Landscape OPW Plans 62 Rene St, Noosaville 29-01-21
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn© This drawing is copyright and is the property of John Harper Landscape Designs. This drawing must not be retained, copied or used without permission.
CONSTUCTION NOTES: 25lt TREE PLANTING DETAIL 1:20
GENERAL CAUTION AND NOTES:
Do not scale off the plan. Verify all areas and length on site prior to commencement of works. Locate all services prior to commencement of works.
SITE PREPARATION:
All areas designated for landscaping are to have existing weeds and grass dead wood and rubbish completely removed off site prior to commencing works.
The civil contractor will excavate and store site soil for later reuse and will prepare subgrade to start levels for landscaping, but it is the landscape contractor’s
obligation to cultivate and prepare the subgrade and site soil for planting and turfing as described below.
SOIL:
Ground Gadens: Use existing site soil where possible and improve with a soil conditioner to provide a free draining A grade planting medium. Existing soils are
to be sieved to remove any extraneous material, rocks and rubbish prior to incorporation of soil conditioner. Mix the soil conditioner with the site soil to
manufacturer’s recommendation for the soil type.
Planter Boxes (if required): Install a high‐grade podium mix. The media is to be free draining, free rocks and deleterious material and suitable for container planting.
Finished soil depth is to be 300mm for gardens and 100mm for turf areas (where included). During planting, holes for all plants are to be excavated to 3 times
the volume of their containers and then backfilled with the amended site soil. Water the installed plant to field capacity immediately after planting.
GARDEN EDGING:
Garden edging is to be installed between all turf areas and gardens along Rene St. Edging is to match the existing timber edging on stage 1, but otherwise to be hardwood
(HWD) timber edging secured to the ground with 300mm HWD pegs to support the edging. Ensure all edging is straight and even, with the top of the edging a minimum
of 25mm above the surrounding turf.
PLANTS:
All plant stock is to be A grade free from pest and diseases. All stock is to be sun hardened with root systems that have filled out but not root bound. All plants are
to be fertilised at the time of planting with 6‐month slow release fertiliser.
MULCH:
Organic ‐ use A grade organic mulch like Pine Bark, Forest mulch or Hoop pine mulch installed to a depth of 100mm.
Inorganic – if required as an alternative in some areas, inorganic mulch is to be clean river pebble or equivalent installed on
weed mat. Pebble should be a mixed grade between 20 & 50mm but no larger than 50mm. Installed inorganic mulch to a minimum depth of 75mm.
All mulch must be free of weeds, pests, diseases and rubbish.
IRRIGATION:
All internal landscape areas are to be irrigated by an automatic irrigation system. The system is to have the following feature as a minimum:
‐ The system is to be controlled by an AC powered automatic irrigation controller.
‐ Water supply will be via mains, so a non‐return valve suitable for the system (e.g. RPZ) and to council requirements is to be installed upstream of the
irrigation manifold.
‐ Regulation of water supply is to be via solenoids connected to the auto controller.
‐ Irrigation to garden areas to be via pressure compensating inline drippers.
‐ At the end of construction, the contractor is to supply detailed and accurate ‘as constructed’ irrigation plan/s, showing the location of all irrigation
lines, valves, filters, non‐return valves, solenoids, pop up sprinklers and irrigation controller/s.
MAINTENANCE:
The completed works are to be maintained on an ongoing basis but for the first 3 months the landscape is to be maintained to the following minimum standards: GARDEN EDGING DETAIL 1:20
• All landscaped areas are to be watered regularly to ensure that plants and turf establish and maintain a health and normal growth rate.
• All areas indicated on these plans are to be kept free of weed species through a program of hand pulling and herbicide spraying.
• All dead plants are to be replaced immediately with the same species.
• All turf areas are to be kept neat and tidy at all times.
REVISIONS
CONSTRUCTION NOTES & DETAILS * Do not scale from drawing
Title Job Number 21014 Issue Date 29/01/2021 A OPW SUBMISSION * Verify the location of all services before
PO Box 1031,
Client: commencement of works
Proserpine, QLD, 4800
* All works to comply with Australian Standards M: 0417 195 059
Project 62 RENE ST, NOOSAVILLE Drawing Number LP 04 Revision A SHARPE ENTERPRISES PTY LTD * Works to comply with all relevant laws,
E: [email protected]
W: jhld.com.au
LOT 591 ON RP 228906 regulations, building codes & approvals
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.