Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2020-02-11 P&E Agenda - Item 1 - Attachment 2 - MCU18-0166 - Visual Impact Assessment

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

F IGURE 5-3 S ITE LAYOUT PLAN




IRIS Visual Planning + Design   Page 13

EXISTING SERVICE MAINS TO BE REMOVED BY SUPPLY AUTHORITY
                   ”       5	1	1	1	2	3	941	394	4	2	33	a
5	1	1	1	2	4	1317	372	48	30	95	NEW
5	1	1	1	2	5	1375	371	109	22	96	SERVICES
5	1	1	1	2	6	1494	372	55	21	96	MAIN
5	1	1	1	2	7	1559	371	31	22	96	BY
5	1	1	1	2	8	1600	371	91	22	94	SUPPLY
5	1	1	1	2	9	1701	371	133	22	96	AUTHORITY
4	1	1	1	3	0	579	402	1603	72	-1	
5	1	1	1	3	1	579	406	41	27	34	wth
5	1	1	1	3	2	702	421	24	53	80	\
5	1	1	1	3	3	874	434	6	13	17	1
                                                         (i         NEW PROPERTY POLE TO COMPLY WITH QECM WITH NEW POINT OF SUPPLY
  eeranMeNCInG              —_                                     EXISTING METER PANEL CONVERTED TO A SWITCHBOARD AND NEW
                              oss:          €                       GROUP METER PANEL ON EXISTING PROPERTY POLE
                         c          OX                              NEW NBN SUBMAIN
  EXISTING ENERGEX       \ \\            ff                         EXISTING VEHICLES TO BE MOVED BY LANDOWNER
 rove Bole 12a    A         MSF                  Lx SD <——          NEW ACCESS TRACK, APPROX. 45m LONG
  SP uSNTGHTa Teron        \ \7                 —— OX          }-—— NBN CONSTRUCTION AREA
                           \             RAS FRC 8 |
                                                      SSge\c
  NEW SUPPLY AUTHORITY POLE-+ \                        ee           EXISTING CONTAINER TO BE RELOCATED BY NBN
  NEW 3 PHASE SUPPLY AUTHORITY                              RRS  OS
  LV NETWORK EXTENDED BY      XS                      \    .      o>
  SUPPLY AUTHORITY                 Zeer                             ae
                                        oe          a    x
  NEW SUPPLY AUTHORITY POLE       i      oe             a   if 1
                                                a      =)
  EXISTING TELSTRA SITE              _             ENE
                         7             ate os =                              ‘
                        ;                               MS        cs
                             si  t                       \\ Wn        ee
                                 '                       v\ By              a
                                |                           By -

FIGURE 5-3 SITE LAYOUT PLAN

IRIS Visual Planning + Design                                                                                     Page 13
Log in to download the original file

2020-02-11 P&E Agenda - Item 1 - Attachment 2 - MCU18-0166 - Visual Impact Assessment(PDF, 7MB).pdf · 7.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.