State-controlled road matters 2. The application involves: (tick applicable box/es)
For more informabon refer to Guage 3. [1 {i) development on land contiguous’ to a State controlled road and for -
Uniess you answered "none of the above” to Q2, . .
the application triggers referral to the Department {"] (a) material change of use assessable against the planning scheme;
of Main Roads Main Roads (DMR) as referral ae (| (b) reconfiguring a fot unless -
In certain circumstances DMR will be an advice . . .
agency, while in other circumstances DMR wil + the total number of lots is not increased; and
be @ concurrence agency. « the total number of lots abutting the State-controlied road is not increased;
See assis you to [J (c) operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}
* associated with access to a State-controlled road; or
¢ for filling or excavation; or
* involving the redirection or intensification of site stormwater from the fand, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
{_] (ii) development on land not contiguous to a State-controlled road and -
[J (a) material change of use -
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the [P Regulation and exceeding the thresholds set by
that schedule;
[_] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regutation
and exceeding the thresholds set by that schedule;
[J (c) operational work (not associated with a material change of use assessable against ‘@
planning scheme or reconfiguring a lot mentioned in (b) above}-
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
wm that schedule.
(ii} none of the above
Clearing vegetation . 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. C] (i) material change of use —
answered “none of the above” to Q3, . ;
the apviieaion requires assessment ihe. 8 (a) assessable against the planning scheme;
a artment of Natural Resources and Water (b} on alot containing -
if an agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa + if there is no property map of assessable vegetation for the lot - remnant vegetation;
Pott ope, Honey for the appscation in relation (c) where the existing use of the land is a rural or environmental use; and
If you licked ©3(i) or (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of (J {ii} reconfiguring a fot -
whether vegetation clearing iS proposed or not. _.
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation; ‘
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
LJ (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
iv} none of the above.
Strategic port land . 4. The application involves:
For move information reler to Guige Lt. [] (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
ff you ticked (i) - the relevant Port Authority is the Act) - complete Part ! of Form 1
assessment manager for the application.
if you ticked (ii) Queenstand Transport is a _] (ii) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the apphication.
TI Act for the strategic port land - complete Part! of Form 1
iA none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controtted road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1852 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.