‘Detailed flood modelling of the catchment and subject intersection has
demonstrated the capacity of the existing culverts provides 10% AEP design
flood immunity to the intersection. For larger and rarer flood events of less
than 2% AEP the model results show the intersection will experience water
over the road to depths of less 0.3 m for a 1% AEP flood event for relatively
short durations of less than 1.5 hours.
The flood modelling has also demonstrated that should a significant blockage
of the culverts occur during a major rainfall flood event the depths of inundation
across the culvert would not be expected to significantly change, however, the
inundation may persist for longer periods.’
The proposed development will factor in these findings, noting the bio-retention
basin and additional drainage infrastructure should aid in reducing inundation
periods at the Lake Macdonald Drive – Dianella Court Intersection (see
Appendix C, E & I for details).
22
Planning Report No. 100988 Murray & Associates (QLD) Pty Ltd February 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report - 100988.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.