OPW16/0078 - Operational Works Application
Email address (non-mandatory requirement) [email protected]
Applicant’s reference number (non-mandatory
requirement)
1. What is the nature of the development proposed and what type of approval is being sought?
Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2.)
a) What is the nature of the development? (Please only tick one box.)
Material change of use Reconfiguring a lot Building work Operational work
b) What is the approval type? (Please only tick one box.)
Preliminary approval Preliminary approval Development permit
under s241 of SPA under s241 and s242
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
The Existing Building is being extensively renovated. .
All the stormwater from the existing building and awning (142sqm) is currently discharged through 3 100x50
rhs pipes under the footpath to the kerb in Hastings Street (2 on the East and 1 on the West)
To drain the new awning and lower roof of the building t. he proposal is to replace the existing downpipes in
Hastings Street with 2 new 100mm down pipes connected to the existing cross footpath outlets
discharging into the kerb. This is approximately 38 sqm
To drain the new upper roof the proposal is to discharge it to the back of the building and construct a new
stormwater line through Bay Village property to the council stormwater system in Noosa Pde. This
discharges approximately 107 sqm of roof water.
Whilst Bay Village has not given permission for this to happen several meetings have taken place with positive
outcomes. The property owner (Callambee Nominees) has been requested by Bay Village Body Corp to
make a formal application for consideration. This is being done at the moment by The Callambee Solicitor
and should be submitted to Bay Village for their next Body Corp meeting
d) What is the level of assessment? (Please only tick one box.)
Impact assessment Code assessment Operational Works -
Stormwater
Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C—
Additional aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
Material change of use Reconfiguring a lot Building work Operational work
b) What is the approval type? (Please only tick one box.)
Preliminary approval Preliminary approval Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
IDAS form 1—Application details
Version 4.2—3 August 2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0078 - Operational Works ApplicationRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.