Original source · versioned page text
15-001261-Full Set
From the archive OpWks.submission.EWKS.120615.zip, inside OPW15/0099 Application Forms 1 & 6 - Earthworks. File date in the archive: 2015-06-12 17:26.
The original of this document is very large (15.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
PALM LAKE RETIREMENT VILLAGE - COOROY 19 TRADING POST ROAD, COOROY DRAWING INDEX ROADWORKS, DRAINAGE AND BULK EARTHWORKS 15-001261-100 DRAWING INDEX AND LOCALITY PLAN 15-001261-101 OVERALL LAYOUT PLAN 15-001261-102 BULK EARTHWORKS LAYOUT PLAN SHEET 1 15-001261-103 BULK EARTHWORKS LAYOUT PLAN SHEET 2 15-001261-104 BULK EARTHWORKS LAYOUT PLAN SHEET 3 15-001261-105 BULK EARTHWORKS NOTES AND SECTIONS 15-001261-106 ROAD WORKS AND DRAINAGE LAYOUT PLAN SHEET 1 15-001261-107 ROAD WORKS AND DRAINAGE LAYOUT PLAN SHEET 2 15-001261-108 ROAD WORKS AND DRAINAGE LAYOUT PLAN SHEET 3 15-001261-109 ROAD WORKS AND DRAINAGE NOTES AND DETAILS 15-001261-110 EROSION AND SEDIMENT CONTROL LAYOUT PLAN SHEET 1 15-001261-111 EROSION AND SEDIMENT CONTROL LAYOUT PLAN SHEET 2 15-001261-112 EROSION AND SEDIMENT CONTROL LAYOUT PLAN SHEET 3 15-001261-112 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS REMAINING DRAWING SET NUMBERING TO BE ADVISED SEWERAGE RETICULATION 15-001261-200 SEWERAGE RETICULATION NOTES, DETAILS AND LOCALITY PLAN 15-001261-201 SEWERAGE RETICULATION LAYOUT PLAN SHEET 1 OF 2 15-001261-202 SEWERAGE RETICULATION LAYOUT PLAN SHEET 2 OF 2 15-001261-203 SEWERAGE RETICULATION LONGITUDINAL SECTIONS WATER RETICULATION 15-001261-300 WATER RETICULATION LAYOUT PLAN FILE: 15-001261-100.dwg DATE: 02-06-2015 TIME: 08:30 Xref's: X_15-001261_TITLE USR: adam young FOR PALM LAKE’ CONSTRUCTION HOLD POINT PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL VERIFY LEVELS OF ALL EXISTING CROSSINGS AND CONNECTION POINTS. CONSTRUCTION HOLD POINT ONCE THE BASE OF MANHOLES, INSPECTION PITS, GULLIES AND FIELD INLETS FOR STORMWATER DRAINAGE AND SEWER RETICULATION HAVE BEEN POURED, FURTHER CONSTRUCTION SHALL NOT PROCEED UNTIL THE SUPERINTENDENT AND OR ENGINEER HAVE INSPECTED THE WORKS FOR FINISHED LEVELS AND APPROVED CONSTRUCTION TO CONTINUE CONSTRUCTION NOTE THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH: - STORMWATER QUALITY MANAGEMENT REPORT - CALIBRE CONSULTING - TRAFFIC IMPACT ASSESSMENT - CALIBRE CONSULTING - ACOUSTIC ASSESSMENT REPORT - ASK CONSULTING - ELECTRICAL CONSULTANTS PLANS - ELECON - TBA - LANDSCAPE ARCHITECT PLANS - TBA No. OF LOTS = 2 AREA OF SITE = 12.6 ha RP DESCRIPTION LOT 1 ON RP215922 LOT 2 ON RP165418 PARISH OF TEWANTIN COUNTY OF MARCH DATUM LEVEL P.S.M. 24974 RL 110.614 AHD =m | RiVER ... RD . i oe ae LOWERMILL ih |Copyright Universal Publishers Pty Ltd \ LOCALITY PLAN N.T.S. U.B.D. REF: AUSTRALIAN CITY STREETS V3 (BRISBANE - OCTOBER 2005) MAP: 4 | GRID: R20 REF NO. 132007.2398.02 ‘SCALE ( METRES ‘CUENT sar cae al a RRO We TaAWG TE AMENOMENT DETALS DESIGN, gvecK SURVEYOR: ML_SURVEYS soe [ar [ar [ests NW 38 Leybourne Street, Chelmer QLD 4068 PALM LAKE C CONSULT AUSTRALIA DRAWING INDEX AND ah Mob: 0412 744 223 FE: [email protected] | LOCALITY PLAN Nic pa =z PROJECT No. "APPROVED . A “lp 6-00081 19 TRADING POST ROAD Calibre Got Contig LD) Py Ley eal sae waa = Ne = MATTHEW HILL RPEQ 11578 Teephore 07 3895 3444 Facsimile 07 895.3400 SOMPETY sir FOR & ON BEHALA OF CHIBRE-CONSULTING (QLD) PTY LTD RETIREMENT VILLAGE CONSULTING Brisbane Canbera Meloume Sydney Singapore Sunshine Coast Lic 4064 15-001261-100
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.