4.4 Stormwater
Water Quality Objectives are mandated by the State Government. They are
identified in the State Planning Policy 2017 (SPP). The SPP includes the
following triggers to that are required to achieve water quality objectives:
“(2) Reconfiguring a lot for an urban purpose that involves premises 2500m2
or greater in size and will result in six of more lots”.
Based on the above, there are no water quality objectives that are required to
be achieved for this development. However, it is noted that a bio-retention
basin will be provided at the northeastern corner of the subject site to aid in
maintaining stormwater quality for the subject site.
Stormwater for any development on proposed Lot 1 and 2 will have a lawful
point of discharge connected to the bio-retention basin. Stormwater from the
new road will be captured and discharged into the bio-basin. Lot 3 will be
provided with a lawful point of discharge in the south east corner of the Lot
which will drain to the drainage reserve beyond (see Appendix E for details).
The proposed measures will provide a significant amenity improvement to
properties along the adjoining Dianella Court by providing additional
infrastructure for stormwater discharge and a bio-retention basin for
stormwater quality management as opposed to sheet flowing to the east under
the current scenario.
16
Planning Report No. 100988 Murray & Associates (QLD) Pty Ltd February 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report - 100988.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.