2937 Transmittal
From the archive 2937_DA01-15.zip, inside MCU16/0143 - Settlers Cove - information response plans - email 1 of 3. File date in the archive: 2017-03-15 16:29.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn TRANSMITTAL REGISTER
TO: ATTENTION:
CLIENT: CBD Settlers Cove
PROJECT: Proposed Unit Development, Settlers Cove Stage 4a & Stage 4b PAGE 1 OF 2
2937
DAY 28 11 25 28 08 15
MONTH 10 11 01 02 03 03
YEAR 16 16 17 17 17 17
DWG No. DRAWING DESCRIPTION DRAWINGS SENT INDICATED BY ISSUE LETTER
DA01 Project Summary NTS 01 02 03 04 04
DA02 Site Plan Basement 1:250 01 02 03 04 04
DA03 Site Plan Level 1 1:250 01 02 03 04 04
DA04 Site Plan Level 2 1:250 01 02 03 04 04
DA05 Site Plan Level 3 1:250 01 02 03 04 04
DA06 Site Plan Level 4 1:250 01 02 03 04 04
DA07 Site Plan Level 5 1:250 01 02 03 04 04
DA08 Stage 4a Basement Recreation Area 1:100 01 02 03 04 04
DA09 Stage 4a Basement Floor Plan 1:100 01 02 03 04 04
DA10 Stage 4a Level 1 Entry 1:100 01 02 03 04 04
DA11 Stage 4a Level 1 Floor Plan 1:100 01 02 03 04 04
DA12 Stage 4a Level 2 Floor Plan 1:100 01 02 02 03 03
DA13 Stage 4a Level 3 Floor Plan 1:100 01 02 02 03 03
DA14 Stage 4a Level 4 Floor Plan 1:100 01 02 03 04 04
DA15 Stage 4a Level 5 Roof Plan 1:100 01 02 03 04 05 05
DA16 Stage 4a South & North Elevations 1:100 01 02 03 04 04
DA17 Stage 4a East & West Elevations 1:100 01 02 03 04 04
DA18 Stage 4a Section A 1:100 01 02 03 04 04
DA19 Stage 4a Recreation Area 1:100 01 02 02 03 03
DA20 Stage 4b Basement Floor Plan 1:100 01 02 03 04 04
DA21 Stage 4b Level 1 Recreation Area 1:100 01 02 03 04 04
DA22 Stage 4b Level 1 Floor Plan 1:100 01 02 03 04 04
DA23 Stage 4b Level 2 Floor Plan 1:100 01 02 02 03 03
DA24 Stage 4b Level 3 Floor Plan 1:100 01 02 02 03 03
DA25 Stage 4b Level 4 Floor Plan 1:100 01 02 02 03 03
DISTRIBUTION No. OF COPIES
CBD Settlers Cove 1 1 1 1 1
Martoo Consulting. 1
REASON FOR ISSUE
P PRELIMINARY A CLIENT APPROVAL RE REVISION
DA DEVELOPMENT APPROVAL R REQUESTED
DA DA DA DA DA DA
BA BUILDING APPROVAL OW OP WORKS APPROVAL
T TENDER C CONSTRUCTION X INFORMATION
DELIVERY
M MAILED P PICKUP E EMAILED
E E E E E E
C COURIER D DELIVERED F FTP SITE
PLAN SIZE: AO, A1, A2, A3, A4 A1 A1 A1 A1 A1 A1
FORMAT: P PDF, D DWG, PT PLOT FILE, H HARD COPY, CD P P P P P P
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.