Minor Change Existing Approval OPW16 0303 02 (As Published)

of 10

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                 Officer:            Stacey Clohesy
                                                                                 Direct Telephone:   07 53296129
                                                                                 Our Reference:      OPW16/0303.02
                                                                                 Your Reference:     .

               16 December 2025


               Palm Lake Works Pty Ltd
               PO Box 10479
               SOUTHPORT BC QLD 4215
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 2 October 2025, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              OPW16/0303.02

                   Street address:              19 Trading Post Rd Cooroy Qld 4563

                   Real property description:   Lot 102 SP 287641

                   Planning Scheme:             Noosa Plan 2020 (26 September 2025)

               2.      DECISION DETAILS

               The following type of approval was issued on 27 January 2017.
               •     Development Permit for Operational Work - Landscaping
               In relation to the request to make a minor change to the existing approval, Council on 12 December
               2025, decided to approve in part the requested changes. The changes are detailed below.
               A.      Approve the change in part.
               B.      Amend condition 1 and 3.
               C.      Refuse to change condition 22(b) for the reason:
                        i.   The request for a reduction in the maintenance period for buffer planting from 36 months
                             to 12 months is not supported due to the time required to successfully establish the mix
                             of species, densities, mounding, mulching and maintenance.
               D.      Include additional conditions 24 and 25.




               ABN 97.969.214.121                                                                 PO Box 141
               noosa.qld.gov.au                                                            Tewantin QLD 4565
               [email protected]                                                            07 5329 6500
                                                                                                           Page 1 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025
Log in to download the original file

Minor Change Existing Approval OPW16 0303 02 (As Published).pdf · 183 KB (small file)

Full text of the other 9 pages

Page 2

               3.     CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is 2 years starting the day that the original
               development approval OPOW16/0303 took effect.
               4.     ASSESSMENT MANAGER CONDITIONS

               LANDSCAPE CONDITIONS
                      Plans and Documents
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development, with annotations by Council. The approved and annotated
                      plans are listed in the following table unless otherwise amended by these conditions.

                         Plan No.          Rev.   Plan/Document Name                          Date

                         TP-00             A      Cover Sheet as annotated by Council         11/11/16
                                                  Prepared     by   Hamilton     Landscape
                                                  Architects

                         TP-01             A      Landscape Masterplan as annotated by 11/11/16
                                                  Council
                                                  Prepared     by   Hamilton     Landscape
                                                  Architects

                         TP-02             A      Landscape Fencing Plan as annotated by 11/11/16
                                                  Council
                                                  Prepared     by   Hamilton     Landscape
                                                  Architects

                         TP-03             A      Surface Finishes Plan as annotated by 11/11/16
                                                  Council
                                                  Prepared     by   Hamilton     Landscape
                                                  Architects

                         TP-04             A      Planting Plan                               11/11/16
                                                  Prepared     by   Hamilton     Landscape
                                                  Architects

                         TP-05             A      Trading Post Road Design as annotated 11/11/16
                                                  by Council
                                                  Prepared     by   Hamilton     Landscape
                                                  Architects

                         TP-06             A      Tree/Palm Planting Plan                     11/11/16
                                                  Prepared     by   Hamilton     Landscape
                                                  Architects

                         TP-07             A      Shrub Planting Plan as annotated by 11/11/16
                                                  Council
                                                  Prepared     by   Hamilton     Landscape
                                                  Architects



                                                                                                Page 2 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025

Page 3

                         TP-08              A      Bioretention Basin 1 as annotated by 11/11/16
                                                   Council
                                                   Prepared     by    Hamilton    Landscape
                                                   Architects

                         TP-09              A      Central Bioretention Basin as annotated by 11/11/16
                                                   Council Prepared by Hamilton Landscape
                                                   Architects

                         TP-10              A      Bioretention Basin 2 as annotated by 11/11/16
                                                   Council
                                                   Prepared     by    Hamilton    Landscape
                                                   Architects

                         IAS17818           1      Arboricultural Impact Assessment and 22/08/2025
                                                   Visual Tree Assessment prepared by
                                                   Independent Arboricultural Services

                         12 December 2025

                         213-001-CD001      D      Landscape Cover Sheet prepared by 01/10/2025
                                                   Citicene


                         213-001-CD002      D      Landscape Specification Notes prepared by 01/10/2025
                                                   Citicene


                         213-001-CD003      D      Landscape Schedules prepared by Citicene 01/10/2025
                                                   as annotated by Council


                         213-001-CD600      D      Landscape Plan prepared by Citicene         01/10/2025
                                                   as annotated by Council

                         213-001-CD601      D      Landscape Plan prepared by Citicene         01/10/2025
                                                   as annotated by Council

                         213-001-CD602      D      Landscape Plan prepared by Citicene         01/10/2025
                                                   as annotated by Council

                         213-001-CD800      D      Landscape Details prepared by Citicene      01/10/2025

               2.     All landscaping works on Elm Street Frontage must be established and maintained to provide
                      a vegetated screen to the Elm Street acoustic fence and roofs associated with the
                      development.




                                                                                                  Page 3 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025

Page 4

               3.     Elm Street Frontage landscape works between, and including, lots 17 to 65 must be in
                      accordance with permit approval conditions for operational works (civil) Council File
                      OPW16/0203 including plans:

                           213-001-CD603        D      Landscape Plan prepared by Citicene             01/10/2025
                                                       as annotated by Council

                           213-001-CD604        D      Landscape Plan prepared by Citicene             01/10/2025
                                                       as annotated by Council

               4.     Works on a State controlled road (Elm Street) require a Traffic Control Permit (TCP) from the
                      Department of Transport and Main Roads (DTMR). An approved TCP must be submitted to
                      Council prior to commencement of the works in the State controlled road.
               5.     All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans, as amended by Council, and conditions detailed in this Decision
                              Notice.
                      b.      All relevant Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines, including Planning Scheme Policy 3 Landscaping Plants
                              and Guidelines.
                      c.      The latest version of Water Sensitive Urban Design Technical Design Guidelines for
                              South East Queensland (Healthy Waterways) for all water quality devices to be
                              constructed on site or the approved stormwater management plan.
                      d.      All necessary permits required by third parties including Department of Transport and
                              Main Roads (DTMR).
                      Landscaping Works
               6.     Where damage occurs to any Council asset as a result of the development works, it must be
                      repaired immediately.
               7.     Landscape works must:
                      a.      Delineate all planting to grassed area interfaces with a timber edge including areas
                              between all gardens and lawn in the road reserve areas of Pearsons Road and Trading
                              Post Road.
                      b.      Ensure amenity or sales signage and ancillary infrastructure is not installed within the
                              road reserve.
                      c.      Provide additional street tree planting to the Trading Post Road and Pearsons Road
                              reserves. All street trees must be 45 litre with a NATSPEC certificate approval provided
                              to Council. Street Trees are to be established between the back of the kerb and the
                              required concrete pathway at an average of 8 metre centres. Species are to be suitable
                              for site specific planting conditions and include native species.
                                   i.   Buckinghamia celsissima
                                  ii.   Cupaniopsis anacardioides
                                 iii.   Elaeocarpus reticulatus
                                 iv.    Waterhousea floribunda
                                  v.    Callistemon viminalis
                                 vi.    Eucalyptus ptychocarpa
                                vii.    Callistemon salignus
                                viii.   Acmena hemilampra
                                 ix.    And other native species as agreed to in writing by Council.


                                                                                                         Page 4 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025

Page 5

                      d.      Ensure permanent irrigation is not installed within the road reserve.
                      e.      Remove and treat all environmental weeds within the site and along the Elm Street
                              frontage.
                      f.      Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of
                              foreign matter including anthropogenic waste, rock, soil/sediment contamination and is
                              applied to all planting areas to ensure a minimum 100mm depth once settled.
               8.     Street trees* must:
                      a.      Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC).
                      b.      Be Native species.
                      c.      Be located in accordance with engineering requirements for safe vehicle and
                              pedestrian sight lines.
                      d.      Be located from services and infrastructure a minimum of:
                              i.       6m from electricity poles and pillars.
                              i.       4m from street lighting.
                              ii.      2m from stormwater catchment pits.
                              iii.     2m from any adjoining driveway.
                              (* Refer to Advisory Note)
               9.     All Turfed areas must be must be free of pest, diseases and weeds and level with adjoining
                      surfaces
                      Bioretention Devices - Landscaping
               10.    All landscaping works to the Bioretention Devices must be in accordance, and not conflict
                      with, the Council approved Storm Water Management Plan.
               11.    Landscape plans must include a mixture of at least five of the following species for planting
                      in the bioretention basin extended detention surface at a minimum density of 8 plants/m2:
                      a.      Carex appressa
                      b.      Carex fascicularis
                      c.      Ficinia nodosa
                      d.      Juncus usitatis
                      e.      Lomandra longifolia
                      f.      Ghania sieberiana
               12.    Landscape plants for the areas surrounding the bioretention basin filter media footprint must
                      be arranged to minimise shading to the filter media footprint are. Suitable plants include the
                      following:
                      a.      Carex appressa
                      b.      Carex fascicularis
                      c.      Ficinia nodosa
                      d.      Juncus usitatis
                      e.      Lomandra longifolia
                      f.      Ghania sieberiana
                      g.      Banksia robur
                      h.      Dianella brevipendunculata
                      i.      Themada triandra


                                                                                                      Page 5 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025

Page 6

                      j.      Cymbopogan refractus
                      k.      Melaleuca thymifolia
               13.    Where landscaping/garden beds are proposed adjacent to the bioretention basin, or where
                      the basin is located adjacent to naturally forested areas, a 900mm deep root barrier must be
                      installed to the interface between the landscape/garden/forest area and the bioretention
                      basin to prevent root intrusion to the biobasin infrastructure.
               14.    Landscaping to the surface of the bioretention basin filter media area must not commence
                      until 80% of building work within each contributing catchment is complete or after 3 years,
                      whichever occurs first. An uncompleted works bond of 150% of the value of the planting to
                      the surface of the bioretention basin filter media area must be provided to Council prior to
                      the release of the Plan of Survey.
               15.    Where required, mulch within the batters of bioretention basins must be installed in a manner
                      that it will not escape into receiving stormwater drainage infrastructure or water courses.
                      Bioretention Devices - Education
               16.    The development shall be provided with approved permanent signage to educate the public
                      on the function of the bioretention basin. The wording for the signage for each bioretention
                      basin is to include: “BIORETENTION BASIN - This bioretention basin reduces the pollution
                      of our waterways by reducing the amount of heavy metals, litter, suspended solids, and
                      nutrients discharged to Six Mile Creek”.
                      FOLLOWING CONSTRUCTION
                      Supervision/Certification
               17.    Prior to commencement of use the following (prepared by respective qualified persons*
                      and certifying compliance with approvals) must be submitted to Council:
                      a.      Landscaping certification confirming all works have been constructed in accordance
                              with conditions of approval.
                      b.      NATSPEC certification (Specifying Trees: a guide to assessment of tree quality
                              addressing each specimen).
                      (* Refer to Advisory Note)
                      Site Stability
               18.    Prior to the completion of the development, all site surfaces must be effectively stabilised.
                      For the purpose of this condition, an effectively stabilised surface is defined as one that does
                      not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully
                      erosion or lead to sedimentation, or lead to water contamination.
                      FOLLOWING CONSTRUCTION
                      Bonds
               19.    Bonds must:
                      a.      Meet the requirements of the relevant Council Planning Scheme Policy for performance
                              and uncompleted works.
                      b.      Be calculated using a schedule of works and relevant bond equation.
                      c.      Include GST.
                      d.      Have approval of the bond calculations and amount from Council, prior to lodgement.
                      e.      Be lodged with Council and accompanied by the Bond Administration Fee/s.
                      f.      Be requested for release by writing to Council, when relevant approval requirements
                              have been met.
               20.    A Maintenance Bond of $7000 must be lodged for:



                                                                                                       Page 6 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025

Page 7

                      a.      External Landscape works to become a Council and DTMR asset.
                      b.      2m buffer plantings in the lot on the Elm Street frontage
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               21.    Uncompleted Works Bonds must be lodged for Bioretention Devices – Landscaping works
                      being completed after 80% development (dwellings) construction.
                      On Maintenance
               22.    Maintenance periods* must be:
                      a.      12 months for Trading Post and Pearson Road Streetscape.
                      b.      36 months for Elm Street Road and Elm Street 2m buffer plantings.
                      c.      36 months for Water Treatment Devices Landscape.
                      *(Refer to Advisory Note)
               23.    Prior to requesting an On Maintenance inspection the following (prepared by respective
                      qualified persons* and certifying compliance with approvals) must be submitted to Council:
                      a.      Landscaping certification.
                      b.      Specifying Trees: a guide to assessment of tree quality (NATSPEC) certification
                              (addressing each specimen).
                      c.      All required landscape bonds.
               Additional conditions – 12 December 2025
               24.    A prestart meeting must be organised with Council’s delegate by calling 5329 6500 (giving
                      at least five business days’ notice). The prestart meeting must be attended by the responsible
                      persons for:
                      a.      Landscape works
               25.    Existing mature trees along the Elm Street road frontage, as documented in the approved
                      Arborist report, must be retained in good health for the life of the development by the
                      landholder. In the event of decline in health any of these trees and where they have been
                      documented by a qualified arborist, with a minimum qualification of International Society of
                      Arboriculture (ISA) certification or Diploma of Arboriculture, to pose an unacceptable risk to
                      life and/or property, the landholder must notify Council in writing and provide the qualified
                      arborist documentation prior to, or within 48 hours of, the required vegetation management.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                       Equitable Access and Facilities
               1.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and



                                                                                                            Page 7 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025

Page 8

                      c.      the Disability (Access to Premises – Buildings) Standards
                       Aboriginal Cultural Heritage Act 2003
               2.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
                       The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                       carries out an activity must take all reasonable and practicable measures to ensure the
                       activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the
                       duty of care. Substantial monetary penalties may apply to individuals or corporations
                       breaching this duty of care. Injunctions may also be issued by the Land and Resources
                       Tribunal, and the Minister administering the Act can also issue stop orders for an activity that
                       is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of
                       Aboriginal cultural heritage.
                       You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations
                       under the ACH Act.
               3.     Qualified Person, for the purpose of:
                      a.      Supervising landscape works and preparing a landscape certification, is considered to
                              be a landscape architect, landscape designer or horticulturist with a minimum of three
                              years current experience in the field of landscape design.
                      b.      Undertaking landscape construction and establishment works is considered to be a
                              person with five years current experience in commercial landscape construction
                              projects.
               4.     Street trees are defined as any tree located within public streets, parks or areas that will
                      become publically owned as a result of this development.
                      Prestart, On and Off Maintenance, Rehabilitation Inspections Request
               5.     Contact Council on 5329 6500 to arrange a prestart meeting or an inspection giving a
                      minimum of five business days’ notice of preferred inspection time.
                      On Maintenance
               6.     Request for On Maintenance is the responsibility of the developer. No credit will be given
                      due to failure to request inspection. Maintenance works are the responsibility of the
                      developer and must include regular inspections, repairs, rectifications and establishment. A
                      single maintenance run immediately prior to inspection is not acceptable.
                      Off Maintenance
               7.     A re-inspection fee in accordance with Councils Fees and Charge Register will be charged
                      where:
                      a.      A Council inspection reveals works do not comply with approval requirements.
                      b.      Submitted certification falsely states works comply with approval requirements.
                      Retention of Existing Trees
               8.     The existing trees on adjoining properties must be retained and protected during construction
                      wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
                      operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
                      construction of the development which is the subject of this development approval.
               9.     No clearing of vegetation on DTMR land is authorised by this permit.
               10.    Infrastructure Charges




                                                                                                         Page 8 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025

Page 9

               11.      All developments and/or changes to existing developments may require payment of
                        “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                        made pursuant to the planning legislation and regulations current at the time of issue. For
                        further information, please refer to https://www.noosa.qld.gov.au/planning-
                        development/development-tools-guidelines/infrastructure-charges
                        Vegetation on Department of Transport and Main Roads land
               12.      This approval does not permit any vegetation removal or planting on land within
                        Department of Transport and Main Roads jurisdiction. Landholder permission should be
                        obtained from Department of Transport and Main Roads prior to works commencing.
               7.       PROPERTY NOTES

               Not applicable.
               8.       VARIATION APPROVAL DETAILS

               Not applicable.
               9.       FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.      SUBMISSIONS

               Not applicable.
               11.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,


               Stacey Clohesy
               Senior Environment Officer | Development Assessment
               Development & Regulation


               Enc:     Appeal Rights
                        Approved Plans/Documents




               DECISION NOTICE HISTORY
               •     Original Decision Notice – 27 January 2017.

               •     Generally in Accordance – OPW16/0303.01 – 14 October 2019.

               •     Decision Notice – Minor Change – OPW16/0303.02 – 12 December 2025, with an amendment to conditions 1 and 3 and additional
                     conditions 24 and 25.




                                                                                                                              Page 9 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025

Page 10

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 10 of 10
Document Set ID: 24382438
Version: 5, Version Date: 18/12/2025

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.