Project Job No.
|
EDGE BEAK ‘SLAB THICKENING
NORMAL
FOOTING
Foor oe ee
4
wh v8 6 z 8
4
75MM MIN. FROM BOTTOM REINFORCEMENT
EXTRA DEPTH
Leaalng Requirements,
)
25mm (min)
REINFORCEMENT
SLAB THICKENING DEPTH MUST NOT B&
REDUCED FOR PIPES
LOCAL DEEPENING
L_ ‘SLAB MESH
75MM MIN. EXTRA,
DEPTH REQUIRED
al
i MESH
THE FOLLOWING,
(CUTTING THE REDIFORCEUENT STEEL TO GO AROUNO THE PIPE
50MM
(GENOING THE REWWFORCEMENT STEEL TO GO OVER THE PIPE
OTE:
‘SPECAED FOQTUIG AND ELAR TOCKEMUNG DEPTH Au!D COVER REQUIREMENTS MUST BE MALNTALNED.
WHERE SENVICE PIPE ONTERPERED WITH COVER TO STEEL OR CONCRETE DEPTHS THE FOOTING MUST
BE LOCALLY DEEPENED AS SHOWN BELOW.
PARTICULAR ATTENTION SHOULD @E PAID TO THE PROVISION OF FLEXIBLE SERVICE CONNECTIONS AS,
DETAILED IN A, 3900 “THE NATIONAL PLUMEING AND ORADAGE CODE - 1696 GM ALL CLASS "W7 AHD E SITES,
Pipe Strapping Detail
i 1000MM |
ot >
1000MM
3112 TM to be placad to underside
of slab mesh avertapping pipe penetration
by 500 mm both sides of pipe.
Front View
Edge Beam
Footing ——>y
3L12 TM with sont Pipe & Support Centres for Strap as per AS3500 2.2 Section 9.2 & Table 9.1
lap both sides of pipe | Sian Baye Lagging
penetration
— }<— Starter Bar
per report
Edge Beam
Footing
Stab Fabric = - = - -- p= - AGA -- oe fO--
“Chairs Adjacient to Straps ———y/
Minimum Fi over Pipe
\ snes Steel Strap
Attached to Fabric
NOTES: THE FOLLOWING NOTES AND DETAILS PROVIDED ARE A QUIDE ONLY FOR
ARTICULATION FOR SANITARY PLUMBING, ORAIMAGE AND SHOULD BE READ IN CONJUNCTION
WETH ASINZS 3500, AS 2870 AND ANY OTHER RELEVANT STANDARD AND OTHER
REQUIREMENTE OF THE B.A,
1ALL DRAING INSTALLED IN GROUND THAT (3 FILLED, UNSTABLE, EXPANBIVE (2.0.U, 4, E
FO ALLOW MARRUUL (+) CA (4 MOVEMEST. A MENTLN 15" BEND 20 BE INSTALLED BEFORE
SIMVEL JODITS 70 ACHIEVE MINIMUM GRADES FROM THE FACE OF THE FOOTINGS
For this particular site, the following minimum requirements may be adopted :-
7..DETAIL AND SUPPORT OF TRAPS AT THE 0.8.0. TO BE CONCIOERED ON SITE, TO ALLOW
POR POTENTIAL MOVEMENTS. THE O.R.G. SHOULD BE CAST IN CONCRETE MONOLITHICALLY WITH
‘THE FOOTING BYETEM ON CLASS M AND E GITES,
4-ALL PVC PE WORK PASCING THROUGH CONCRETE MUST HAVE 254 LAGQING
S[BTORM WATER SYSTEMS THAT COLLECT ROOF WATER AND GURFACE WATER ARE REQUIRED
COMSTRUCTION ENCULD BE ARTICULATED TO ACCOMMODATE GRGUNO MOVEMENTS WHTHOUT
CEAKASI
12-EEPTIC TAYKB AND ABSOCIATED ZOAKAGE AREAS SHOULD BE LOCATED TO MiNRASE GOL.
AIGISTURE DICREASES WITION THE FOUNDATION. JOUITS In PLUMBING PIPES WITHON 3.0
METRES OF THE HOUSE UNDER COKSTRUCTION SHOULD SE ARTICULATEO 10 ACCOMMOOATE
‘GROUND MOVEMENTS WITHOUT LEAKAGE. BEPTIC TAXKS IN PARTICULAR REQUIRE CAREFUL
REFER TO THE GURLDIND DESIGNER
{SALE OCTARS ARE INOICATIVE ORLY. DESIGN OF PATHS FOOTING ETC. AKD LOCATION OF
PENETRATIONS 10 GE SPECIFIED BY AN ENGINEER
{G-PROMSIONS SHOUL BE MADE FOR THE CORNECTION OF OVERFLOW OR WATER CISCHARGE
PROM POTURES SUCH AS HINA. AND ACC. TO A DRAB AS REQUIRED BY THE RELEVANT
LOCAL AUTHORITY.
APLEXPECTED MINILAS REOUIRMENTE FOR EXPANSION AKD ALLOWAELE RELATION BY FITTING
AS FOLLoMS:
SITE CLASS MINIMUM REQUIRED EXPANSION JOIN CAPACITY ALLOWABLE ROTATION
"Ss" MINIMUM 25MM LAGGING THROUGH FOOTINGS NOT APPLICABLE
Where a cut/ill site preperation is undertaken, ail pipes within the fill aspect of the site MUST adopt
the following untess compaction certification in accordance with AS3798-2007 is supplied :-
SITE CLASS MINIMUM REQUIRED EXPANSION JOIN CAPACITY ALLOWABLE ROTATION
"Pp" 15°
- Pipes to be strapped / hung from slab mesh (refer detail)
Note: These details are to be used as a guide only. Where it is a requirement of the relevant Local Authority for these details to be
adhered to, any variations or modifications shall be directed at the Local Authority as per AS2870-1996 Section 5.5.4 clause (d) -
Alternatively, STA Consulting Engineers can be commissioned to undertake an under slab drainage design for site specific circums
4
Site
Classification
“Bis”
east!
eee
—-.
|
tances ,
OVERLAP PIPES 150MM
DOWN PIPE
MINIMUM AS SHOWN.
GROUND
‘SURFACE FALL
1:50 MIN
“EXPANDA™ JOINT (LUBRICATED WRAPPED IN
2 LAYERS OF 200 MICRON POLYTHENE AND
SEALED WITH PRESSURE SENSITIVE TAPE TO
EXCLUDE SOM PARTICLES}
OR OTHER APPROVED
TYPICAL UNDER SLAB-EDGE BEAM / WAFFLE POD
PROVIDE VISUAL SPACE
[LV TO COMPLY WITH AS3660.1
SELECTED
x
OR OTHER
+——
STORM WATER
DRAINAGE PIPE
ALLOW PIPE WORK TO MOVE
VERTICALLY INDEPENDANT
OF BUILDINGS:
A
TYPICAL STORM WATER DETAIL {ALTERNATIVE}
FLEXIBLE JOINT BETWEEN
SLAB AND WALL
GRATED DRAIN
\ —™
ah PROVIDE VISUAL
|_- SPACE TO COMPLY
(| WITHAS. 3660.4
SELECTED ARTICULATION
FLEXIBLE JOINT
INGROUND-
PIPE WORK
T
=<yYy
[ SLAB TO BE TIED
BACK TO THE
BULDING TO
MINIMISE FORCES
ON THE PIPE WORK
WHERE SPECIFIED
BY AN ENGINEER
OOWN PIPE TO GRATEO DRAIN DETAIL
‘SELECTED ARTICULATION JOINT
E.G. STORM PLASTICS “SWIVEL JOINT”
FLEXIBLE FITTING INSTALLED TO
MANUFACTURES RECCOMMENDATIONS
E.G. STORM PLASTICS “SWIVEL JOINT
FITTING INSTALLED TO.
MANUFACTURES
RECOMMENDATIONS,
DETAIL
9
8
3
ay
84
FINISHED
75 MIN,
a
8
2
ES98868-B Amended 19/04/2010
QETAILS AND SPECIAL
REQUIREMENTS FOR
SUPPORT AND JOR
PROVISIONS OF
ARTICULATION WN PIPE
WORK FOR ALL UNDER
SLAB DRAINAGE ARE ONLY
REQUIRED WHERE
SPECIFIED BY THE DESIGN
ENGINEER FOR THE
RELEVANT SITE
CLASSIFICATION AND /OR
AS REQUIRED BY
AS. 3500 OR AS, 2870
ARTICULATION JOINT
APPROVED FLEXIBLE
ADDITIONAL LAGGING TO
O.R.G. TO LOCAL COUNCIL
PIPE FROM FIXTURE, >
1
i
Rw
DOWEL BARS TO
ENGINEERS DETAIL
(IF NOT POURED.
MONOLITHIC WITH
FOOTINGS )
yy ON
Ww
CONCRETE-ENCASED O.R.G.
I (POURED IN-SITUMONOLITHIC
SPECIFICATIONS
WITH FOOTINGS)
TYPICAL SECTION AT 0,R.G. TO PREVENT SHEAR AT FOOTING FACE
MIN 1$ DEGREE BEND TYPICAL
SELECTED ARTICULATION JOINT
E.G. STORM PLASTICS “SWIVEL JOINT”
OR OTHER APPROVED FELXIBLE
FITTING INSTALLED TO
MANUFACTURES
RECOMMENDATIONS N
“EXPANDA" JOINT (LUBRICATED WRAPPED IN
2 LAYERS OF 200 MICRON POLYTHENE AND
SEALED WITH PRESSURE SENSITIVE TAPE TO.
EXCLUDE SOIL PARTICLES
TYPICAL PIPE THROUGH FOOTING DETAIL - SECTION
LOCATION OF PENETRATIONS
~
TO ENGINEERS DESIGN
BACK FILL WITH COMPACTED CLAY SOILS OR SELECTED ARTICULATION JOWT E.G. STORM
LAGGING PLASTICS “SWIVEL JOINT” OR OTHER APPROVED
EQUIVALENT TO FORM IMPERMEABLE LAYER TO OR SLEEVE NST To ACTURES
ALL TRENCHES WITHIN 1S00MM OF THE BUILDING (— ecouENDATIONS ALLEL MANUF
5 e FOOTING
sls 4
ale NATURAL SURFACE
=
4 —_
Zlzg
x
EES
APPROVED BEDDING
MATERIALS TO.
APPROPRIATE COVER
CLAY PLUG TO FULL
DEPTH OF BEODING
AT FOOTING ZONE.
WIDTH VARIES
TYPICAL TRENCH DETAIL
“EXPANDA” JOINT (LUBRICATED WRAPPED IN
2LAYERS OF 200 MICRON POLYTHENE AND
SEALEO WITH PRESSURE SENSITIVE TAPE TO
EXCLUDE SOD PARTICLES
TYPICAL CONNECTION FROL PIPE WORK TO BRANCH LINE DETAR
Design Company
STA CONSULTING ENGINEERS
Unit 6, 848 Boundary Rd, Richlands, Qld, 4077
ACN 129 441
con
890 Fax (07) 33759299 Ph.3363 8181
Client
Monte Constructions
SUUTING
ENGINEERS
t
PO Box 8425, Woolloongabba Qid 4102 #
Site Address
Lot 13, No.13 Grant Street, Noosa Heads
Page 6 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0662 - Operational Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.