................................................. 11
 4.1    Client representative ............................................................................................................ 11
 4.2    Construction Manager .......................................................................................................... 11
 4.3    Health, Safety, Environmental and Quality (HSEQ) Manager ............................................... 11
 4.4    Project Manager.................................................................................................................... 11
 4.5    Site Foreman/Manager ......................................................................................................... 12
 4.6    McNab Personal .................................................................................................................... 13
 4.7    Subcontractors and Suppliers ............................................................................................... 14
 4.8    Delegation of Authority ........................................................................................................ 14
5 Implementation ............................................................................................................................ 15
 5.1    Overview ............................................................................................................................... 15
 5.2    Environmental Site Procedures ............................................................................................ 15
 5.3    Monitoring ............................................................................................................................ 16
 5.4    Consultation / Notification ................................................................................................... 16
6 Environmental incident – emergency procedures........................................................................ 17
 6.1    Definitions ............................................................................................................................. 17
 6.2    Environmental incident procedure ....................................................................................... 18
 6.3    Environmental complaints procedure .................................................................................. 18
7 Potential Environmental Incidents / Complaints .......................................................................... 20
 7.1    Noise and Vibration .............................................................................................................. 20
 7.2    Fuel or Oil Spill ...................................................................................................................... 20
 7.3    Cultural heritage items ......................................................................................................... 20
 7.4    Acid Sulphate soils ................................................................................................................ 20
 7.5    Dispersive soils ...................................................................................................................... 21
 7.6    Highly Erodible soils .............................................................................................................. 21



Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                                                               Page 2 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.